An RFID board that allows operators to collect work performance data simply by placing a card!
It is a digital tool that easily visualizes the movement of people and the flow of products. By simply holding an RFID card up to the reader, you can obtain information on when items were started and completed. The data is accumulated, allowing for subsequent analysis. If you have any of the following issues, please consult with us!! ● When did this work instruction start? When did it finish? ● Where is the work instruction that was inquired about? ● How much labor was spent on this work instruction? ● This work instruction is taking a lot of effort, but what is the cause? ● There are many personnel changes and support, making it difficult to keep records of the work! ● There are interruptions and call-outs, making it hard to know the actual time? ● Managing the curing time for each work instruction is cumbersome and prone to errors! ● The output and defect numbers are also handwritten, and entering them into the computer is a hassle! ● It is unclear whether the allocation of personnel for each process is appropriate!
Inquire About This Product
basic information
"I will be active in such factories!" ◎ The products and goods are relatively large. ◎ The factory buildings and equipment are large. ◎ Multiple people are working on a single kanban. ◎ The work-in-progress and lead times are long. ◎ The labor costs for the products (work costs) are not well understood. ◎ Workers are moving between multiple work areas and processes. ◎ It is difficult to record work performance by hand. ◎ No work performance records are being kept. ◎ The accuracy of recorded work performance is rough. ◎ Work performance is being input through terminal operations.
Price range
Delivery Time
Applications/Examples of results
*For more details, please refer to the materials.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in the manufacturing industry, including revenue enhancement, productivity improvement, lead time reduction, and inventory reduction through the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create tailored original programs that address each company's specific management challenges, progressing from "on-site improvements" to "system improvements" and then to "production innovation," providing appropriate solutions. If you encounter any issues that need to be resolved, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astec Consulting HP] https://www.ast-c.co.jp/