In case of any ground issues, we will solve them. "The house is leaning" "I want to remove the piles."
In the event of any differential settlement, we will serve as a consultation point and support you until the issue is resolved. We also provide guarantees after settlement correction. Additionally, we accept orders for the extraction of existing piles.
Inquire About This Product
basic information
There are three key points to settlement correction and pile extraction work. 1. Nationwide Coverage …By collaborating with over 70 reliable ground companies across the country, we have a robust system that can respond anywhere in Japan. 2. Fair Pricing …A team of experienced ground professionals will consider appropriate settlement correction and pile extraction work. We deliver safe construction at a reasonable price. 3. 20-Year Ground Warranty …In the case of settlement correction work, we provide a comprehensive ground warranty that can also address any potential re-settlement after the correction.
Price information
Estimates will be provided on a case-by-case basis. Please feel free to contact us for initial consultations and estimate inquiries.
Delivery Time
※The construction period varies for each project.
Applications/Examples of results
**[Settlement Correction Work]** There are two methods as follows: 1. **Underpinning Method** …The underpinning method involves using jacks to level a settled house back to its original position. The weight of the house is used as a reaction force to drive prefabricated piles, such as steel pipe piles, into the ground until they reach the supporting soil for restoration. 2. **Pressure Plate Method** …After the settlement of the building has stabilized, the foundation is excavated, and jacks are placed on a rubble pile made of blocks and steel plates to correct the building's tilt. This method does not require large tools or materials, resulting in fewer areas needing demolition and reduced repair costs. It can be performed with minimal vibration and dust, allowing residents to remain in the building during construction. **[Pile Extraction Work]** …In the extraction work of existing piles, depending on the type of pile, the first step is generally to cover the pile head with casing and drill to eliminate friction between the ground and the existing pile, a process known as "cutting the edge." After that, the extraction is carried out using a method suitable for the site conditions and soil type.
catalog(2)
Download All CatalogsCompany information
Zainju Business Co., Ltd. is developing various businesses to support housing developers. We have established a range of support systems, including structural design consulting, site surveys and government office investigations, ground service projects, and housing-related services.