[Construction Case] Supermarket: Floor Deflection Correction / Settlement Correction Work
Correction during nighttime while business is suspended! A case of correcting floor sagging due to ground subsidence in a short construction period.
We would like to introduce a case of "floor deflection correction" and "settlement correction work" carried out at a certain supermarket in Ibaraki Prefecture. The customer in this case was troubled by the floor inside the store being deflected due to settlement. Using the Upcon method, the work was conducted only at night, with minimal impact on business. The work was completed in a short period of two days without closing the store. 【Case Overview】 ■ Construction Area: Approximately 450m2 ■ Maximum Settlement Amount: Approximately 83mm ■ Area: Ibaraki Prefecture ■ Construction Period: 2 days *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.