[Construction Case] Leisure Facility: Subfloor Settlement Correction Work (Ibaraki Prefecture)
Due to the impact of the Great East Japan Earthquake, subsidence occurred! Adjustments of 350m2 were made over four consecutive nights of construction.
Here is a case study of "subfloor sinking correction work" conducted at a leisure facility in Ibaraki Prefecture. We carried out correction work for a significantly sunken floor in the pachinko area within the facility. Sinking was also observed in other areas, including in front of the machine room and in the restrooms, and we performed sinking correction work over a total construction area of approximately 350m2 over four consecutive nights. [Case Overview] ■ Construction Area: Approximately 350m2 ■ Maximum Sinking Amount: 93mm ■ Area: Ibaraki Prefecture ■ Construction Period: Four consecutive nights (2011) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.