[Construction Case] Nursing Facility: Sunken Floor Correction Work
Up to 60mm of subsidence in the central Slavic region! Ground compaction reinforcement with the foaming pressure of polyurethane resin.
Here is an example of "floor sinking correction work" carried out at a nursing care facility located in Shizuoka Prefecture. Due to weak ground, ground subsidence occurred, resulting in sinking floors within the facility. During a preliminary survey, a maximum subsidence of 60mm was observed at the center of the slab, and a gap of 50mm was confirmed near the beams. Using the foaming pressure of polyurethane resin, the ground was compacted and reinforced, filling the gaps between the slab and the ground, while simultaneously correcting the floor sinking. 【Case Overview】 ■ Construction Area: Approximately 60m2 ■ Location: Nursing care facility in Shizuoka Prefecture ■ Construction Period: 1 day *For more detailed information about the case, please refer to the related links. For further details, please check the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*The details of the case can be viewed via the related link. For more information, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
The details of the case can be viewed through the related link. For more information, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.