[Construction Case Study] Slab Foundation House: Settlement Correction Work Due to Liquefaction - Site Tour
A case study of correcting liquefied ground due to the earthquake! A maximum settlement of about 60mm was corrected in a day and a half.
We would like to introduce a case of "settlement correction work" carried out on a slab foundation house located in Urayasu City, Chiba Prefecture. The house sank due to the impact of the Great East Japan Earthquake. The maximum settlement of approximately 60mm was corrected in 1.5 days. Additionally, there were many requests to visit our construction site, so with the kindness of our customers, we held an open house at this site. Many people were able to visit and observe the work. 【Case Overview】 ■ Maximum Settlement: Approximately 60mm ■ Area: Urayasu City, Chiba Prefecture ■ Construction Period: 1.5 days *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.