[Construction Case] Elementary School (Classroom): Settlement Correction Work
Concerns about children's safety and health! A case of correcting floor sagging in the classroom within a short construction period.
We would like to introduce a case where we performed "subsidence correction work" in an elementary school classroom in Miyagi Prefecture. In this classroom, floor sagging occurred due to ground subsidence, raising concerns about the safety and health of the children. We raised the floor using the foaming pressure of polyurethane resin, correcting the maximum subsidence from -112mm to the planned value of -22mm. [Case Overview] ■ Construction Area: 1406m2 ■ Maximum Subsidence: 112mm ■ Construction Period: 6 days ■ Area: Miyagi Prefecture *For more details about the case, you can view it through the related links. For more information, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
*You can view the detailed information about the case from the related link. For more details, please refer to the PDF document or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*You can view the detailed information about the case from the related link. For more details, please refer to the PDF document or feel free to contact us.*
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.