If you're troubled by scale in your cooling tower, try "Aqua Crystal Ring."
Aqua Crystal Ring (abbreviated as ACR) that completely removes scale without chemicals.
For those struggling with scale removal in cooling towers
**For those struggling with scale removal in cooling towers** Stubborn scale that won't come off even with chemicals, will be completely removed with "zero chemicals"! **We can solve all these problems!** ✓ The scale is really bad. ✓ Cooling efficiency has decreased, and there are occasional abnormal shutdowns. ✓ The filler is clogged with scale. ✓ It’s hard to remove even with chemicals. ✓ Maintenance effort and frequency have increased. ✓ I want to reduce chemical costs. **Five benefits of choosing us** ■ Benefit 1: Significantly improved cooling efficiency! We remove scale and restore the original cooling performance. ■ Benefit 2: No chemicals, power, or construction needed! Just place it in water. No special work is required. ■ Benefit 3: Maintenance-free Just wipe the main unit with a cloth when it gets dirty. Maintenance is completed in one minute! ■ Benefit 4: Reduced running costs No need for chemicals, electricity, or additional maintenance costs. Significantly cut expenses. ■ Benefit 5: Environmentally friendly Contributes to reducing waste and CO2 emissions with zero chemicals and power. ★ Moreover, to prevent the reattachment of scale, the lifespan of the equipment and piping inside the cooling tower is greatly extended.
Inquire About This Product
Related Videos
basic information
【Recommended for companies like these】 ✓ Cannot use chemicals due to hygiene or manufacturing reasons ✓ Hesitant to introduce large devices such as "electrolytic scale removal systems" ✓ Prefer minimal maintenance ✓ Previous scale countermeasures have not been effective 【Three features of our product】 ■ Feature 1: Easy installation without construction or tools Installation is as simple as attaching it with the included insulock. Anyone can easily install it. ■ Feature 2: Can be installed without stopping operation It can be introduced simply by placing it in water, without needing to stop operation. *In some cases, stopping operation may be necessary. ■ Feature 3: Can be installed regardless of size or type It can be introduced into any cooling tower, regardless of size, shape, or type. 【Specifications】 ・Size: Diameter 100mm, Thickness 30mm ・Material: Plastic (hardened polyethylene) ・Included accessories: Chain, zip ties ・Operating temperature range: 1℃ to 80℃ ・Warranty period: 3 years For information on the safety of our product (Product Safety Data Sheet/SDS), please visit our company website below. https://acr.archives.co.jp/specification/
Price information
Please send us the specifications of the cooling tower you are having trouble with, along with any current photos if possible. We will propose the optimal plan and estimate for where and how many units should be installed.
Delivery Time
P4
※After placing the order, we will deliver it within 5 business days. Installation can be done on the same day the product arrives (estimated time: about 10 minutes).
Applications/Examples of results
■Example 1: A major hotel in Tokyo - Cooling tower for air conditioning (1800RT) A large cooling tower that has been in operation for 25 years. The cooling efficiency had significantly declined due to scale and rust, and they were considering replacing the cooling tower. Including disposal, new installation, piping work, and losses due to downtime, the estimated cost was about 200 million yen. They decided, "It wouldn't be too late to try this product first," and installed it. As a result, they achieved scale removal and rust suppression, extending the life of the cooling tower and significantly reducing costs. (After that, it was also installed in related hotels such as Hakone and Ito.) ■Example 2: A major ice manufacturing company in Saitama - Cooling tower (125RT) A cooling tower that had been in operation for 18 years. A significant amount of scale had accumulated on the filler, leading to a decline in cooling efficiency. They were troubled because the scale could not be removed even with chemical treatment. About 10 months after installation, approximately 20 kg of scale was removed, and cooling efficiency was restored. (After that, it was also installed in another cooling tower.) ★In addition, we have a cumulative total of over 100 installation cases, regardless of large, medium, or small sizes. We provide detailed introductions with photos in our 'Case Study Collection,' so please download it now and check the effects.
catalog(7)
Download All Catalogs![Examples of Water Quality Improvement and Their Mechanisms of Action [Technical Explanation Document Vol. 2]](https://image.mono.ipros.com/public/catalog/image/01/85f/782048/IPROS18368950748525756649.png?w=120&h=170)
News about this product(2)
Company information
Archive Co., Ltd. is engaged in the sale of the "Aqua Crystal Ring (ACR)," which enables scale removal and red water countermeasures for cooling towers. By introducing the Aqua Crystal Ring (ACR), you can eliminate stubborn scale that could not be removed even with chemicals. ✓ Installation is easy; just place it in water. ✓ No chemical spraying is required. No power supply is needed. ✓ No maintenance is required. Since scale is removed thoroughly, cooling efficiency improves, allowing for cost reductions in electricity and other expenses. As it does not use chemicals, it is also environmentally friendly and contributes to SDGs and decarbonization. It is truly a scale removal device that balances economic benefits and environmental performance. For the past 17 years, many customers have adopted our product, and we have received expressions of gratitude. It is common for customers to first try it on one cooling tower, experience the effects, and then expand its use to all other cooling towers. We encourage your company, which is struggling with scale removal, to introduce our product, resolve your scale removal issues, and restore the original cooling efficiency of your cooling towers. And achieve cost reductions!