A case where a building affected by winter water damage was rapidly dried using a modular system installed in four buildings.
We would like to introduce a case where Ashcourt Group implemented a modular mobile heater and a 30kVA generator. At the company's construction site, winter weather caused damage to the interiors, leading to delays and difficulties for the workers. To address this, they installed equipment that combined a 125kW heater with ducts connected to a 30kVA generator. To minimize the installation area, it was connected to a 1,000-liter fuel tank. As a result, they were able to overcome the adverse winter weather and adhere to the project schedule. [Challenges] - There were delays in the construction schedule for four student dormitories. - Winter weather caused damage to the interiors. *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Results】 ■ Despite bad weather, the project was completed ahead of schedule. ■ Savings were achieved by using only one heater for every four buildings. ■ By consolidating power and temperature control into one package, only one supplier was needed. ■ Saved time on coordination and management, such as sending contacts and invoices. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company supports customers around the clock to supply the necessary power, as well as heating and cooling. All of this is driven by our trademark passion, unparalleled international experience, and the knowledge gained from it. From urban development to commercial projects and life-saving efforts, we deliver our expertise and equipment anywhere from major cities to remote rural areas.