Reduction of inventory work hours by over 1,000 hours" and "Achieved an annual reduction of 1,210 hours!
Are you struggling with issues such as "the burden on the site due to analog inventory management" and "manual ordering tasks"? This document summarizes case studies from the circuit board assembly industry that successfully improved operational efficiency and productivity by implementing SmartF. It specifically explains how SmartF addressed the inefficiencies of increased component inventory due to business expansion and analog management through handwritten methods, in a Before/After format! 【Case Study Highlights (Partial)】 ■ A case where handwritten entries on shelf cards and manual inventory checks were eliminated, resulting in a total reduction of over 1,000 hours in labor. ■ A case that achieved a reduction of 1,210 hours in labor annually through paperless and efficient ordering processes. ■ A case where sending errors in ordering emails were eliminated, and the electronic storage of order data was automated. \\ A PDF summarizing the details of these case studies is available for free! // You can view it by downloading from the "Download Catalog" link below, so feel free to download it.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
- Based on a wealth of over 250 successful contract development projects in the manufacturing industry, we planned and developed the production management cloud system "Smart F." - A professional company specializing in DX for the manufacturing industry, well-versed not only in IT technology but also in the operations of manufacturing sites.