The goal is to increase the storage capacity of the existing silo! The rough construction period is about 6 days.
We would like to introduce the cement silo elevation construction. The purpose is to increase the storage capacity of the existing silo. This allows for an increase in storage capacity within a limited space on the site. The rough construction period is about 6 days. *For detailed information on the case, please refer to the related link. For more details, you can download the PDF or feel free to contact us.
Inquire About This Product
basic information
*You can view the detailed information about the case from the related link. For more information, please download the PDF or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
*You can view the detailed content of the case from the related link. For more information, please download the PDF or feel free to contact us.*
catalog(1)
Download All CatalogsCompany information
Showa Koki Co., Ltd. has developed alongside our customers by engaging in the construction and maintenance of cement logistics equipment and concrete manufacturing equipment. We have established a system to cover all services related to ready-mixed concrete and cement. From proposing and constructing batch plants to maintenance services that ensure high-quality shipments, our mobile silo service that is highly active on-site, manufacturing various products, building powder equipment, mechanical design, and electrical design, we have organized our system to assist in various aspects meticulously. Please feel free to contact us with your requests.