We will introduce examples of projects where we undertook not only mechanical and electrical work but also scaffolding and exterior construction.
We would like to introduce the installation work of the powder mixing and shipping equipment that was completed in December 2024. In this project, we frequently used cranes for tasks such as tank installation and bucket elevator assembly. We ensured safety by checking the surroundings during the lifting of materials. Since we handled not only mechanical and electrical work but also scaffolding and exterior construction, various contractors were involved on-site, making schedule coordination challenging. However, we completed the work on time as planned, and we received words of appreciation from our client. 【Project Overview】 ■ Duration: Approximately 1.5 months ■ Scope of Work: Mechanical and electrical work, as well as scaffolding and exterior construction ■ Outcome: Completed on schedule, receiving words of appreciation from the client *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Showa Koki Co., Ltd. has developed alongside our customers by engaging in the construction and maintenance of cement logistics equipment and concrete manufacturing equipment. We have established a system to cover all services related to ready-mixed concrete and cement. From proposing and constructing batch plants to maintenance services that ensure high-quality shipments, our mobile silo service that is highly active on-site, manufacturing various products, building powder equipment, mechanical design, and electrical design, we have organized our system to assist in various aspects meticulously. Please feel free to contact us with your requests.