[NMR Pipe Protector Withdrawal Investigation] Yaesu Entrance Hall Rust Prevention Effect Verification
A galvanized steel cooling pipe with a durability of 20 years demonstrated rust prevention after 58 years of removal.
The air conditioning cooling water piping at the Yaesu Exit Hall was made of galvanized steel pipes and had significant red rust corrosion. After installing NMR pipe protectors at three locations, including the cooling water piping, the water inside the pipes became clear within a week, and the total iron content due to red rust decreased from 11 mg/L before installation to less than 0.1 mg/L, approximately one-hundredth of the original level. In December 2023, 58 years after construction, when the piping for the air conditioning cooling water was removed, there was no visible red rust inside the pipes, and there was almost no thinning of the material. A thin layer of soft calcium scale that could be removed with a finger was formed on the inside, and the general contractor representatives present confirmed that a black rust layer covered the entire inner surface of the piping beneath it. Measurements of the pipe wall thickness at four locations with calipers showed all were 5.9 mm, which is nearly equivalent to a new 200A galvanized steel pipe (JIS standard 5.8 mm). The general contractor representatives responsible for the cutting and the facility personnel of the building were very surprised by the results.
Inquire About This Product
basic information
[Installed Piping/Installation Quantity] ■ New building system cooling tower secondary side cooling water (outgoing) piping (SGP pipe 150mm) / PT-150DS × 1 unit ■ Old building system cooling tower secondary side cooling water (outgoing) piping (SGP pipe 150mm) / PT-150DS × 1 unit ■ Chilled water (return) header secondary side chilled water (return) piping (SGP pipe 200mm) / PT-200DS × 1 unit *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
~Extending the lifespan of old piping~ "NMR Pipe Protector" Cumulative installation record surpasses 4,400 buildings! (As of July 2025) Among them, over 3,100 buildings are condominiums. = Domestic Achievements = New Chitose Airport Domestic Terminal, JR Sapporo Station (JR Tower Building), Imperial Theatre Building (Tokyo Marunouchi), Yaesu Exit Hall, Famous Bookstore Building (Shinjuku), Hotel Toyokaku (Kyoto), Hotel Serve Shibuya, Shirakagi Care House (Saitama), Kawanishi Private Kushi Elementary School, Food Processing Factory, Major Automobile Manufacturer Factory (Fukuoka Prefecture), Kumamoto Red Cross Hospital, etc. = International Achievements = Buckingham Palace, London City Hall, British Museum, BBC, Christ's College, University of Cambridge, Royal Bank of Scotland, Harrods Department Store, Royal Garden Hotel London, UK Parliament, etc. ★ Featured in the Media "NMR Pipe Protector" ★ Selected as one of the top 10 rust prevention technologies in the world in 2020 and introduced in a U.S. magazine! Case studies and customer testimonials have been featured in many media outlets, including TV Tokyo's "World Business Satellite (WBS)", TOKYO MX's "Corporate Spirit", and specialized newspapers "Condominium Management News" and "Air Conditioning Times".

