Can operate before the system power arrives! Aggreko's temporary power solutions.
Nationwide support for "places where power is isolated," such as farms, factories, and infrastructure construction.
Achieving zero power outage periods! A nationwide temporary power supply solution that does not stop "isolated power locations" such as farms, factories, and infrastructure construction.
Aggreko's temporary power solutions provide a service that allows immediate access to the necessary electricity in areas where grid power infrastructure is lagging or in new development sites. Even in locations where power tends to be isolated, such as mountainous areas, coastal regions, and remote islands, we offer a one-stop service from the design of power generation equipment to installation, operation, and maintenance. By eliminating the "waiting period for power" before starting operations and enabling immediate equipment activation, we minimize production losses. We also accommodate flexible designs, including adjustments to fuel specifications for existing equipment, ensuring stable power supply that keeps operations running in "power-isolated locations" such as factories, farms, and infrastructure construction. **Features** - Operate in as little as 14 days: Rapid implementation from site survey to installation and trial operation. - Capable of large-scale power: Flexible configuration of MW-class power generation equipment. - Deployable nationwide: Supports power-isolated areas such as mountainous regions, remote islands, and coastal areas. - One-stop support: Centralized management of all processes from design to installation, operation, and maintenance. - High compatibility with existing equipment: Custom specifications tailored to fuel and equipment conditions. *Free explanatory materials with case studies are currently available! Please check the catalog download for more information.*
Inquire About This Product
basic information
**Case Study: Increased Production at a Large-Scale Egg Production Facility in the Mountainous Region of Shizuoka Prefecture** **Background** Required Power: 2MW Existing Power Grid Supply Capacity: 0.5MW It takes over 2 years to develop the power infrastructure. **Challenges** Insufficient power needed for production enhancement. Unable to expand operations until the grid power is established. **Aggreko's Response** Engineers conducted a detailed site survey. Proposed four 1400kVA generators (totaling 2MW). Carefully adjusted design and operational conditions with the factory. Installation to operation completed in 14 days. **Special Measures** Responded to the request to continue using A heavy oil (AFO) currently in use at the factory. Custom-designed fuel supply system including dedicated pumps and filters. **Results** Eliminated the "gap period" until grid power is available. Secured necessary power immediately without halting production. Allowed for planned equipment expansion to proceed as scheduled. *Free explanatory materials with case studies are currently available! Please check the catalog download for details.*
Price range
Delivery Time
Applications/Examples of results
*We are currently offering a free explanatory document with case studies! Please check it out via the catalog download.*
catalog(1)
Download All CatalogsCompany information
Our company supports customers around the clock to supply the necessary power, as well as heating and cooling. All of this is driven by our trademark passion, unparalleled international experience, and the knowledge gained from it. From urban development to commercial projects and life-saving efforts, we deliver our expertise and equipment anywhere from major cities to remote rural areas.






