Adopted by cable manufacturers worldwide! Improve reliability with ALROC products.
In the data center industry, stable operation 24/7 is required, and the reliability of power supply is the most critical issue. Poor connections of underground power cables can lead to power outages, resulting in data loss and service interruptions. ALROC's underground power cable preprocessing tools enhance the quality of cable handling and improve connection reliability, contributing to the stable operation of data centers. 【Usage Scenarios】 - Power supply infrastructure for data centers - Connection work for underground power cables - Maintenance work for cables 【Benefits of Implementation】 - Improved reliability of cable connections - Reduced risk of power outages - Increased work efficiency
Inquire About This Product
basic information
【Features】 - A diverse lineup of tools including sheath removal tools, insulator/external conductor multifunctional tools, and external conductor trimming tools. - Compatible with special high-voltage cables for underground power transmission of 66kV and above. - High-quality tools made in France. - Achieves both reduced working time and improved quality. - Designed for ease of use, even without specialized knowledge. 【Our Strengths】 - Nearly 30 years of experience and know-how as a specialized trading company for power-related materials. - Providing high-quality European tools as the exclusive distributor in Japan. - As a problem-solving proposal company, we suggest the most suitable products for our customers' challenges. - A sales network that spans the entire country and a rapid support system.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Hokkaido Daiy Tech Co., Ltd. was established in 1995 and started its business by selling underground cable construction materials, cable connection materials, and conductor accessories for the power-related industry. Following changes in social conditions, we have expanded our scope to include overhead construction materials, renewable energy, cable joint trench construction, and construction materials for substations. We are a problem-solving proposal-based company focused on finding and suggesting products to resolve issues faced by our users. Our staff has nearly 30 years of know-how and experience since our founding. We always strive to stand in the users' perspective and provide new value. The company is located in Sapporo, Hokkaido, but we have partner companies and distribution channels throughout the country. We import construction materials and tools from advanced European countries such as Italy, France, and the Netherlands that make electrical work easier, more efficient, and faster, and supply them domestically as the general agent in Japan. We believe that our long-standing know-how and knowledge will surely be of help to everyone. Please feel free to consult with us.











