A renewal that only focuses on appearance is almost always a failure. We first design and create the "structure" and "flow" that will get the sales moving.
The corporate website for manufacturing companies is not just a business card but a "receptacle for sales." However, many corporate sites lack organized information about their business, strengths, and products, leading to a situation where visitors leave without understanding "what kind of company it is," "unable to make comparisons," or "lacking materials for internal approval." As a result, even with traffic, inquiries do not increase. Our service organizes the corporate structure (business × sales) in line with the B2B decision-making process in manufacturing (information gathering → comparison → internal approval → consultation) and designs pathways to increase direct searches and inquiries before creating the corporate site. The design is optimized not as a goal but as a "vessel" that supports trust-building and user navigation. ■ Service Offerings (3 points) 1. Strategic Design (target audience, appeal axis, competitive comparison, organization of internal approval points) 2. Information Design (sitemap, pathways, page roles, content design) 3. Production (design, implementation, user-friendly CMS design) Deliverables: Complete set of corporate website for manufacturing (design documents, wireframes, design, implementation, publication) *Please share the current URL (or existing materials). We will first identify the "causes of lack of inquiries" structurally.
Inquire About This Product
basic information
■Provided Content Organization of Corporate Structure (Business × Sales × Information) - What, to whom, and why one is chosen (Appeal Axis) - Organization of products, technologies, and applications (Category Design) - Judgment criteria for winning in competitive comparisons (Selection Conditions) Design of User Flow (Inquiry Generation Type) - Entry: Landing page design by issue/application/technology - Navigation: In-depth flow from products → case studies → FAQs → materials → consultations - Approval: Materials for purchasers and decision-makers (reassurance, basis, structure) - CTA: Consultation permission type / rough consultation / estimate condition confirmation (staged) Production (Based on Operation) - Design: Structure that allows information to be readable without breaking the worldview (aesthetic of subtraction) - CMS: Design that is easy to update (operational personnel, authority, templates) - Measurement: State that can be improved (basic measurement design) ■Deliverables Strategy and Requirements Organization (Target / Appeal Axis / KPI) Sitemap (Page Roles / Priorities) Wireframe (Main Pages) Design (Top + Subpage Templates) Implementation (CMS / Responsive / Basic SEO) Publication and Initial Measurement Setup (as needed)
Price information
3 million yen to 9 million yen (varies based on scale, number of pages, database/multilingual/features) - Small scale (up to 15 pages, basic structure): 3 million to 4.5 million yen - Standard (up to 30 pages, including case studies/FAQs/documentation flow): 4.5 million to 6.5 million yen - Expanded (product database, search, multiple locations/multilingual, advanced CMS): from 6.5 million yen * "Estimate required" notation is also acceptable (to be confirmed based on requirements)
Delivery Time
※Minimum 2-3 months / Standard 3-5 months (depending on scale and approval flow)
Applications/Examples of results
■Concerns The site is outdated and lacks credibility (falls short compared to competitors) Products and strengths are not organized, making it unclear what the company does Inquiries are not increasing / the quality of inquiries is low Stuck in comparison and internal approval processes, not progressing to negotiations Updates are not being made, and information is outdated (high operational burden) ■Approach Pre-sharing: Current URL / product overview / competitors (as much as known is fine) Hearing: Organize sales flow, strengths, reasons for lost opportunities, and points for internal approval Design: Confirm sitemap → wireframe → design → implementation policy Production: Production to publication (staged delivery and review) Post-publication: Improvement (optional monthly follow-up also available) ■Uses Promote understanding of the company (structure that communicates at first glance) Advance consideration (preparation of comparison, internal approval, and reassurance materials) Increase inquiries / improve negotiation conversion rates (optimize pathways) Establish an operational system that allows for updates (CMS design) ■Examples of Achievements (company name not required format) Precision machining × 80 employees × unclear what the company does → Increased consultations through organizing business/use and designing pathways Industrial equipment × 200 employees × lost opportunities due to comparisons → Improved win rates by organizing decision-making criteria and internal approval materials Chemical materials × 500 employees × unable to update → Maintained information freshness through template-based operations
Company information
A site that is just cheap ultimately increases costs and risks." We propose web development that maximizes business results while thoroughly addressing essential requirements. Are you creating a website like this? - It seems that the websites of competitors look better, but you don't know why. - Every update incurs additional costs, and before you know it, expenses have ballooned beyond expectations. - While the appearance is nice, it ignores laws and industry-specific rules, leading to complaint risks... - You want to attract customers and inquiries, but the production company only talks about design. - As a result of choosing a production that is simply cheap, you are overwhelmed with trouble handling and can't focus on your core business. Point 1. Avoid troubles with a design that has no "gaps or omissions." 2. Minimize operational costs with a design that assumes in-house updates. 3. Planning power that pursues business results. "Is the initial cost a bit high?" But in the long run, it's safe and cost-effective. We have prepared a plan to truly deliver results "correctly.




![[HP Production Achievement Case] Corporate Site (Insurance Agency)](https://image.mono.ipros.com/public/product/image/7de/2000556043/IPROS01234700500382379990.png?w=280&h=280)
![[Information] To you in the manufacturing industry who thinks "things don't sell on the web"](https://image.mono.ipros.com/public/product/image/2104777/IPROS1413779670925899052.png?w=280&h=280)

![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

![[Case Study] Construction Example of High-Temperature Facilities in Factories Using High-Performance Heat Insulation Sheets](https://image.mono.ipros.com/public/product/image/962/2000579577/IPROS04218491152233419232.jpeg?w=280&h=280)
