Smoke exhaust windows and ventilation equipment are also installed! There is high light transmission even without lighting, so daytime work is not a problem.
We would like to introduce a case where we constructed a tent warehouse for material processing and storage at our factory. For living spaces, smoke exhaust windows and ventilation systems have been installed. Even without lighting, there is high daylighting, allowing for work to be carried out without issues during the day. Takashima Co., Ltd. responds to various requests regarding tent warehouses and system buildings based on many years of experience and achievements. We offer a consistent response from planning and design to construction and aftercare. As a manufacturer of tent warehouses, we also handle optional construction work such as foundation work, ground improvement work, and electrical and fire protection equipment installation, broadly addressing our customers' concerns. [Overview of Achievements] ■ Type: Tent Warehouse ■ Purpose: Product Storage ■ Construction Location: Somewhere in Fukuoka Prefecture ■ Size: W15m × L24m × Eave Height 5m *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The Takashima Group approaches society with original ideas and actively seeks to contribute to the world. By being helpful to society, we aspire to be a corporate group that also develops as a result. We respond to various solutions with our development proposal capabilities and comprehensive completion abilities. We coordinate a wide range of processes from design to manufacturing, processing, and delivery, providing alternatives and improved products that reduce environmental impact on building energy utilization, social environments, and materials. Additionally, we address the demands of a declining population and efficiency through unitization that incorporates labor-saving concepts, new construction methods, and new products in manufacturing and processing.








![[Tent Warehouse Construction Case] Company D, Aichi Prefecture](https://image.mono.ipros.com/public/product/image/750/2001209138/IPROS44486814209742384604.png?w=280&h=280)

![[Construction Examples] Tent Warehouse & Fixed Warehouse](https://image.mono.ipros.com/public/product/image/216/2001155733/IPROS89027483056992695142.jpeg?w=280&h=280)

![[Leveling Correction] Leveling correction of concrete floors "Teratec Method"](https://image.mono.ipros.com/public/product/image/d08/1267539002/IPROS70063422645318547243.jpeg?w=280&h=280)

