Conducting load tests for emergency generators based on the Fire Service Act, responding with a type of preventive alternative measures.
We will conduct load testing of emergency generators as required by the Fire Service Act. We accommodate both implementation types (simulated load tests and actual load tests) and preventive alternative measures (internal inspections and parts replacements). Emergency generators require internal inspections every six years, and annual inspections are also mandatory. GearMix will select appropriate methods and conduct inspections and tests in compliance with regulations. We will respond quickly from five locations nationwide (Osaka, Tokyo, Nagoya, Hiroshima, and Fukuoka).
Inquire About This Product
basic information
【Testing Methods】 ■ Implementation Type - Pseudo Load Test: Load operation using a dedicated load testing machine - Actual Load Test: Load operation using actual facility load ■ Preventive Alternative Measures - Internal Inspection, etc.: Observation and cleaning of the engine interior - Parts Replacement: Maintaining performance through the replacement of consumable parts 【Supported Manufacturers】 All manufacturers supported (Yanmar, Mitsubishi, Denyo, etc.) 【Frequency of Support】 - Annual inspection (Article 17-3-3 of the Fire Service Act) - Internal inspection, etc. or load test every 6 years
Price range
Delivery Time
Applications/Examples of results
【Target Facilities】 - Hospitals and welfare facilities (facilities required to have emergency power generation equipment) - Hotels, inns, and commercial facilities - Office buildings and apartments - Factories, warehouses, and data centers 【Track Record】 - Track record of emergency generator load testing at a certain building in Moriguchi City - Nationwide support centered in Osaka Prefecture, Tokyo, Aichi Prefecture, Hiroshima Prefecture, and Fukuoka Prefecture
Company information
/






![Power Generator [Parallel Operation Capable] 1.8kVA Output Model Long Duration Generator](https://image.mono.ipros.com/public/product/image/de9/2001507379/IPROS27676588681980285293.png?w=280&h=280)
![Three-phase 200V [JPG series] 4.5kVA long-duration generator](https://image.mono.ipros.com/public/product/image/6a1/2001507492/IPROS8985931563735995437.jpg?w=280&h=280)