Here is an introduction to standard panels.
This is a plug-in handle and EMC shield front panel that complies with the following standards. We also perform assembly, including hole processing, silk printing, and gasket installation. ---------------------------------------------- - PICMG 2.0 Rev3.0 CPCI standard - ANSI/VITA1, ANSI/VITA1.1 VME64/VME64ex standards - IEC60297-3-101, IEEE1101.10/11 standards - IEC61076-4-101, IEC61076-4-113 connector standards ---------------------------------------------- We support various finishes (painting, anodizing in various colors, conductive treatment)! U-shaped blank panels and U-shaped panels with plug-in handles. 【Features】 ■ Adopts IEEE1101.10 handle ■ Complies with PICMG 2.0 CompactPCI and ANSI/VITA (VME64) standards ■ Supports small lots and short delivery times from one piece ■ Silk printing achieves a beautiful finish with UV curing printing ■ Supports assembly including hole processing, silk printing, and gasket installation.
Inquire About This Product
basic information
For more details, please refer to the catalog or feel free to contact us.
Price information
-
Delivery Time
Applications/Examples of results
For more details, please refer to the catalog or feel free to contact us.
catalog(2)
Download All CatalogsCAD data(2)
Model number | overview | File |
---|---|---|
CPCI_6U4HP(S-type) |
|
|
CPCI_6U4HP(R-type) |
|
Company information
PSP aims to be an efficient company with a small team, delivering products through its unique production management system. This system manages everything from order management to process progress management. As soon as an order is entered, the materials and parts used are quickly and automatically checked for inventory, and a work instruction is issued and put into the process. Meanwhile, materials and parts are managed using a reorder point system and are automatically ordered. This system is a total management system based on a new approach that pursues quality (Q), cost (C), delivery (D), and service (S) with a streamlined structure. Production is carried out through this new total management system that seeks quality, cost, delivery, and service with a lean structure.