[VA/VE Case] Outdoor Cabinet
A cost reduction of up to 30% is possible, and production lead times have also been shortened!
We would like to introduce a VA/VE case study for outdoor cabinets. Regarding the outdoor cabinets used for gasoline station payment machines, there was a need for cost reduction, shortened lead times, and conductivity due to the internal equipment emitting radio waves. To shorten the painting process after sheet metal processing, we proposed the use of pre-painted steel sheets called "View Coat." This eliminated the need for the painting process, resulting in a potential cost reduction of up to 30% and a shortened lead time. 【Case Overview】 ■Before - There was a need for cost reduction, shortened lead times, and conductivity for outdoor cabinets. ■After - The use of View Coat eliminated the previously essential painting process. - Achieved a cost reduction of up to 30% and shortened lead times. *For more details, please download the PDF or feel free to contact us.
- Company:佐藤電機製作所 山梨工場
- Price:Other