We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 42 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  3. スワロー工業 Niigata//Building materials, supplies and fixtures
  4. 4 コスモシステム Tokyo//Industrial Machinery
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  3. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  4. 4 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部
  5. 5 Airbag-type water stop method ABS method クロダイトグループ

Construction method Product List

226~240 item / All 1386 items

Displayed results

Sacrificial Anode Material "Galva Shield Method"

A sacrificial anode material that uses metallic zinc for electrochemical rust prevention of rebar!

The "Galva Shield Method" is a special product that wraps zinc in a special mortar and utilizes the potential difference of metals to prevent rusting of rebar. It can be installed in both maintenance and repair of concrete structures (such as salt damage, carbonation, and macrocell corrosion) as well as in new structures, offering a wide variety of options based on LCC and the condition of inherent salts. Additionally, the "Renderock Series" is used as a cross-section repair material. 【Features】 ■ NETIS Registration No. CB-020037-VE ■ Prevents rusting of rebar by utilizing the potential difference of metals ■ Can be installed in both maintenance and repair of concrete structures and new structures ■ A wide variety of options available based on LCC and the condition of inherent salts *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cutting soil reinforcement method "Green Panel (FRP pressure plate method)"

Easy to install and significantly shortens construction time! This method is also suitable for reverse installation.

This construction method involves fixing FRP lattice-shaped green panels as slope protection materials with reinforcement at the top, utilizing the tensile strength of the reinforcement to prevent slope collapse. By spraying materials such as soil onto this part, full greening, which was difficult with conventional slope protection methods, becomes possible. 【Features】 ■ NETIS Registration No. CG-010007-V ■ Lightweight at 16.8 kg due to being made of FRP ■ Easy to install ■ Significantly reduces construction time ■ High opening ratio due to lattice shape, enabling full greening *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Danby method

Construction is possible only in the work zone on the road without excavation! A new pipeline is formed inside the existing pipe.

The "Danby Method" is a technique for rehabilitating damaged or aging pipes in sewers, agricultural water systems, and sluice gates without excavation. A rigid PVC strip is fed into the existing pipe from a manhole, and while spirally winding it along the inner surface of the pipe, adjacent strips are joined using a fitting component to form a continuous pipe body. After that, using a spacer for injecting filler material, which is pre-installed above the existing pipe, the filler material is injected into the gap between the strip pipe and the existing pipe, resulting in a composite pipe that is integrated with the existing pipe, exhibiting high strength and water tightness. 【Features】 - Construction is possible only in the work zone on the road without excavation. - A new pipeline is formed on the inner surface of the existing pipe. - Improved chemical resistance and abrasion resistance due to the formation of a rigid PVC pipeline. - Enhanced load capacity, seismic resistance, and flow capacity as a composite pipe integrated with the existing pipe. *For more details, please download the PDF or feel free to contact us.*

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IPH method

Achieving the longevity of concrete structures! Methods for preventing re-deterioration.

The "IPH method" replaces the air present inside the concrete and the injected resin, allowing the resin to diffuse radially from the inside of the drilled holes, thereby filling even the finest cracks at the ends. This method not only enhances the adhesion strength between rebar and concrete but also provides a high anti-corrosion effect, leading to improved durability. It has received technical evaluation from the Japan Society of Civil Engineers. Additionally, structures constructed using this method can extend the intervals between subsequent repairs. Since the deteriorated areas are repaired and injected without being chiseled away, the amount of demolition waste is reduced, resulting in cost savings. 【Features】 ■ High-density filling ■ Rebar anti-corrosion and neutralization suppression ■ Strength recovery and durability enhancement ■ Improved cost-effectiveness and environmental measures *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Advance Soft Ground Improvement Conical Mat Method

This is a construction method that smoothly distributes the imposed load and exhibits reinforcement of bearing capacity and suppression of differential settlement effects.

This product consists of a large number of conical concrete blocks (3.8 kg each) arranged and bonded to a special fiber sheet. Due to its large size (10 m² per sheet), it offers excellent workability, reduces construction time, and enhances labor-saving effects. NETIS registration number: HR-110013-VR

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rental lawn

Very popular for photography and events! Beautiful grass rental setup for both indoor and outdoor use.

"Rental Grass" allows for the rental and installation of rolled natural grass anywhere throughout the year. You can enjoy beautiful greenery from the day it is installed, and it is ready for immediate use, making it ideal for short-term use such as filming and events. It can be cut to fit your space and can be installed and removed in a short time. There are few seams, resulting in a naturally beautiful finish. 【Features】 ■ Real natural grass ■ Immediate use available ■ Quick installation and removal ■ Few seams, natural appearance *For more details, please refer to the PDF document or feel free to contact us.

  • Rental/lease
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Urethane bearing roller

The outer diameter is polished! It is used in many applications such as financial terminals, ticket vending machines, transportation machinery, and medical devices.

We would like to introduce our "Urethane Bearing Roller." This product features urethane directly bonded to bearings and one-way clutches, manufactured in a way that does not affect the bearings. The outer diameter is finished with polishing. Generally, it is used in various applications such as financial terminals, ticket vending machines, transport machinery, medical devices, food machinery, packaging machinery, and health equipment. There are no standard dimensional restrictions for the bearings used. 【Features】 ■ Urethane directly bonded to bearings and one-way clutches ■ Manufactured in a way that does not affect the bearings ■ Outer diameter finished with polishing ■ No standard dimensional restrictions for the bearings used *For more details, please refer to the PDF document or feel free to contact us.

  • 2022-02-21_10h24_19.png
  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping regeneration method "In-Pipe Phoenix"

Seven construction methods tailored to the purpose! Pipe installation that regenerates old, corroded pipes in a short period.

Japan Engineering's "In Pipe Phoenix" is a method that creates new pipes inside existing piping, allowing for the reuse of the piping. Compared to replacement construction, it is characterized by less noise and dust, and it can be performed even when pipes are embedded in walls. It can regenerate pipes with holes, and the drainage restriction is generally just one day, resulting in a short construction period, making it an environmentally friendly method for residents. 【Features】 ■ New pipes are created inside existing pipes, revitalizing the piping ■ Construction is possible even when pipes are embedded in walls ■ Epoxy resin and PVC shape memory resin are used according to application ■ Less noise and dust, with a short construction period ■ Warranty ranges from 10 years *For more details, please refer to the catalog or feel free to contact us.

  • Piping Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "Anshin Block Seismic Wall Method"

By using an adhesive method for the fixing plate and high-flow mortar, noise and vibration are significantly reduced.

The "Anshin Block Seismic Wall Method" is a seismic reinforcement method that uses RM units to construct additional seismic walls. Construction can be carried out while the building is in use. By using RM units, it allows for shorter construction periods, space savings, and resource savings (no formwork required) compared to RC seismic walls. It can accommodate a wide range of seismic reinforcement projects, including schools, hospitals, office buildings, and commercial facilities. 【Features】 ■ Reduction of noise and vibration ■ Space-saving ■ Shortened construction period ■ CO2 reduction *For more details, please refer to the PDF materials or feel free to contact us.

  • Anti-vibration, earthquake-proof, vibration-isolating devices
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tunnel auxiliary construction method "AGF-S / AGF-P method"

Injection of urethane-based and cement-based materials is possible! It enables a reduction in cycle time, improved cost-effectiveness, and enhanced workability.

We would like to introduce our tunnel support method, 'AGF-S / AGF-P Method'. The "AGF-S Method" allows for the cutting and removal during excavation by providing slit processing at the end pipe of the AGF steel pipe, while the "AGF-P Method" uses a special PVC pipe at the end pipe of the AGF steel pipe. Since it can be poured from the standard cross-section, it offers a reduction in cycle time, improved cost-effectiveness, and enhanced workability compared to widening methods. 【Features】 ■ Can be constructed without widening (no need for pre-widening of the tunnel excavation cross-section) ■ Cutting and removal can be easily done every 1 meter of excavation ■ Construction is possible with hydraulic excavators for tunnels ■ Injection of urethane-based and cement-based materials is possible *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FK Mesh Panel Method for Reinforced Concrete Pavement Construction

Labor-saving and improved workability! The "FK Mesh Panel" leads to shortened construction periods.

The "FK Mesh Panel Method" is a groundbreaking technique for shortening the construction process of rebar placement in continuous reinforced concrete pavement using diagonal rebar mesh. There is no need to tie individual rebar pieces, allowing for placement even without rebar workers. The amount of rebar that can be installed per person increases by 2 to 7 times, leading to labor savings. This method is particularly effective in situations where there are restrictions on the rebar placement process due to bad weather or site conditions. 【Features】 ■ By using spiral spacers, there is no need to install continuous spacers before placement. ■ The product length ranges from 5m to 10m, allowing for delivery to the site using standard large vehicles. ■ Construction speed improves by 2 to 7 times, enabling a reduction in construction time. ■ Total cost savings can be achieved through shortened construction periods. ■ Automatic production in a factory with dedicated equipment ensures stable quality of rebar pitch and other specifications. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Snake duct construction method

Improved work efficiency! Contributes to the reduction of energy consumption and CO2 emissions associated with transportation.

We would like to introduce our "Snake Duct Method." The Snake Duct refers to a general term for "prefabricated flexible ducts" that have undergone special branching and diameter processing on Fujilex (Super Fujilex). It is suitable for duct systems with many branching points. Additionally, the reduction in connection points decreases air leaks, resolving the complexity of conventional methods and improving workability. 【Features】 ■ Cost Reduction: Compressed packaging (volume ratio of 1/3 or less) ■ Shortened Construction Period: Reduced connection points, lightweight and flexibility ■ Environmentally Friendly: No insulation work required *For more details, please refer to the PDF document or feel free to contact us.

  • Ventilation and Exhaust

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Corner steel pipe column on-site no-welding joint method 'Column Coupler'

No on-site welding required and no discrepancies! A joint method that improves work efficiency and enables shortening of construction time.

The "Column Coupler" is a joint method that eliminates the need for on-site welding work. It improves the efficiency of the framing work and allows for a reduction in construction time. There are no discrepancies, and there is no variation in quality or precision due to the skill of the welding contractor. Additionally, it eliminates the need for erection pieces, enabling labor-saving in both factory processing and on-site work. 【Features】 ■ No on-site welding required, allowing column joint work to be completed in a short time ■ Produces columns without discrepancies ■ No installation welding or cutting work for erection pieces *For more details, please refer to the PDF document or feel free to contact us.

  • Pipe Fittings
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exposed-type elastic fixed column base method "Free Base Method"

A method of exposed elastic fixed column bases that generally offers ease of conventional specifications and design, as well as peace of mind during construction.

The "Free Base Construction Method" is an exposed elastic fixed column base method that ensures structural safety of the column base specifications based on SASST technology evaluation. By developing, producing, and constructing the important column bases that are directly linked to the safety of buildings to high quality standards, we embody people's peace of mind. Additionally, while offering many options that enable suitable load capacity selection, we also consider the convenience for users by reducing the workload of the selection process. 【Features】 ■ Column base specifications suitable for medium and small-scale projects ■ Labor-saving of repetitive review work through program integration ■ Compact foundation column type achieved by adopting "bolt anchorage length of 15d" ■ Assurance of construction quality and design quality by designated contractors *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Information] Exposed Type Elastic Fixed Column Base Method "Free Base Method"

Bringing 'ease' and 'safety' to conventional construction methods! Introducing the Free Base Method.

This document introduces the exposed-type elastic fixed base construction method, "Free Base Method." It includes an overview of the method, such as similarities and differences with general construction methods, applicable buildings, features, and design flows based on different calculation routes. [Contents] ■ Overview ■ Features / Mechanism for design labor-saving ■ Response to "Confirmation of prevention of foundation concrete destruction, etc." ■ Supplementary materials *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration