We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 483 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. 双和化学産業株式会社 Hyogo//others
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  4. 4 アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡 Kanagawa//others
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  3. Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部
  4. 4 FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition 双和化学産業株式会社
  5. 5 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト

Construction method Product List

481~510 item / All 1406 items

Displayed results

FRP lining waterproofing method 【Aquarium facilities】

It prevents the deterioration of concrete and protects the rebar due to its waterproof and salt-resistant properties!

Concrete structures in fisheries and aquarium facilities are eroded by seawater and saltwater, leading to deterioration and aging, particularly resulting in explosive phenomena due to rust and corrosion of rebar caused by salt. The "Airtight FD Method" prevents concrete deterioration and protects rebar through waterproofing and salt resistance. In fisheries and aquarium facilities, we propose measures to prevent aging and extend lifespan, which can reduce lifecycle costs, based on the required functionalities and performance, as well as over 20 years of durability track record. 【Features】 - Safe materials that do not affect water quality - Prevents external water quality contamination - Good curing properties with no concerns about poor curing - Finished in colors considerate of biological growth - Maintains color and performance over a long period *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method [water channels and water resource facilities]

A material with high strength in a thin film! It can suppress the reduction of flow accumulation and ensure flow rate and flow velocity.

Concrete structures of agricultural water management facilities are deteriorating and aging due to erosion and neutralization phenomena caused by water and flowing water. The "Airtight ND Method" uses a high-strength thin film material that can suppress the reduction of flow accumulation and ensure flow rate and velocity. In agricultural water management facilities, we propose measures to prevent aging and extend lifespan, which can reduce lifecycle costs, based on the required functions and performance as well as over 20 years of durability track record. 【Features】 ■ Safe material that does not affect water quality ■ Prevents external water quality contamination ■ Good hardening properties, allowing construction even in low winter temperatures without concerns about poor hardening ■ High strength with excellent impact resistance and abrasion durability ■ Can be finished in a variety of colors to match the landscape *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining waterproofing method [Snow prevention facility]

It is difficult for ice and snow to adhere, making it easy for snow to flow away! Due to its high waterproof and corrosion-resistant properties, it prevents the deterioration and aging of facilities.

Concrete structures of snow mitigation facilities are deteriorating and aging due to phenomena such as carbonation, freeze-thaw damage, and salt damage caused by the use of de-icing agents. The "Airtight SD Method" prevents the deterioration and aging of facilities due to its high waterproofing and corrosion resistance, and its low roughness coefficient makes it difficult for ice and snow to adhere, allowing for easier snow runoff. In snow mitigation facilities, we propose long-term durability measures that can reduce lifecycle costs through functions and performance that meet required specifications, backed by a long track record of durability. 【Features】 ■ Excellent salt resistance against de-icing agents ■ Maintains performance even in low-temperature environments ■ Surface that is difficult for ice and snow to adhere to ■ Low roughness coefficient ensures flow rate and velocity ■ Slip-resistant finish to prevent slipping and falling *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Coating floor method

Withstand harsh usage conditions such as "food factories," "pharmaceutical factories," "warehouses," and "kitchens"!

The deterioration of floor surfaces within facilities not only worsens workability but also becomes an ideal breeding ground for mold and bacteria, posing significant hygiene issues. As a result, there are many cases where this is pointed out by regulatory bodies such as health departments. Our construction method strongly supports hygiene measures within facilities by maintaining a safe and clean environment and enhancing the durability of buildings. 【Our Special Construction Method】 The most suitable flooring material for sites with strict usage and construction conditions, such as food manufacturing facilities. This method compensates for the shortcomings of "water-based rigid urethane resin." *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ministry of Land, Infrastructure, Transport and Tourism NETIS registered product: Wire method for fall and drop prevention *Patent obtained

A reliable construction method registered with Netis. With one-touch operation, it offers up to 10 times the workability of conventional methods. No cutting or clip/rivet work is required. *Beware of similar products.

Lockable Plus: A reliable construction method registered with NETIS. Highly regarded mainly in construction and at train stations. Installation is completed with a simple one-touch operation by just threading the wire through the hanger, without the need for special tools. Equipped with a safety lock for emergencies. It is an effective solution against vibrations and falls of equipment. In an era of labor shortages, this construction method allows for accurate installation easily, regardless of age, gender, or nationality. Equipped with a safety lock for emergencies. ■ Quick installation - No troublesome bolts or screws for locking required ■ Easy to apply tension, with the ability to readjust tension ■ Considering safety and security, it can be used for high loads, providing overwhelming workability to support "labor-saving and efficiency." "Ministry of Land, Infrastructure, Transport and Tourism NETIS Registration Number: KK-200052-A" "Patent: Patent No. 5964223" * Economic efficiency "Improvement (49.42%)": Labor costs are reduced due to improved workability, and material costs are further reduced due to a decrease in the number of products used. * Process "Shortening (91%)": Due to improved workability <NETIS details: https://protect-eu.mimecast.com/s/baqQCl5yOS2l6L0HGgdZ4?domain=netis.mlit.go.jp> *For more details, please contact us.

  • Other safety and hygiene products
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Carbon Real Look Method

This is an introduction to the real look method of applying genuine carbon, not a fake like transfer sheets!

This is an introduction to the "Carbon Real Look Method." For vehicles that have aftermarket parts available, those options are generally less labor-intensive and contribute to weight reduction. However, for vehicles that do not have such parts or when you want to carbonize other parts, please consider this method. It is also effective if you want to maintain the original strength. Since we apply real carbon instead of fake materials like transfer sheets, it is recommended for those who prefer authenticity. 【Features】 ■ When you want to carbonize vehicles that do not have parts or other components ■ Effective if you want to maintain the original strength ■ Recommended for those who prefer authenticity, as we apply real carbon *For more details, please refer to the PDF document or feel free to contact us.

  • Coating Agent
  • paint
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ultra-fast curing/strengthening polyurea resin spray coating method

Impact-resistant, waterproof, chemical-resistant, and long-lasting! The highest class of polyurea coating material that can be applied regardless of material or location.

At Armor Linings, we perform a polyurea resin coating method that can be applied regardless of material or location. By spraying with a thickness of approximately 2 to 10 mm, it adheres to various materials such as concrete, metal, wood, steel plates, and plastic resins, allowing for a wide range of construction applications. Please feel free to contact us if you have any requests. - Ultra-fast curing - Tough physical properties - Solvent-free and catalyst-free 【Features of the Method】 ■ The mixing of Component A and Component B is controlled by a computer via a reactor, ensuring quality. ■ Being solvent-free, there is no volatilization, making it safe to work in enclosed spaces (no VOC). ■ Curing is stable even in cold and low-temperature environments. ■ It cures immediately after spraying, allowing for foot traffic within 5 minutes. ■ The coating layer forms a seamless, integrated membrane. *For more details, please download the PDF or contact us.

  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SC pile stud method

Design and construction that maximizes the performance of piles is possible! Reduces the excavation volume of the pile hollow section by 78-95%.

The "SC Pile Stud Method" involves welding deformed steel bars to the head of precast concrete piles, connecting the precast concrete piles to the foundation slab. The selection of precast concrete piles is based on soil conditions, site conditions, and structural conditions, and is applicable to all three types: PHC piles, PRC piles, and SC piles. Additionally, it is suitable for low-rise buildings. 【Features】 ■ Design and construction that maximizes pile performance ■ Shortened pile head treatment process ■ Cost reduction ■ Quality assurance ■ Reliable stress transfer *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor renovation method "SS-5 Hour Method"

A groundbreaking kitchen floor renovation system that does not require a business shutdown.

The "SS-5 Hour Construction Method" is a revolutionary technique that allows for kitchen floor renovations without interrupting business operations. By using a special substrate treatment material, it is possible to carry out construction immediately on floors that are dirty with oil or wet surfaces. After the construction is completed, there is almost no odor, and it excels in chemical resistance and abrasion resistance, allowing for the realization of a safe and clean floor in about 5 hours, from the end of business on the same day to the preparation time the next morning. 【Features】 ■ Completed in 5 hours, allowing immediate use of the floor ■ Applicable to oily and wet surfaces ■ Slip-resistant processing is possible ■ Excellent chemical resistance, antibacterial properties, and abrasion resistance ■ Has 3 to 4 times the physical strength of concrete floors, among other benefits *For more details, please download the PDF or feel free to contact us.

  • Company:KBM
  • Price:Other
  • Other quality control and hygiene measures
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Pipe Pile Top Plate Joint Method "ECS-TP Method"

Just bolt the foundation and pillars together! A simple and cost-effective foundation system.

The "ECS-TP method" is a steel pipe pile top plate joint construction method that is simple and very easy to implement, making it suitable for challenging sites. By re-evaluating the conventional foundation construction process itself, we have successfully shortened the construction period significantly while satisfying the structural criteria considered in the design standards, achieving both cost reduction and performance maintenance simultaneously. It has been adopted in pioneering projects that are typically considered difficult, such as "building a compost shed on a slope" and "adding a new roof from the outside of a station building." 【Features】 ■ Zero leftover soil and industrial waste ■ Fewer construction days ■ Usable in narrow spaces ■ Low vibration and low noise, minimizing environmental impact ■ Fewer vehicles required due to less material to be transported *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Formwork inner surface reinforcement method

Reduction of rust suppression, surface preparation, and repair work! On-site formwork storage will become easier.

The "Formwork Inner Surface Reinforcement Method" is a technique that involves applying a special coating to the inner surface of the formwork to suppress rust during the construction period, thereby reducing the need for grinding and repair work. This method enables long-term corrosion protection and suppresses rust on the inner surface of the formwork in coastal areas with high airborne salt, during typhoons, and in the rainy season. It also makes it easier to store formwork on-site during interruptions in the construction schedule (such as Golden Week, Obon, New Year, rainy season, and typhoons). 【In such cases】 - Suppresses rust on the inner surface of the formwork in coastal areas with high airborne salt, during typhoons, and in the rainy season. - By suppressing rust that occurs during the construction period, it reduces the labor involved in repair transfers to products and cleaning of the formwork. - Allows for the production of aesthetically pleasing blocks. *For more details, please refer to the PDF document or feel free to contact us.

  • Calibration and repair
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained

This is a columnar improvement project of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!

The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials. Using a uniquely developed mixing device, it efficiently mixes and stirs the solidifying materials with the soil, creating stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Review Certification (Building Technology)  BCJ-Review Certification-219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter using a base machine of 0.7 m³ class without the need for a three-point pile driver. It can accommodate various soil types, including clay, sandy soil, and loam, allowing for flexible responses to various road and surrounding conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by taking depth mold samples. There is no need to collect boring cores, which reduces construction time and costs. *Documents can be downloaded from the related links.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

Here is an introduction to a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we executed the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly began the work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size

Introduction to the case of underground obstacle removal conducted on April 1, 2022!

On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools according to the situation and carries out the construction. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related link or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] New Warehouse Construction T-Column Method

Carefully planned and constructed to match the building! Introducing examples from the site of a new warehouse construction project.

We would like to introduce a case study of ground improvement work carried out by our company. At the site of a new warehouse construction in Chigasaki City, Kanagawa Prefecture, we implemented our original deep mixing method and T-column method. The improvement diameters varied widely, with the largest being Φ1400mm and the smallest Φ800mm, totaling five different sizes. We planned and executed the work meticulously to match the building's requirements. 【Case Overview】 ■Project Name: New Warehouse Construction T-Column Method ■Construction Date: September 30, 2019 ■Location: Chigasaki City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of pile diameters, with a small diameter of Φ800mm and a large diameter of Φ1300mm. *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration