We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 42 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  3. スワロー工業 Niigata//Building materials, supplies and fixtures
  4. 4 コスモシステム Tokyo//Industrial Machinery
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Sep 17, 2025~Oct 14, 2025
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  3. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  4. 4 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部
  5. 5 Airbag-type water stop method ABS method クロダイトグループ

Construction method Product List

241~255 item / All 1386 items

Displayed results

[Document] Column Coupler Method Construction Guidelines (for Hot-Dip Galvanized Treatment)

Column coupler method factory welding edition (for hot-dip galvanized treatment)! Features and assembly, etc. are included.

This document is the construction manual for the field no-welding joint method "Column Coupler" (Factory Welding Edition - for Hot-Dip Galvanizing Treatment). The "Column Coupler" is a joint method that eliminates the need for field welding work. It improves the efficiency of construction work and shortens the construction period. The Factory Welding Edition (for Hot-Dip Galvanizing Treatment) includes the features of the "Column Coupler," as well as details on factory welding and the galvanizing process. [Contents] ■ Introduction (Features of the Column Coupler) ■ Factory Welding and Galvanizing Process ■ Preparation ■ Shaft Fabrication ■ Middle Plate Installation ■ Assembly *For more details, please refer to the PDF document or feel free to contact us.

  • Pipe Fittings
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

KC-G method (formwork type color grip method)

Construction can be completed in a short time, allowing for early opening! It creates a comfortable space on the sidewalk.

The "KC-G Method" is a technique that uses molds with tile-like and patterned designs to apply resin to asphalt and concrete pavements, and by scattering aggregates, it creates a comfortable urban space. The standard color tone of light gray has a temperature reduction effect on the pavement, contributing to the mitigation of the heat island phenomenon. It excels in weather resistance, abrasion resistance, and slip resistance, and also reinforces the pavement surface, leading to improved durability of the pavement. 【Features】 ■ Enhanced safety ■ Suitable for barrier-free design ■ Mitigation of the heat island phenomenon ■ Quick installation and early opening ■ Improved durability of the pavement *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Urethane rubber-based coating waterproofing method "Aqua Coat"

Establishing a strong and durable waterproof layer with high-quality materials and precise construction.

Aqua Coat 2000 is a construction waterproofing material that conforms to JIS A 6021, which is a polyurethane rubber-based waterproofing material with high elongation. Aqua Coat not only meets the basic physical properties required for waterproofing materials, such as crack resistance and weather resistance, but also ideally establishes various application methods tailored to the intended use, application location, and substrate conditions, responding to all demands related to "building waterproofing." For more details, please download the catalog.

  • Other consumables
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Suitable for embossed back rolls: 'IT68S-Smooth'

Introducing products suitable for embossed back rolls! We design and propose various formulations.

Are you looking for "Embossed Back Roll"? The "Embossed Back Roll" uses silicone rubber, which excels in release properties and heat resistance, to improve film tracking and winding issues that occur during the embossing process. Therefore, the suitable product is 'IT68S-Smooth'. This product is a roll lined with silicone rubber, and it is possible to adjust the formulation and rubber hardness according to the intended use. 【Features of IT68S-Smooth】 ■ Excellent release properties and heat resistance ■ Seamless processing ■ No processing marks such as seams that occur during general rubber molding due to a unique processing method ■ Can be bonded with metals (existing cores, etc.) and general synthetic rubbers (EPT, NBR) ■ Re-coating of only the surface layer is possible during rewinding ■ Formulation design tailored to the intended use is possible *For more details, please refer to the PDF document or feel free to contact us.

  • Rubber

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD method (induced horizontal drilling method) TerraJet method - compatible with overhead wire elimination

Piping and wiring burial system (non-excavation method, thrust method)! Attention on "de-energized poles"! "Challenging the creation of lifelines that run through the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and drainage, electricity, gas, and communication has become increasingly important. The HDD method (Horizontal Directional Drilling) / TerraJet is a construction method that buries pipes and cables through non-excavation (non-excavation method and thrust method), reducing traffic disruption and excavation waste issues. It allows for clean and highly safe construction by detecting the construction position from the surface while advancing. In recent years, disasters have become more severe, and from the perspective of improving disaster prevention, the undergrounding of utility poles is being promoted. The HDD method (Horizontal Directional Drilling) / TerraJet is gaining attention as a method for burying power lines and communication lines underground. In Europe and the United States, it is commonly referred to as NO-DIG, Trenchless, HDD (Horizontal Directional Drilling), no-dig, trenchless, and horizontal directional drilling. 【Features】 - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

HDD method (induction horizontal drilling) is ideal for short-distance construction!

Piping and wiring burial system (non-excavation and thrust method)! Numerous achievements! "Narrow spaces" "Short distances"! "Challenging the creation of lifelines that traverse the Earth and underground."

With the acceleration and advancement of urban functions, the development of various lifelines such as water supply and drainage, electricity, gas, and communication has become increasingly important. The HDD method (Horizontal Directional Drilling) / Mini-Jet is a construction method for burying pipes and cables using non-excavation techniques, which reduces traffic disruption and soil disposal issues. It allows for clean and safe construction by detecting the construction position from above ground while advancing. In recent years, labor shortages and rising maintenance costs have become social issues, leading to increased attention on the HDD method (Horizontal Directional Drilling) / Mini-Jet as a technique for burying water supply and drainage pipes, gas pipes, and electric cables underground, from the perspective of shortening construction periods and reducing total costs. The HDD method (Horizontal Directional Drilling) / Mini-Jet is ideal for installation in "narrow spaces" and "short distances" due to its compact size! 【Features】 - Suitable for narrow spaces - Suitable for short-distance installation - Flexibility and adaptability - Shortened construction period - Economically low cost - Harmony with the natural environment - Safety For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Corrosion protection coating method for wastewater treatment facilities: Paratex EP-GS/GSX method

Paratex anti-corrosion method that protects life and nature by creating a healthy water environment.

The corrosion protection coating method for wastewater treatment facilities, Paratex EP-GS/GSX method, is a non-crosslinked epoxy corrosion protection method that responds to all corrosive environments. It offers excellent durability, ensuring safe construction and long-term performance. 【Features】 ○ Adhesion stability ○ Durability ○ Workability ○ Safety For more details, please contact us or download the catalog.

  • paint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Salt damage countermeasure method using salt-absorbing agents: "SSI Method"

[Confident in our prices] Fundamental measures against concrete salt damage! Reducing salt content around rebar and its surroundings to long-term inhibit rebar corrosion.

The "SSI Method" is a salt damage prevention technique developed jointly by the Railway Technical Research Institute and the former Japan Highway Public Corporation Testing Research Institute. By utilizing a "salt-adsorbing agent" that directly acts on the salt content in concrete, it fundamentally and long-term suppresses salt damage. It is composed of polymer cement-based materials that are of the same quality as the structure, making it effective as a countermeasure against macrocell corrosion after partial cross-section repair, and it achieves high durability. 【Features】 ■ Adsorbs salt present in the residual rust layer on the surface of rebar ■ Reduces salt content in the concrete structure surrounding the rebar surface ■ Composed of polymer cement-based materials of the same quality as the structure ■ Effective as a countermeasure against macrocell corrosion after partial cross-section repair ■ Achieves high durability

  • Company:FCR
  • Price:Other
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

What is the salt damage prevention method for structures called 'SSI Method'?

We are confident in our pricing. Introducing the fundamental salt damage countermeasure for concrete structures, the 'SSI Method'.

The SSI method is a salt damage prevention technique developed jointly by the Railway Technical Research Institute (a public foundation) and the former Japan Highway Public Corporation's testing research institute. By utilizing a "salt-adsorbing agent" that directly acts on the salt content in concrete, it fundamentally and long-term prevents salt damage with features that cannot be achieved by other rust prevention methods. <Three Major Features of the SSI Method> 1. It is impossible to completely remove rust from rebar through scraping. The method adsorbs the salt present in the residual rust layer on the surface of the rebar, thereby suppressing the progression of rust. 2. The rust prevention agent containing the salt-adsorbing agent reduces the salt content in the rebar surface and the surrounding concrete structure, improving the quality of the concrete. 3. The "SSI method" is composed of polymer-cement-based materials that are of the same quality as the concrete structure, achieving high durability performance through material selection that considers the specific location and environment.

  • Company:FCR
  • Price:Other
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Mechanical crack repair, iron crack repair, mechanical repair method, MS method.

Non-heat metal crack repair! No thermal distortion occurs at all. Metal casting crack repair!

The "MS Method (Mechanical Stitch)" is a groundbreaking repair technique (Mechanical Stitching Method) that addresses metal cracks using mechanical methods. Since it does not apply any heat, there is no "thermal distortion." It prevents residual stress from occurring in other areas and also prevents secondary damage such as new cracks. Metal cracks are one of the concerns in equipment maintenance operations. In general welding repair methods, the base material around the crack changes due to heat, leading to residual stress and distortion, which always carries the risk of "crack recurrence" and "secondary damage." 【Features of the MS Method】 ■ No hardening or residual stress from heat ■ Elimination of secondary damage ■ Maintenance of stable quality → Integrated system repairs using jigs and other tools → Accumulation of know-how, experience, and track record ■ Completion of construction in a short period → Does not significantly reduce the operational rate of equipment ■ Advantages in safety and environmental aspects → Since no fire is used, there is no impact on the operational rate of other equipment or the environment For more details, please contact us.

  • bolt

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Roof and wall covering method "Seamless Method"

It adheres tightly when sprayed, making it lightweight and durable! For roof and wall leaks, asbestos, and safety measures!

The "Seamless Construction Method" is a revolutionary covering technique that revitalizes roofs and walls. By applying a precise substrate treatment and spraying 100% pure polyurethane that has high strength and ultra-fast curing properties, it adheres to the substrate and forms a waterproof coating without seams. It maintains excellent elongation performance and strength that adequately follows cracks. This method is robust, resistant to breaking, and difficult to peel off. Additionally, it prevents not only leaks but also repairs deteriorated roofs, and prevents damage, falling of aging slate, and asbestos dispersion. 【Features】 ■ Seamless coating with adhesive type ■ Leak prevention, deterioration repair, and roof material reinforcement ■ Consistent responsibility construction system from substrate treatment to finishing ■ Measures against roof and wall collapse and soundproofing of rain noise ■ A construction method that is gentle on buildings and ensures safety and peace of mind *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

20 years of proven results since its release! Solve leaks with 'Atreune Water-Based Waterproofing Material'.

The waterproofing of the roof and balcony can be completed in 1 to 2 days! Easy application with a roller on a wide range of substrates.

The "Atreinu Water-Based Waterproofing Material" can be applied from balconies and terraces to rooftops and flat roofs, and it is a water-based single-component waterproofing material that protects buildings from leaks and deterioration. 【Features】 ■ Excellent Workability Being a single-component water-based type, it can be easily applied with a roller, making what is often considered a difficult waterproofing job simple. Additionally, thanks to a special acrylic resin with excellent drying properties, it can be completed in 1 to 2 days. ■ Compatible with Various Substrates It can be applied not only to widely used concrete and mortar on rooftops and balconies but also to various waterproof substrates (asphalt waterproofing, synthetic rubber sheets, PVC sheets, existing urethane coatings, FRP waterproofing). ■ Safe & Low Odor It does not contain harmful TDI or MOCA found in urethane waterproofing materials, and it complies with specific regulations, ensuring safety for workers. Furthermore, it is free from toluene and xylene, with a formaldehyde emission rating of F☆☆☆☆. Its low odor allows for application without concern for neighbors. ■ Excellent Life Cycle Cost Due to its excellent weather resistance, there is no need for regular repainting even if the topcoat deteriorates. *For more details, please refer to the PDF materials or feel free to contact us.

  • paint
  • Other consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Removal of waterproofing from Maruhou non-destructive bridge deck using the shave polish method.

Patent obtained! A revolutionary construction method that allows for immediate transition to waterproofing work and other construction processes.

The "Shave Polish Method" is a patented construction technique that removes only the waterproof layer applied to bridge decks using a riding-type stripping machine and a planetary rotating polishing machine equipped with special blades and diamonds. The main feature is that the removal of the waterproof layer can be completed in a non-destructive manner without cutting or damaging the concrete deck, using a dry construction method. 【Features】 - The waterproof layer can be removed non-destructively from bridge decks, such as those on highways, without using cutting machines. - It does not damage the concrete deck (concrete polishing precision within 1mm). - It can remove various waterproof materials used for deck waterproofing. - Work is conducted while collecting dust, thus minimizing dust dispersion. - No water is used, allowing for immediate transition to the next process after construction. *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Clean SG Method

We offer solutions for partial construction and small-scale projects! Introducing construction methods that minimize dust dispersion.

The "Water Clean SG Method" uses a wet vacuum grinder to remove asbestos-containing finishing materials and inorganic substrate leveling materials. By continuously dripping water while powerfully suctioning, it allows for construction that minimizes dust dispersion, making it possible to work on edges, cracks, narrow areas, and partial applications. As a primary method, it is used as a supplementary technique to the Water Clean Method, but it also accommodates partial work on cracked areas during renovation and small-scale projects. 【Features】 ■ Capable of removing asbestos-containing finishing materials and inorganic substrate leveling materials ■ Minimizes dust dispersion during construction by continuously dripping water and suctioning ■ Allows for work on edges, cracks, narrow areas, and partial applications ■ Accommodates partial work on cracked areas during renovation and small-scale projects *For more details, please refer to the related link page or feel free to contact us.

  • Other contract services
  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Parking lot waterproofing removal work - Terminator removal method

Removal of various types of flooring in a short period! Our company has five Terminator machines.

The "Terminator Removal Method" uses a riding-type removal machine to remove various types of flooring materials, such as hard polyurethane and FRP, which are typically difficult to remove, from surfaces like parking lot floors. The work is performed while riding on the machine, which reduces noise and vibration. It allows for the removal of flooring materials at an overwhelming speed. 【Removal with the Terminator Machine for Parking Lot Renovation】 - In parking lot renovation work, it is essential to remove the existing waterproofing. - The existing waterproof layer in parking lots often has issues with water intrusion or poor adhesion to the structure. - To ensure proper construction, the waterproof layer must be removed. - It is necessary to expose the sound structure using grinding machines and shot blasting machines. *For more details, please refer to the related link page or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration