We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 475 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

  1. 緑化計画研究所 Kanagawa//retail
  2. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  3. 双和化学産業株式会社 Hyogo//others
  4. 4 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 29, 2026~Aug 25, 2026
This ranking is based on the number of page views on our site.

  1. Rooftop greening system - rooftop greening without the need for irrigation - evergreen Kiri grass bag method. 緑化計画研究所
  2. Rooftop greening, folded plate roof greening, wall greening, easy greening, evergreen Kiri grass bag method. 緑化計画研究所
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  5. 5 Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部

Construction method Product List

511~540 item / All 1398 items

Displayed results

Formwork inner surface reinforcement method

Reduction of rust suppression, surface preparation, and repair work! On-site formwork storage will become easier.

The "Formwork Inner Surface Reinforcement Method" is a technique that involves applying a special coating to the inner surface of the formwork to suppress rust during the construction period, thereby reducing the need for grinding and repair work. This method enables long-term corrosion protection and suppresses rust on the inner surface of the formwork in coastal areas with high airborne salt, during typhoons, and in the rainy season. It also makes it easier to store formwork on-site during interruptions in the construction schedule (such as Golden Week, Obon, New Year, rainy season, and typhoons). 【In such cases】 - Suppresses rust on the inner surface of the formwork in coastal areas with high airborne salt, during typhoons, and in the rainy season. - By suppressing rust that occurs during the construction period, it reduces the labor involved in repair transfers to products and cleaning of the formwork. - Allows for the production of aesthetically pleasing blocks. *For more details, please refer to the PDF document or feel free to contact us.

  • Calibration and repair
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement work ☆ Deep mixing method 'T-column method' * Certification obtained

This is a columnar improvement project of deep mixing treatment made possible by a self-developed stirring device (patent obtained) that enables high quality, low cost, and flexible responsiveness!

The T-column method is a construction technique that involves excavating the ground while injecting cement-based solidifying materials. Using a uniquely developed mixing device, it efficiently mixes and stirs the solidifying materials with the soil, creating stable, high-quality columns (columnar improved bodies). ■ Japan Building Center Foundation Construction Technology Review Certification (Building Technology)  BCJ-Review Certification-219 ■ NETIS Number KT-150083-A <Features> - Maximum column diameter of 1.60 m and maximum depth of 16 m. It is possible to construct up to the maximum column diameter using a base machine of 0.7 m³ class without the need for a three-point pile driver. It can accommodate various soil types, including clay, sandy soil, and loam, allowing for flexible responses to various road and surrounding conditions. - By using a fully automated plant, the slurry production process can be managed, ensuring stable quality. - In the case of small-scale buildings, a mold core can be created by taking depth mold samples. There is no need to collect boring cores, which reduces construction time and costs. *Documents can be downloaded from the related links.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi-Drill Method (Equivalent to BG Method)

We will perform cutting, removal, and backfilling suitable for the site! A case of removing PHC piles that could not be completely taken out.

Here is an introduction to a case study of underground obstacle removal conducted by our company. In Yokosuka City, Kanagawa Prefecture, we executed the work using the multi-drilling method (equivalent to BG method). We removed PHC piles that could not be extracted using the pull-out method. Upon receiving notice that extraction was impossible, we promptly began the work and successfully completed the project. 【Case Overview】 ■ Project Name: Multi-Drilling Method (Equivalent to BG Method) ■ Construction Date: May 12, 2022 ■ Location: Yokosuka City, Kanagawa Prefecture ■ Details: φ1000 GL-25m *For more details, please download the PDF from the related link or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Multi Drill SR-45 (Equivalent to BG) Low Headroom Size

Introduction to the case of underground obstacle removal conducted on April 1, 2022!

On our company website, we introduce numerous case studies of underground obstacle removal. On this page, we present the sizes for low-headroom construction using the multi-drill method (equivalent to BG method) in drawings. Our company selects tools according to the situation and carries out the construction. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-drill method (equivalent to BG method) ■ All-casing method (equivalent to BG method) *For more details, please download the PDF from the related link or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (7)

Introducing actual underground obstacles! We select tools according to the situation and carry out the construction.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 7 of our series on removed underground obstacles. For more details, please refer to the related links. We have included images of actual underground obstacles, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] New Warehouse Construction T-Column Method

Carefully planned and constructed to match the building! Introducing examples from the site of a new warehouse construction project.

We would like to introduce a case study of ground improvement work carried out by our company. At the site of a new warehouse construction in Chigasaki City, Kanagawa Prefecture, we implemented our original deep mixing method and T-column method. The improvement diameters varied widely, with the largest being Φ1400mm and the smallest Φ800mm, totaling five different sizes. We planned and executed the work meticulously to match the building's requirements. 【Case Overview】 ■Project Name: New Warehouse Construction T-Column Method ■Construction Date: September 30, 2019 ■Location: Chigasaki City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City T-Column Method (Deep Mixing Method)

Introducing a case where the T-column method (deep mixing treatment method) was implemented using construction machine S-15!

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, Kanagawa Prefecture, we implemented our original T-column method (deep mixing method) using construction machine S-15. A total of 176 locations were completed successfully. 【Case Overview】 ■ Project Name: Sagamihara City T-column Method (Deep Mixing Method) ■ Construction Date: October 5, 2021 ■ Location: Midori Ward, Sagamihara City, Kanagawa Prefecture ■ Details: Five types of pile diameters, with a small diameter of Φ800mm and a large diameter of Φ1300mm. *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dismantling Adhesive Technology Utilization: SFRC Pavement Removal Method

Even with strongly bonded SFRC pavement, it is possible to remove the pavement quietly without damaging the steel deck.

We would like to introduce the "SFRC Pavement Removal Method" using disassembly adhesive technology. While maintaining its function as an adhesive, it is possible to easily peel off the SFRC pavement by heating the steel deck above a certain temperature. There is no need to scrape it off with heavy machinery, allowing for quiet construction. Additionally, no special qualifications are required, and the procedure is simple, making it accessible for anyone to implement. 【Features】 ■ No load on the structure ■ Can be detached without damaging the steel deck ■ SFRC pavement can be removed with low noise ■ Easy disassembly ■ No special qualifications required, and the procedure is simple *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Cassette type"

Compatible with various resin materials! Glass-filled grades can also be molded.

The "cassette type" is a manufacturing method that reduces initial costs and enables shorter delivery times when molds are needed for a large number of prototypes or small-lot mass production. It accommodates a wide range of product sizes with various size variations. Insert molding, two-color molding, secondary processing such as outserts, painting, and silk printing are also possible. We can also procure insert nuts and sheet metal. 【Features】 ■ Diverse small-lot production ■ Short delivery times ■ High precision and quality ■ Reduction of initial costs ■ Super Emperor compatibility *For more details, please refer to the PDF materials or feel free to contact us.

  • Processing Contract
  • Processing Jig
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Rubber Mold"

Introducing a method that uses molds made of silicone rubber, significantly reducing costs and allowing for short production times.

"Rubber molding" is a method of creating replicas using molds made from silicone rubber and other materials. Since expensive molds are not required, it significantly reduces costs and allows for quick production. There are methods such as "casting" using molds made of silicone rubber or acrylic, and "microwave molding" for forming resin parts using microwaves. 【Features】 < Casting > ■ A method using molds made of silicone rubber or acrylic ■ Suitable for mock-ups and small lot production ■ Compatible with various materials such as urethane, epoxy, and silicone rubber ■ Coloring, painting, and texturing are also possible *For more details, please refer to the PDF document or feel free to contact us.

  • Processing Contract
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of rockfall prevention construction methods.

We handle not only giant rocks and collapsed rocks but also deteriorated dams and cultural properties! We introduce a wide range of construction examples.

We would like to introduce examples of "rockfall prevention construction methods" by Daini Kensetsu Co., Ltd. Our rockfall prevention methods are applied in various locations. The DK Bond method, which does not require formwork, is effective for securing high places and large boulders, as well as areas with a high risk of collapse. As a result, we have a track record of construction in steep slopes across Japan, as well as in deteriorated embankments, stone walls, artificial structures, and cultural heritage repairs. If you are facing issues with rockfall prevention methods, please feel free to consult us. 【Examples of Construction】 ■ Securing large boulders ■ Securing collapsed rocks ■ Fixing slope cracks ■ Repairing deteriorated embankments and artificial structures ■ Repairing stone walls and cultural heritage *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Examples of applications for rockfall prevention methods: Combination with other rockfall countermeasures.

When implementing measures for both large and small boulders simultaneously! It is possible to adapt in combination with other rockfall countermeasures.

We would like to introduce examples of applications for the rockfall prevention method by Daini Kensetsu Co., Ltd. Our rockfall prevention method can be adapted for use in conjunction with other rockfall countermeasures. For example, it can be applied simultaneously for measures against large boulders and small boulders. Please feel free to consult us when needed. 【Features】 ■ Applicable when measures against large boulders and small boulders are implemented simultaneously ■ Can be used in conjunction with rockfall prevention works and protective works *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Examples of rockfall prevention methods: Emergency measures and first aid.

Specialized technicians respond quickly from investigation and design to construction! Short-term construction without the need for land acquisition.

We would like to introduce examples of applications for the rockfall prevention construction method by Daini Kensetsu Co., Ltd. Our rockfall prevention method is also applicable for "emergency measures and temporary solutions." For instance, it can be used in urgent situations where "time is limited." There is no need to acquire land for construction, and the temporary structures and construction equipment are minimal, allowing for a short construction period. Additionally, our specialized technicians respond quickly from investigation and design to construction. 【Features】 ■ No need to acquire land during construction ■ Minimal temporary structures and construction equipment, allowing for short construction periods ■ Specialized technicians respond quickly from investigation and design to construction *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Examples of rockfall prevention methods: steep cliffs and high places.

The work will be carried out primarily by human labor! It is a method that does not require large-scale temporary structures or construction equipment.

We would like to introduce examples of applications for the rockfall prevention methods of Daini Kensetsu Co., Ltd. Our rockfall prevention methods can be adapted to "steep slopes and high places." For instance, they can be used in locations where machinery cannot be utilized. The construction work is primarily manual labor and does not require large-scale temporary structures or construction equipment. Please feel free to consult us when needed. 【Features】 ■ Primarily manual labor ■ Does not require large-scale temporary structures or construction equipment *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Examples of applications for rockfall prevention methods: Scenic conservation areas

Utilizing surrounding stones without making significant alterations to the natural group, achieving a result close to nature.

We would like to introduce examples of the rockfall prevention construction methods used by Daini Kensetsu Co., Ltd. Our rockfall prevention methods can be adapted to "landscape conservation areas." For example, this includes scenic spots and natural parks. Without making significant alterations to the natural environment, we utilize surrounding stone fragments (or materials) to ensure that the construction site resembles the natural surroundings. Additionally, we can perform landscape restoration work through coloring and other methods. Please feel free to consult us when needed. 【Features】 ■ Construction methods that do not significantly alter the natural environment ■ Utilization of surrounding stone fragments (or materials) ■ The construction site can achieve a natural appearance ■ Landscape restoration work through coloring and other methods is also possible *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Foundation construction method "NCZ Method"

A construction method that is strong against earthquakes and liquefaction, and excels in cost performance!

The "NCZ Method" developed by our company is a construction method that enhances the seismic resistance and liquefaction resistance of houses while providing a comfortable underground space. By connecting the foundations of the house with an artificial ground, it creates a "solid foundation" with a large area, which is effective against earthquakes and liquefaction. Additionally, due to the large underground structure, it can maintain a stable condition regardless of the soil conditions. 【Features】 ■ High seismic resistance and liquefaction resistance, strong against earthquakes ■ Underground construction costs are about half or less compared to conventional underground houses *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry peel-off service

An efficient peeling method that vaporizes the coating using a fluidized bath of quartz sand heated to approximately 450 degrees.

Our company handles dry distillation paint stripping. Dry distillation stripping uses a fluidized bed of quartz sand, temperature-controlled between approximately 400 and 450 degrees, to gasify various paints and resins. The friction from the flowing quartz sand strips away the adhered materials such as paint and resin. The fluidized bed does not deform the stripped materials and causes minimal damage, while also completely combusting the gases, resulting in less environmental pollution during the stripping process. 【Features】 - Capable of stripping various shapes, including the inner surfaces of cylindrical objects. - Strips various paints at a low cost, regardless of the amount of adhesion (excluding certain paints and shapes). - Minimal friction and degradation of materials, extending the lifecycle of the stripped objects. - Little deformation of the stripped objects. - Capable of processing large quantities in a short time, etc. *For more details, please download the PDF or feel free to contact us.

  • Processing Contract
  • Contract manufacturing
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration