We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method×東京テクノ - List of Manufacturers, Suppliers, Companies and Products

Construction method Product List

16~22 item / All 22 items

Displayed results

[Construction Example] SR45 Multi-Drill Method Underground Obstacle Removal

Introducing examples of smooth removal made possible by using our independently developed tools!

We would like to introduce a case study of underground obstacle removal conducted by our company. In Nihonbashi, Chuo-ku, Tokyo, where the Shinkansen runs nearby, we used the SR45 multi-drill to remove a site construction pile with a diameter of Φ1200 and a depth of GL-22m. The removal of the site construction pile in a narrow area was extremely challenging, but by utilizing our uniquely developed Kelly grab, 3D bucket, and lightweight power jack, we were able to achieve a smooth removal. 【Case Overview】 ■ Project Name: SR45 Multi-Drill Method - Underground Obstacle Removal ■ Construction Date: September 11, 2021 ■ Location: Hon-Ishicho, Nihonbashi, Chuo-ku, Tokyo ■ Details: Φ1200 GL-22m *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles

For inquiries and requests regarding foundation work, contact us! We feature underground obstacles removed using our developed tools.

On our company website, we introduce case studies of underground obstacle removal. On this page, we feature underground obstacles that were removed using tools developed by our company. For more details, please check the related links. Additionally, we have included images of the removal status from January 2022, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (3)

We have published a feature on underground obstacles! For your foundation work needs, please feel free to contact us.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 3 of our special on removed underground obstacles. For more details, please refer to the related links. For requests regarding foundation work, including underground obstacle removal, ground improvement work, existing pile extraction work, site preparation piles, excavation support work, and installation/removal of construction platforms, please feel free to contact us. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (6)

Track record of construction in various fields! Consistent in-house construction from ground surveys to ground improvement work is possible.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 6 of our series on removed underground obstacles. For more details, please refer to the related links. Our company is capable of consistent in-house construction from ground surveys to ground improvement work. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (8)

In the multi-drilling method, tools are selected and constructed according to the situation! Original tools are also developed.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 8 of our series on removed underground obstacles. For more details, please refer to the related links. Our company has also developed original tools and has achieved many results in various field situations. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Sagamihara City, Midori Ward, T Column New Construction and Renovation Work

A total of 290 construction locations with an excavation length of approximately 10m! An example of columnar improvement work using the T-column method.

We would like to introduce a case study of the ground improvement work conducted by our company. In a vast area in Tsukui, Sagamihara City, we performed columnar improvement work using our original deep mixing method and T-column method. Due to the construction involving 290 locations and an excavation depth of approximately 10 meters, we installed a 30-ton silo and plant for the solidifying agent. The solidifying agent was delivered daily, and the work was successfully completed. 【Case Overview】 ■ Project Name: T-Column New Construction and Renovation Work in Midori Ward, Sagamihara City ■ Construction Date: March 16, 2020 ■ Location: Chigira, Midori Ward, Sagamihara City *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Atsugi City Surface Improvement Using Mixing Bucket

Introducing a case of surface improvement related to new construction work conducted in Atsugi City, Kanagawa Prefecture!

We would like to introduce a case study of ground improvement work carried out by our company. In Atsugi City, Kanagawa Prefecture, we performed surface improvement work associated with the new construction of the Atsugi Fire Station South Mouri Branch. A mixing bucket was attached to a 0.7 backhoe, and we mixed 162 tons of solidifying material for an area of 893 m². 【Case Overview】 ■ Project Name: Surface Improvement in Atsugi City Using a Mixing Bucket ■ Construction Date: October 14, 2020 ■ Location: Nagase, Atsugi City, Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration