Manufacturing Factory Construction Achievements: Fuji Seiko Co., Ltd.
Reduction of air conditioning load in midsummer! Introducing our achievements using the yess system architecture.
We would like to introduce our construction achievements using the "yess system architecture." This site is a project from an architectural firm, and we were selected due to our sufficient track record in system architecture. Within the system architecture, aesthetic design was required for the exterior, so we installed wooden decorative panels and prefabricated canopies. The architectural firm designed the system architecture to be both functional and aesthetically pleasing, resulting in a building that satisfies the customer. We also paid attention to insulation, implementing roof insulation and installing heat-shielding sheets, which helped reduce cooling loads during the peak summer months. 【Benefits of Adoption】 ■ The building has satisfied the customer. ■ Attention was paid to insulation, with roof insulation and heat-shielding sheets installed, resulting in reduced cooling loads during peak summer. 【Construction Achievements of System Architecture】 https://kensetsu-labo.jp/n_stage_works/ *For more details, please refer to the PDF document or feel free to contact us.
- Company:中村土建
- Price:Other