We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 39 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 Osaka//Building materials, supplies and fixtures 建材開発部
  2. スワロー工業 Niigata//Building materials, supplies and fixtures
  3. null/null
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 23, 2025~Aug 19, 2025
This ranking is based on the number of page views on our site.

  1. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  2. Dye Q reinforcement method *Repairs for missing areas and anti-corrosion processing are also available!
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Rapid-curing polyurethane spray waterproofing method "Rim Spray"
  5. 5 Heat Exchange Tube Sealing Method "Mechanical Plug - Pop-A-Plug"

Construction method Product List

691~705 item / All 919 items

Displayed results

Dry Diamond Method

Eliminate wastewater sludge without cooling water! It is possible to prevent accidents caused by wastewater freezing in cold weather operations!

Compared to heavy machinery dismantling, the "diamond method" allows for cutting and drilling with low vibration and low noise, and is widely used in civil engineering and construction projects. However, a new problem has arisen where wastewater sludge from the cooling water used during operations contaminates the surrounding environment. The "dry diamond method" is a new technique that eliminates wastewater sludge while taking advantage of the benefits of the diamond method. In dismantling and renewal projects, where reducing environmental impact is essential, this method will serve as a guideline for the future. 【Features】 ■ ECO method that eliminates wastewater sludge ■ Low noise and low vibration method ■ Prevents accidents caused by wastewater freezing in cold weather operations ■ No need for post-processing, can be treated directly as industrial waste *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-flame metal cutting 'Diamond Method'. An alternative to gas cutting.

It is possible to safely cut and dismantle even in environments where gas cannot be used. Large plant equipment, slag from steel mills, and walls made of composite materials containing lead can be cut quickly.

Our company's "Diamond Method" metal cutting technology can cut and drill (make holes) various materials, from metal to ultra-high reinforced concrete. Large equipment can be cut and dismantled in a short time, and it is easy to extract solidified iron slag. For example, it is widely used in: - Modification and construction of machinery related to plants - Petrochemical plants - Steel mills and power plants, etc. Dry cutting using air cooling is possible without using cooling water. During cutting, it can be performed without generating open flames, and remote operation is possible, making it a preferred choice for many companies as an alternative to gas cutting. 【Features】 ■ Capable of cutting complex-shaped objects ■ Can cut both metal and ultra-high reinforced concrete ■ Dry cutting using air cooling without the use of cooling water ■ Can be performed without generating open flames during cutting ■ Remote operation is possible, allowing for flexibility in work locations *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Remote coating removal water jet method "DynaBot"

Achieving high efficiency in paint film stripping work through remote robot construction! Lightweight for easy maintenance! Suitable for removing interior and exterior coatings on various vessels and industrial tanks.

MMJ is a water jet robot that adheres to magnetic surfaces with magnets and can perform remote coating removal. It demonstrates its power in the stripping work of exterior painting of large vessels, industrial tank painting, and painting of steel structures. The wireless operator can control the pump's ON/OFF and the winch's drop prevention brake alone, making it suitable for use in explosion-proof required sites. Its simple and lightweight structure also makes maintenance easy. 【Features】 - Self-spin design with wireless control type, achieving high-efficiency work - Hydraulic drive type capable of vertical movement on walls, overhangs, and horizontal travel - Can change direction at fixed points, allowing for efficient movement - The brake engages when the pump stops, automatically halting the winch's movement *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Example: Musashino Foods Co., Ltd. Kamus No. 1 Factory

Design to construct a single roof that combines the high ceiling of the second-floor manufacturing area with the low ceiling of the office welfare area.

We would like to introduce a case study of Musashino Foods Co., Ltd., for which we undertook the design. As a solution for the production lines of bread crumbs and sliced bread, a multi-story (3-story) manufacturing plant was constructed. To support the loads from the mixers on the second floor and to achieve a 15-meter span, we adopted the prestressed concrete (post-tension) method. The distinctive arched roof shape is designed to create a single roof that accommodates the high ceiling of the second-floor manufacturing area and the lower ceiling of the office and welfare area. 【Overview】 ■ Location: Arashiyama, Hiki District, Saitama Prefecture ■ Construction - Architecture: Toda Corporation - Equipment: Daidan ■ Total Floor Area: 11,000 m² ■ Structure and Scale: SRC construction, 3 stories above ground *For more details, please refer to the PDF document or feel free to contact us.

  • Food Factory Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Daisat Method"

We provide comprehensive support from water treatment to soil improvement and heavy metal immobilization.

This method is an environmentally friendly water treatment and soil improvement technology that uses natural-derived components as its main raw materials. It performs insolubilization treatment for heavy metals from natural sources to human-induced heavy metal contamination, and the contaminated water generates sludge to remove heavy metals. If you are facing issues with water treatment or soil improvement, please feel free to contact us. 【Features】 ■ Environmentally friendly water treatment ■ Soil improvement is possible *For more details, please contact us or download the catalog.

  • Water treatment equipment and technology
  • Soil improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipeline Renewal Insertion Method "SDF Method"

Can be inserted without selecting the bending angle of existing pipes! Long pipes can be manufactured, reducing construction time!

The "SDF Method" is a new construction technique that allows for the insertion of stainless steel flexible pipes into existing aging pipes of small to medium diameter, including those with bends, which cannot be done with traditional insertion methods. Since it can be inserted regardless of the angle of the bends in the existing pipes, the need for construction of vertical piles is reduced compared to other methods. Additionally, because it allows for the production of long pipes, construction time can be shortened, and both the starting and reaching vertical piles can be made smaller compared to other methods, resulting in less area for road surface restoration, less construction-generated soil, and reduced generation of industrial waste. 【Features】 ■ Can be inserted regardless of the angle of bends in existing pipes ■ Shortened construction time due to the ability to produce long pipes ■ Reduction in road surface restoration area, construction-generated soil, and industrial waste ■ Excellent long-term corrosion resistance and durability ■ No occurrence of rust lumps or other issues due to corrosion, with no impact on water quality *For more details, please refer to the PDF document or feel free to contact us.

  • Piping Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP lining method 'SST2-Spray Up'

Achieve cost reduction and short-term construction. In addition to a 10-year warranty, you can also enroll in oil leak insurance.

"SST2-Spray Up" is an FRP lining method that can be completed in as little as 3 days. It can be applied to a wide range of tank types, including above-ground tanks (large and extra-large tanks) and underground tanks. Additionally, the glass fibers form a uniform 3D structure, achieving high strength. Furthermore, there are no unpleasant odors typically associated with conventional FRP lining sites. 【Features】 ■ Safe and secure ■ Completed in just 3 days ■ Strong high corrosion resistance ■ High strength and durability ■ Low cost *For more details, please refer to the PDF materials or feel free to contact us.

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Simultaneous multi-directional hole punching on round pipes"

360-Degree Hole-Punch Revolution!

"Multi-directional simultaneous hole punching for round pipes" is a new method for multi-directional simultaneous hole punching in round pipes, which was difficult with conventional methods using "pushing and pulling devices." Holes can be punched from two directions: inside and outside, resulting in very little warping, misalignment, or burrs, enabling high-precision hole processing. This advantage is expected to be greatly utilized in all fields where pipe processing is required. 【Features】 ■ Significant reduction in processing time ■ Improved processing accuracy ■ No waste ■ Hole punching can be selected from two directions *For more details, please refer to the catalog or feel free to contact us.

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Insulation Pre-cut Method "Raku Puru"

Shortening construction time due to a shortage of carpenters! A method that reduces the average construction time from 1 day to about 1 hour.

"Raku-Pure" is a construction method that solves various issues on site, such as the increase in waste materials and the decline in workability. According to energy-saving housing guidelines, the thickness of insulation materials is on the rise, leading to an increase in the number of materials used. However, with this method, there is no waste generated, eliminating disposal costs. [Features] ■ Shortened construction time ■ No waste generated ■ No disposal costs for waste ■ Improved yield ■ Prevention of losses due to mistakes on site *For more details, please refer to the catalog or feel free to contact us.

  • Other polymer materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor construction method "Chemiseal Floor B·A·NS"

We introduce a flooring construction method that excels in dust resistance, abrasion resistance, and chemical resistance!

"Chemiseal" is a flooring construction method that uses flooring materials manufactured by Chemitech. We offer methods such as "Floor B," which excels in dust prevention, "Floor A," which has excellent chemical resistance and abrasion resistance, and "Floor NS," which is superior in slip prevention. Additionally, we handle "microcapsules," which are extremely small containers with a diameter of approximately a few micrometers (1μm = 1/1,000mm) to about 1mm, created through chemical or physical methods. 【Features】 〈Floor B〉 ■ Excellent dust prevention, abrasion resistance, and cleanability ■ Beautiful finish with a calm gloss ■ Can achieve a film thickness of over 1mm in one application with a trowel ■ Suitable for floors that require frequent cleaning *For more details, please refer to the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Jakago Method "RIO Planter, Bench, Wall"

Strong and elegant! Jakago method using high-quality zinc-coated iron wire with aluminum.

The "RIO Planter Bench Wall" uses high-grade zinc-coated steel wire with 10% aluminum, employing the Jakago method. It offers 20 to 30 years of rust prevention, exceptional strength, and structural calculations are possible. We provide design and estimation proposals tailored to your location. Please feel free to consult us when needed. 【Features】 ■ Uses high-grade zinc-coated steel wire with 10% aluminum ■ 20 to 30 years of rust prevention ■ Exceptional strength and structural calculations possible ■ Design and estimation proposals tailored to your location *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete mirror polishing finishing method "HTC Superfloor"

The concrete floor is transformed into a decorative finished floor! Maintenance and durability are also ensured.

"HTC Superfloor" is a mirror finishing method that creates a beautifully glossy floor resembling marble by polishing the concrete surface. It not only ensures aesthetic appeal but also provides high maintenance and durability. Additionally, it does not generate dust during construction, making it environmentally friendly. With our advanced substrate treatment technology, various concrete floors, whether new or existing, can be transformed into aesthetically pleasing "finished floors." 【Features】 ■ Uses HTC's four-head polishing machine ■ Increased durability compared to the strength of regular concrete surface layers ■ Resistant to tire marks and easy to clean ■ Scratch-resistant ■ Slip-resistant *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Other safety and hygiene products
  • Other abrasives

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Highly designed with a strong coating! Epoxy terrazzo floor construction example.

A robust epoxy terrazzo that is favored in American airports and commercial facilities! It can vividly express various designs and logos!

Tanaka Painting Co., Ltd. is a company that develops its business by performing specialized concrete floor coatings, heavy-duty corrosion-resistant lining coatings, architectural waterproofing, concrete cutting, and polishing work. In particular, for factory floor renovation projects, we consistently carry out everything from surface preparation to floor shaping in-house. The construction method we would like to introduce this time is the "Epoxy Terrazzo Method." This method involves mixing epoxy resin with various colors and sizes of crushed glass, applying it to concrete, and then repeatedly grinding and polishing it after curing to finish. It allows for vibrant expressions of various designs and logos. 【Features of Epoxy Terrazzo Floor】 ■ High design quality! ■ Durable coating can be reproduced! ■ Preferred in American airports and commercial facilities! *For more details, please refer to our catalog or feel free to contact us.

  • Other abrasives

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] N Company, Fuchu, Concrete Mirror Finish

Various concrete floors, regardless of whether they are newly installed or existing, will be transformed into "finished floors" with aesthetic appeal!

We would like to introduce a case of a mirror finish method that finishes the concrete surface to a beautiful, glossy floor like marble by polishing it. After removing 2mm of the existing concrete, we carried out 10 stages of polishing, completing the process with #3000. This method not only ensures aesthetic appeal but also provides high maintenance and durability, and it does not generate dust during construction, making it an environmentally friendly finishing method. 【Features】 ■ Finishes the floor to a beautiful, glossy appearance like marble ■ Ensures high maintenance and durability in addition to aesthetic appeal ■ Does not generate dust during construction ■ Environmentally friendly finishing method *For more details, please refer to the PDF document or feel free to contact us.

  • Other abrasives

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration