We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 483 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. スワロー工業 Niigata//Building materials, supplies and fixtures
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  4. 4 コスモシステム Tokyo//Industrial Machinery
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  3. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  4. 4 Rapid-curing polyurethane spray waterproofing method "Rim Spray"
  5. 5 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト

Construction method Product List

691~705 item / All 1392 items

Displayed results

Upcon Co., Ltd. Company Profile

Upcon is a company that solves problems with 'urethane.' We quickly correct floor sinking, unevenness, tilting, and gaps using rigid polyurethane resin.

Upcon quickly corrects concrete floors that have experienced sinking, unevenness, tilting, gaps, and vibrations due to ground subsidence and earthquakes without halting operations. We repair tilted concrete floors in factories, warehouses, and stores, which are the bases of corporate production and sales activities, as well as in general residences affected by earthquakes and ground subsidence. Additionally, we engage in public works projects using technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is one-tenth that of conventional methods. 2. No operational stoppage: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-sinking compared to conventional methods. We provide total support from on-site investigation to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff propose optimal repair plans tailored to the customer's site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Factory/Warehouse] Upcon Method (Concrete Floor Slab Settlement Correction Method)

If you have tilting, steps, or gaps in factory or warehouse floors due to earthquakes or ground subsidence, then Upcon!

Do you have any of these concerns? ✓ Unable to secure the level of machinery ✓ Warehouse items are not stacked straight ✓ Uneven surfaces make it difficult for forklifts to operate ✓ Cracks are forming in the floor ✓ Gaps are appearing between the floor, walls, and ceiling ✓ Water is pooling due to floor sagging ✓ Insects are appearing inside the building We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, become uneven, tilted, or developed gaps due to ground subsidence and other causes. The Upcon method corrects such floors quickly without stopping operations. Since it can be performed without breaking the existing floor, the construction period is significantly reduced to about 1/10 compared to conventional methods (concrete replacement). There is no need to remove items or machinery, or to install large plants, allowing for construction without halting operations. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our in-house staff, equipped with the necessary skills and qualifications, will assist you! *For more details, please visit the external link page or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Store] Upcon Method (Concrete Floor Slab Settlement Correction Method)

Tilt, steps, and gaps in the store floor caused by earthquakes or ground subsidence. We will make corrections quickly without stopping operations!

Do you have any of these concerns? ✓ Cracks in the floor ✓ Gaps in the floor, walls, or ceiling ✓ Issues with the automatic door opening and closing ✓ Shopping cart moves on its own when you let go ✓ The floor is sagging ✓ Feeling dizzy and losing balance when entering the store ✓ Product racks are tilted We can solve these problems with Upcon! ■ Upcon Method (Concrete Floor Slab Settlement Correction Method) Concrete floors that have settled, have steps, tilts, or gaps due to ground subsidence and other causes. The Upcon method corrects such floors quickly without stopping business. Since it is performed without breaking the existing floor, the construction period is significantly reduced to about 1/10 compared to traditional methods (concrete replacement). There is no need to move or remove product racks or refrigerated cases, and installation of large plants is also unnecessary, allowing for construction without halting operations. We conduct surveys and construction anywhere in Japan, 365 days a year, including weekends and holidays. Our own staff, equipped with skills and qualifications, will assist you! *For more details, please refer to the external link page or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Correcting floor subsidence and tilt in stores/commercial facilities without stopping operations!

Floor subsidence caused by earthquakes and ground sinking. The subsidence correction specialist, Upcon, will fix the existing floor without demolition and in a short period! Over 3,000 successful cases nationwide!

□ Store fixtures and product racks are tilted □ Shopping carts move on their own □ Luggage and products are not stacked straight □ Gaps are forming in the floor, walls, and ceiling □ Cracks are appearing in the floor The issues caused by floor subsidence, tilting, and unevenness will be resolved by "Subsidance Correction Specialist Upcon." With the Upcon method, polyurethane resin is injected under the existing concrete floor, and the pressure from the foaming strengthens the ground and lifts the floor. In principle, there is no need to demolish the existing floor, and there is no need to move heavy product racks or store fixtures, significantly shortening the construction period compared to conventional methods. Additionally, we can accommodate construction limited to nighttime outside of business hours, allowing us to correct floor subsidence without stopping operations.

  • Contract measurement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Large Shopping Center: Correction of Sunken Concrete Floor

Correction made during the night while operations were suspended! A case where two construction plant vehicles were used to expedite the construction schedule.

A large shopping center experienced significant floor subsidence due to weak ground. Gaps were observed in various places, such as between the floor and walls and between the walls and ceiling, caused by the subsidence. As a result, our company implemented repairs. The "Upcon Method," which can be executed during nighttime while the business is closed, was adopted for the repairs. To expedite the construction period, two construction plant vehicles were utilized, and the repairs were completed over 25 nights. 【Construction Overview】 ■ Construction Area: Approximately 3,240m2 (Backyard 405m2, Inside Store 2,835m2) ■ Maximum Subsidence: 94mm ■ Repairs completed over 25 nights ■ Two construction plant vehicles used to expedite the construction period For more details, please feel free to contact us via PDF download or inquiry form.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Shopping Center (Iwate Prefecture): Subfloor Settlement Correction Work

Maximum settlement 71mm, maximum gap 190mm! Conducting polyurethane resin injection work while constantly checking the level!

A shopping center where widespread floor subsidence was observed due to ground subsidence. Due to the floor subsidence, gaps appeared between the floor and walls, causing various issues within the stores. As a result, our company implemented repairs. The "Upcon Method," which can be executed at night during the business closure, was adopted for the repairs. Additionally, since voids were also observed under the floor, filling work was carried out. 【Construction Overview】 ■ Construction Area: Approximately 540m² ■ Maximum Subsidence: 71mm ■ Maximum Void: 190mm ■ Construction completed in 2011, with repairs conducted over 7 consecutive nights. *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Quickly correct the factory floor's slope and the gaps under the floor with rigid polyurethane foam resin!

Correcting floor tilts caused by earthquakes and ground subsidence without stopping operations and in a short period! No need to move machines or equipment! Also suppressing any concerning vibrations from the machines!

■ The machine cannot be leveled. ■ The machine is tilted and vibrating. ■ Malfunctions are occurring in the machine, leading to an increase in defective products. ■ Gaps have formed in the floor, walls, and ceiling. ■ Cracks have appeared in the floor. The "Upcon Method" solves problems caused by floor tilting and sagging due to earthquakes or ground subsidence, as well as voids and gaps that have formed beneath the floor, using polyurethane resin for quick repairs. 【What is the Upcon Method?】 Small holes with a diameter of 16mm are drilled into the existing concrete floor where subsidence has occurred. While continuously monitoring the level in millimeter increments, polyurethane resin is injected. The resin injected beneath the floor expands under pressure in a short time, compacting and strengthening the ground, improving bearing capacity, and pushing the concrete back to a level position. The final strength of the resin is achieved in about 60 minutes. Even if voids have formed beneath the floor, the same method is used to fill those voids. Since the existing concrete floor is repaired without demolition, the construction period is significantly reduced compared to conventional methods. The polyurethane can lift the floor with a foaming pressure of up to 10 tons per square meter, eliminating the need to move heavy equipment or materials. The deformation of the floor is corrected without stopping the production line.

  • Contract measurement
  • Other contract services
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Road Concrete Pavement Slab Settlement Correction Method Achieves Early Lifting of Traffic Restrictions

We will correct the irregularities such as steps and flapping that have occurred in the concrete pavement slabs using specially developed high-strength polyurethane resin, without excavation and within a short construction period.

Using a specially developed high-strength polyurethane resin, we will correct the deformation such as steps and fluttering that occur in concrete pavement slabs commonly used on highways, as well as fill the gaps and voids that have developed under bridge deck slabs, all without breaking the existing concrete pavement and within a short construction period. Injecting polyurethane resin will also improve the loosening of the subgrade. Additionally, it enables the lifting of joints with polyurethane resin along with the bearing slab, fundamentally resolving the issue of correcting the step at the joint, which traditionally required excavation and long-term continuous restrictions or road closures.

  • Repair Agent
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Fukushima Prefecture, Soma Port Port Maintenance Management Work (Quay Restoration)

Due to ground subsidence at the harbor quay, there are steps and depressions in the concrete pavement slabs, resulting in the loss of water gradient and the formation of puddles. This issue is resolved using the upcon method.

The Upcon method, which allows for modifications without breaking existing concrete pavement slabs and within a short construction period, has been widely adopted in public works such as roads and airports as a maintenance and repair method. This time, we will introduce a construction site for correcting the sinking of concrete pavement slabs and filling voids at a quay in a port. The quay at Soma Port in Fukushima Prefecture, where cargo loading and unloading occurs frequently, has experienced issues due to ground subsidence, resulting in steps and sinking in the concrete pavement slabs, eliminating the water slope and causing puddles. This has hindered cargo operations. The Upcon method was chosen because it has no environmental impact compared to other methods and can correct the existing slabs without removal in a short period. [Site Information] Soma Port Port Maintenance and Management Work (Quay Restoration) Construction Area: Approximately 285 square meters Maximum Subsidence: 97mm Construction Period: 4 days For detailed information on the construction process, please refer to the PDF download below.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Bag Manufacturing Factory: Floor Slab Settlement Correction Work and Underfloor Void Filling Work

The machine's level cannot be secured, and spacers are being used. A malfunction has occurred in the machine, affecting product accuracy. This can be resolved with the up-con method.

This time, we will introduce a case study of a bag manufacturing factory in Miyagi Prefecture. Due to the impact of the Great East Japan Earthquake that occurred in March 2011, the floor sank, causing the machines to tilt and hindering production. The Upcon method was adopted because it allows for quick corrections without moving the machines. "We cannot secure the level of the machines and are using spacers." "Malfunctions have occurred in the machines, affecting product accuracy." We receive many inquiries about floor repairs like these at Upcon every day. The feature of the Upcon method is that it can correct floor subsidence in a short time, but another significant advantage is that it does not require the movement of machines or materials for construction. [Site Information] Miyagi Prefecture, Bag Manufacturing Factory Construction Area: Approximately 730 square meters Maximum Subsidence: 111mm Construction Period: 3 days For more details about the construction process, you can view it by downloading the PDF below.

  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Correction Work for Settlement of Logistics Warehouse - Step Adjustment

"Due to the formation of a step in the floor, a ramp was installed." "The floor has settled, causing cracks." Resolved with the up-construction method.

This time, we will introduce a construction case of a logistics warehouse in Niigata Prefecture. In this logistics warehouse, unevenness and cracks occurred in the floor slab due to ground subsidence, which hindered the movement of carts and operations. The Upcon method allows for construction to be carried out without stopping operations and within a short construction period. Additionally, during the polyurethane resin injection, a surveyor is present at all times to manage the floor level in millimeter increments, ensuring a high-quality finish. 【Site Information】 Niigata Prefecture / Logistics Warehouse Construction Area: 1,148 square meters Maximum Subsidence: 71mm Construction Period: 8 days

  • Municipal services and business location

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

"Concrete slab settlement correction method" contributes to the longevity of social infrastructure.

Using high-strength polyurethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and voids that have occurred in the concrete slab, without excavation and within a short construction period.

The Upcon concrete slab settlement correction method (KT-080008-A, NETIS registration period ended October 2014) quickly resolves issues such as settlement, step differences, flapping, gaps, and voids that occur in concrete pavement slabs commonly used in highways and other areas. It utilizes specially developed high-strength polyurethane resin, allowing for a swift solution without breaking existing pavement slabs or requiring excavation work, thus achieving a short construction period. This minimizes the downtime of the facility and has established a track record as a planned and efficient method for maintaining social infrastructure. This technology is also employed not only on highways but in repair work for ports and airport aprons, as well as disaster recovery projects. Upcon will exhibit at the "Highway Techno Fair 2023," where cutting-edge technologies supporting highways will be showcased. Date: November 9 (Thursday) and 10 (Friday), 2023, from 10:00 to 17:00 Location: Tokyo Big Sight, West Hall 3 Exhibition Booth No: A-04 On the day of the event, we will also conduct a demonstration of settlement correction using polyurethane resin. We invite you to take this opportunity to see it. We look forward to your visit.

  • Repair Agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Metal Processing Factory: Floor Slab Settlement Correction Work and Deflection Correction Work

A case where the floor of the corridor in the factory sagged and gaps appeared! Introducing an example of how it was fixed in one day without stopping operations.

We would like to introduce a case of "floor sinking correction work and deflection correction work" conducted at a metal processing factory in Fukuoka Prefecture. Due to ground subsidence over time, the floor of the corridor inside the factory sagged, creating gaps between the walls and the floor. To address the floor sagging and eliminate the gaps between the walls and the floor, subsidence correction work was carried out. After the work was completed, the areas that had sunk by up to 72mm, including the maximum subsidence location, were corrected to within management values, and the gaps that had formed between the walls and the floor due to subsidence were also eliminated. 【Case Overview】 ■ Construction Area: 114m2 ■ Construction Period: 1 day ■ Maximum Subsidence: 72mm ■ Area: Fukuoka Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Laundry Factory: Filling Work for Loose Ground Under Machinery Foundation

Injecting urethane under the mechanical foundation to resolve ground looseness! Solved in a short construction period of one day.

We would like to introduce a case of "filling work for loosening under the machine foundation and urethane filling work inside the pit" conducted at a laundry factory in Kanagawa Prefecture. Due to the loosening of the ground under the machine foundation, the dewatering machine tilted. Therefore, we performed filling work to inject urethane under the machine foundation to resolve the ground loosening, and also carried out work to fill urethane inside the pit where the dewatering machine is installed to prevent further subsidence. After the construction, we conducted a filling confirmation using a CCD camera and confirmed that the urethane was evenly filled under the machine foundation. [Case Overview] ■ Construction Area: 10m2 ■ Construction Period: 1 day ■ Area: Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Packaging Material Factory: Floor Slab Settlement Correction Work

To a factory that produces packaging materials such as cardboard! Introducing examples of subsidence correction work.

Here is an example of "floor sinking correction work" carried out at a packaging materials factory in South Korea. With ground subsidence, the concrete floor also sank, causing the stacked cardboard and other materials in the factory to tilt, which hindered operations. We performed polyurethane resin injection work, continuously checking the level while correcting the sinking. The correction was completed in 4 days with one construction plant vehicle. 【Case Overview】 ■ Construction Area: Approximately 360m2 ■ Location: Incheon, South Korea ■ Construction Period: 4 days *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration