We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 482 Manufacturers, Suppliers and Companies | IPROS GMS

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. 双和化学産業株式会社 Hyogo//others
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  4. 4 アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡 Kanagawa//others
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Anti-corrosion resin lining system Shukura 双和化学産業株式会社
  3. Exposed-type elastic fixed column base method "Free Base Method" フルサト工業 建材開発部
  4. 4 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト
  5. 5 FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition 双和化学産業株式会社

Construction method Product List

1201~1230 item / All 1402 items

Displayed results

[Construction Case] Underground Obstacle Removal Method in Tokyo (Equivalent to BG Method)

Original tools developed! Examples of removal using the all-casing crushing method.

We would like to introduce a case study of underground obstacle removal conducted by our company. This project took place in Nakano Ward, Tokyo, using an underground obstacle removal method equivalent to the BG method. It features the SR-45 standard mast specification. Piles that could not be removed using the pull-out method were removed using the all-casing crushing method. We have provided images of this case study in the related links, so please take a look. 【Case Overview】 ■ Project Name: Underground Obstacle Removal Method (Equivalent to BG Method) ■ Construction Date: May 19, 2022 ■ Location: Nakano Ward, Tokyo ■ Details: SR-45 standard mast specification, depth of 16m *For more details, please download the PDF from the related links or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【施工事例】マルチドリル工法による壁際地中障害撤去

いろいろな地質、地中障害物に対応!壁に接近した施工が可能な事例

当社で行った地中障害撤去の施工事例をご紹介いたします。 東京都大田区にて、マルチドリル工法(BG工法同等)による 壁際地中障害撤去を実施。周辺への影響が少ないので、壁に 接近した施工が可能です。 関連リンクにて、画像付きで本事例をご紹介しておりますので 是非ご覧ください。 【事例概要】 ■工事名:マルチドリル工法(BG工法同等)による壁際地中障害撤去 ■施工日:2022年04月08日 ■所在地:東京都大田区 ■詳細:φ1000、L=2.3m(52本) ※詳しくは関連リンクからPDFダウンロードいただくか、お問い合わせ下さい。

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Study] Special Feature on Removed Underground Obstacles - March

We have a track record of construction in various fields! We can cut, remove, and backfill underground obstacles using various methods suitable for the site.

On our company website, we introduce case studies of underground obstacle removal. This page features a special report on underground obstacles that were removed in March 2022. For more details, please refer to the related links. Our company is capable of cutting, removing, and backfilling underground obstacles using various methods suitable for the site. Please feel free to contact us if you have any requests. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles

For inquiries and requests regarding foundation work, contact us! We feature underground obstacles removed using our developed tools.

On our company website, we introduce case studies of underground obstacle removal. On this page, we feature underground obstacles that were removed using tools developed by our company. For more details, please check the related links. Additionally, we have included images of the removal status from January 2022, so please take a look. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case Studies] Special Feature on Removed Underground Obstacles (8)

In the multi-drilling method, tools are selected and constructed according to the situation! Original tools are also developed.

On our company website, we introduce case studies of underground obstacle removal. This page features Part 8 of our series on removed underground obstacles. For more details, please refer to the related links. Our company has also developed original tools and has achieved many results in various field situations. 【Methods for Underground Obstacle Removal】 ■ Multi-Drill Method (Equivalent to BG Method) ■ All-Casing Method (Equivalent to BG Method) *For more details, please download the PDF from the related links or contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Sagamihara City, Midori Ward T-Column Method (Deep Mixing Method)

There are original construction machines and unique construction methods! An example using a 30t silo with the T-column method.

We would like to introduce a case study of the ground improvement work we conducted. In Midori Ward, Sagamihara City, we implemented our original T-column method (deep mixing method). This was carried out using a newly purchased 30t silo. Our company has many achievements with original construction equipment and unique methods. You can find more details about the case in the related links. 【Case Overview】 ■ Project Name: T-column Method (Deep Mixing Method) in Midori Ward, Sagamihara City ■ Construction Date: December 22, 2021 ■ Location: Midori Ward, Sagamihara City ■ Details: Φ1000 L=10.0m 173 pieces *For more information, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Underground Obstacle Removal - Multi-Drill Method

Introduction of the original tool "Kachi Waku-kun"! Pile removal work using the multi-drilling method.

We would like to introduce a case study of underground obstacle removal conducted by our company. At a site in Honmoku, Yokohama, an existing PHC pile with a depth of 28m and a diameter of 600mm broke during extraction, leading to a request for underground obstacle removal from our company. Using our original tool "Kachi-Wakun," we performed the removal using a casing with a diameter of 1,000mm and the all-casing method with the SR-45 multi-drill excavator. 【Construction Overview】 ■ Project Name: Introduction of "Kachi-Wakun" and pile removal using the multi-drill method ■ Construction Date: September 27, 2023 ■ Location: Yokohama City, Kanagawa Prefecture *For more details, please refer to the related links or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wire Pre-Cutting Method "L-Line System - Wire Unit"

With the unit wiring method, we simplify electrical construction and standardize the installation! Free from the joint connection work of VVF cables, reducing mistakes and shortening construction time!

The electric wire unit cable is a product that pre-cuts electrical wiring for homes and turns it into a unitized form! It streamlines the indoor wiring work of VVF cables (connecting to switches, outlets, lighting fixtures, distribution boards, etc.). This product is processed in a dedicated factory in advance. 【Features】 ■ Reduction of construction errors and shortened construction time By using color sheathed cables and destination labels, construction errors can be reduced. Since wiring at the ceiling beams is unnecessary on-site, work time is shortened. ■ Preservation of electrical drawings Approval drawings for the power company can be created, digitized, and managed for preservation. ■ High quality and high reliability Since branching connections are processed in the factory and all circuits are inspected, it is possible to deliver good products. ■ Diverse needs In addition to electric wire units, it is also possible to pick up information-related wiring devices and ship them by individual residence. ■ It is certified by the Japan Electric Wire and Cable Industry Association (JCS).

  • wr_wire_05.jpg
  • wr_wire_07.jpg
  • wr_wire_06.jpg
  • IMG_4505.JPG
  • IMG_4483.JPG
  • Wiring materials
  • Other CAD
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Herbicide for green space management "Esplanade Light Flowable"

Stable effects against annual grasses and broadleaf weeds before emergence! It suppresses weed growth for an extended period.

"Esplanade Light Flowable" is applied twice a year (spring and summer) to suppress the growth of annual weeds before they emerge throughout the year, achieving zero mowing. It forms a treatment layer on the soil surface, which is absorbed by the sprouts and roots of weeds that begin to grow from seeds, causing them to die before they can develop. 【Features】 ■ Provides stable effects against pre-emergent annual grasses and broadleaf weeds. ■ Suppresses weed emergence (seed germination) for an extended period. ■ Contributes to reducing container waste due to low dosage. ■ A flowable formulation that is easy to prepare. - NETIS registration number "KT-200114-A" - New technology name Weeding technology that achieves zero mowing through the application of Esplanade Light Flowable. *For more details, please download the PDF or feel free to contact us.

  • Other tools and equipment
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Performance results of rockfall prevention construction methods for seismic resistance.

No changes even at seismic intensity 7! We would like to introduce the seismic performance results of our rockfall prevention construction method.

We would like to introduce the "Seismic Performance Achievements" of Daini Kensetsu Co., Ltd. Our rockfall prevention method is designed to withstand massive earthquakes and has proven effective in various locations across Japan. It showed no deformation even during the Great Hanshin-Awaji Earthquake, which registered a magnitude of 7 in 1995, and has successfully endured numerous earthquakes since, including the 2000 Tottori Prefecture Western Earthquake and the 2007 Noto Peninsula Earthquake. If you have concerns regarding rockfall prevention methods, please feel free to consult with us. 【Seismic Achievements】 ■ Great Hanshin-Awaji Earthquake (Magnitude 7) ■ Tottori Prefecture Western Earthquake (Magnitude 6+) ■ Geiyo Earthquake (Magnitude 6-) ■ Noto Peninsula Earthquake (Magnitude 6+) ■ Great East Japan Earthquake (Magnitude 6-) ■ Kumamoto Earthquake (Magnitude 7) *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Examples of applications for rockfall prevention methods: very unstable large boulders.

Ensure safety during construction with temporary adhesion! This method does not introduce vibrations that pose a high risk of falling rocks.

We would like to introduce examples of applications for the rockfall prevention construction method by Daini Kensetsu Co., Ltd. Our rockfall prevention method is adaptable even to "very unstable large boulders." For example, this includes large boulders on ridges. During construction, we ensure safety measures by performing temporary adhesion without applying vibrations that pose a high risk of rockfall. Additionally, it is not affected by the size or shape of the target boulder. 【Features】 ■ A method that does not apply vibrations that pose a high risk of rockfall ■ Ensures safety during construction through temporary adhesion ■ Not affected by the size or shape of the target boulder *For more details, please refer to the PDF materials or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rock bonding DK bond method *A list of construction achievements will be provided!

Over 3,900 construction achievements! Introducing our original rock bonding method that withstands massive earthquakes.

The "Rock Adhesion DK Bond Method" is a rockfall prevention technique that uses adhesive material (DK Bond Mortar) to bond unstable rock masses to solid bedrock, thereby achieving stability through integration. Since the development of this method, it has been implemented on a national scale for over 40 years, with more than 3,900 successful projects. It can be applied to steep slopes, high locations, and very unstable boulders, and it possesses seismic performance that can withstand massive earthquakes. We are currently offering a document summarizing our construction achievements. 【Features】 ■ Effective for large boulders and high rock locations ■ Easy to combine with other methods ■ Effective for preserving natural landscapes *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rivet Method "OURET Method"

Breakthrough the common sense of joining! New joining methods developed through unique construction techniques.

The "OURET method" is a completely new riveting technique that utilizes plastic flow through press processing to fill a groove provided in the joining target with base material for joining. Furthermore, it enables riveting under conditions that were difficult with conventional methods, such as hardened material shafts, resin, pipes, zero riveting, and simultaneous processing of multiple parts, thus infinitely expanding the possibilities in the field of joining with this patented technology. 【Features】 ■ Joining with press-formed sheet metal is possible regardless of the material of the shaft section. ■ By converting machined parts to pressed parts, material cost loss and machining costs can be reduced. ■ Procurement costs for parts can be compressed. ■ There are also achievements with coaxial connectors. ■ Challenges that were difficult with conventional methods can also be handled. *For more details, please refer to the PDF document or feel free to contact us.

  • Mold Design
  • Contract manufacturing
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Partial pressure resistance test method 'SPC_CARBER'

Easily "isolate" pipes and nozzles to significantly improve efficiency.

"SPC_CARBER" is a method that allows for easy "isolation" when updating or repairing piping and nozzles, enabling welding work and pressure and airtightness testing. Various ancillary tasks that occurred during conventional construction are reduced, leading to shortened processes, cost reductions, and a safer working environment. 【Features】 ■ Process shortening ■ Significant reduction in workdays ■ Substantial cost reduction ■ Mitigation of risks associated with high-pressure testing *For more details, please download the PDF or feel free to contact us.

  • Impact Test
  • valve
  • Piping Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforcement Method "Dye Q"

A new method that regenerates and prolongs the life of structures through coating, achieving restoration of strength!

"SOME-Q" is a reinforcement method that allows you to use existing items as they are, enabling not only repairs but also reinforcements. It penetrates the degraded internal structure of the target object with a "new material," integrating it and thickly covering its surface to perform repairs and reinforcements, thereby preventing further deterioration. Additionally, it integrates with the target object using a unique nano-bonding technology, ensuring long-lasting effects. 【Features】 ■ Integration with the target object through the surface treatment effect of the new material and nano-bonding technology ■ Overwhelming strength and excellent durability for extended lifespan ■ No need to stop operations - utilizes what is already available *For more details, please download the PDF or feel free to contact us.

  • 3-2.png
  • 3-3.png
  • 3-4.png
  • 3-5.png
  • Repair Agent
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Method "3RM System"

Ideal for small lot production! An eco-friendly method that achieves short delivery times and low costs.

The "3RM System" is an eco-friendly method that involves replacing only the parts related to the mold products and reusing shareable parts. We efficiently manufacture only the necessary components using shared parts, tailored to each customer's unique requirements. Please feel free to contact us for more information. 【Features】 ■ Efficient manufacturing made possible by a thorough product management system ■ Achieves short delivery times and low costs ■ Suitable for lots ranging from several dozen to several hundred units *For more details, please download the PDF or feel free to contact us.

  • Contract manufacturing
  • Other molds
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Do you have any concerns about landscape paving?

Beautiful, economical, and highly durable. This is an introduction to the landscape construction methods of the future that will replace block paving. We also present examples of common concerns.

"Street Print" is a completely new landscaping technique that involves reheating asphalt, embossing it, and then coloring it. By utilizing asphalt as it is, issues such as "cracking" and "unevenness" that occur with block paving are eliminated, significantly reducing maintenance efforts. It also achieves a reduction in maintenance costs. 【Features】 ■ Utilizes asphalt as it is ■ No "cracking" or "unevenness" typical of block paving ■ Achieves a reduction in maintenance costs ■ High durability ■ Beautifully finished to resemble cobblestones or brick paving *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-temperature water pressure and simultaneous suction cleaning method "Hot Jebro Method"

No worries about environmental pollution! Clean and remove dirt with three elements: "hot water, high pressure, and suction"!

The "Hot Jebro Method" is a technique that simultaneously performs the cleaning process and wastewater recovery using three elements: "hot water, high-pressure washing, and wastewater collection." It removes various types of dirt, including interlocking blocks, tactile paving, non-slip sheets, porcelain tiles, and concrete. Additionally, since it uses hot water, there is no need for detergents, but if there are stubborn stains, detergents can be used and will be simultaneously suctioned. 【Features】 ■ Simultaneously performs the cleaning process and wastewater recovery with the three elements of hot water, high-pressure washing, and wastewater collection ■ Removes various types of dirt ■ Does not require detergents due to the use of hot water ■ No concerns about environmental pollution *For more details, please refer to the PDF materials or feel free to contact us.

  • High pressure cleaner
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exhibiting at the Kansai Logistics Exhibition! A method that allows for printing on adhesive sheets and pressure transferring only the image.

A new transfer printing method utilizing the patented technology "Smart Paper," which differs in mechanism from conventional sign sheets for general use.

We will be exhibiting at the 4th Kansai Logistics Exhibition in Intex Osaka from April 12 to 14, 2023! Booth number: C5-31 Smart Paper is a patented technology that allows images to be printed directly onto adhesive sheets without a substrate, enabling the transfer of only the image portion through pressure. 【Product Overview】 ◆ It can be applied to various surfaces such as concrete, asphalt, concrete blocks, steel plates, corrugated steel plates, glass, wood, and walls. ◆ Any design and detailed images can be printed in full color as desired. ◆ From caution signs, safety signs, guidance signs, and manners improvement displays to characters, logos, and decorative designs, it can accommodate any size, demonstrating overwhelming appeal. ◆ All issues commonly associated with traditional line tapes and sheet types, such as easy peeling, partial peeling that poses safety risks, susceptibility to tire twisting, residue that causes dirt, cracking, and difficulty in removal, can be resolved.

  • Printing/Publishing
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Deep drawing method

A unique method aimed at reducing material costs! It is possible to form ultra-thin pipes with a diameter of φ3.0.

We would like to introduce our "Deep Drawing Method." This method allows us to form pipes while drawing sheet material with a punch (die), significantly reducing material costs. Additionally, we can also form pipes with a diameter of φ3.0, achieving more than 90% of the original sheet thickness. Please feel free to contact us when you need our services. 【Features】 ■ Forming pipes while drawing sheet material with a punch (die) ■ Capable of forming pipes with a diameter of φ3.0 ■ Achieves more than 90% of the original sheet thickness (t0.8) *For more details, please refer to the related links or feel free to contact us.

  • Pipe and cable cutters
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-flux tin plating method (running bath plating)

Due to the differences in the plating process itself, uniformity of the plating can be ensured, leading to improvements in the quality of the outer diameter and elongation!

Our company offers tin-plated soft copper wire considering the life cycle of electric wires. Aiming for an environmentally friendly production line, we introduced a plating technology that does not use any flux, organic or inorganic, at our Otawara factory established in 1990, and began manufacturing tin-plated soft copper wire. Since then, over the course of several years, we have made improvements to ensure the quality and reliability of the plating, and today we provide products that satisfy specific quality requirements for certain customers, allowing them to use our products with peace of mind. 【Features (Comparison with our products)】 ■ Due to the difference in the plating method itself, uniformity of the plating can be ensured, leading to improved quality of outer diameter and elongation. ■ There is less secondary impact on the tin-plated surface from residual chlorine, making it effective in preventing the generation of tin dross. ■ Since it does not contain halogen elements, it helps suppress the generation of harmful gases during the incineration of electric wires. ■ It is suitable for conductors used in eco-cables. *For more details, please feel free to contact us.

  • Processing Contract
  • Surface treatment contract service
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Muscle Suit "GS-BACK"

An assist suit that makes the action of unloading luggage more flexible and reduces the burden on the waist!

The muscle suit "GS-BACK" is a lightweight and agile assist suit. It makes "manual handling" tasks that cannot be mechanized easier and more effortless. It can be used for various manual handling tasks at different work sites. It allows for more freedom of movement when walking, squatting, and standing up, reducing the burden on the lower back. 【Features】 ■ Makes "manual handling" tasks easier and more effortless ■ Lightweight and agile ■ Allows for more freedom of movement when walking, squatting, and standing up ■ Usable for various manual handling tasks at different work sites ■ Reduces the burden on the lower back *For more details, please refer to the PDF document or feel free to contact us.

  • Other safety and hygiene products
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Paul's repair and reinforcement method: YCK method

Repair and reinforcement method for poles using carbon fiber! Achieve extended life for poles with low cost and speedy construction. Applicable to concrete poles as well.

At Yoshimoto Pole, we are implementing the "YCK Method" using thermoplastic carbon fiber material "CFRTP." Taking advantage of the thermoplastic characteristics, the sheets are formed into rolls, making it an easy method that simply involves applying adhesive to the pole and sticking it on. This speedy work reduces construction costs and extends the lifespan of the pole until the time for replacement and renewal. Additionally, as a pole manufacturer, we conduct bending strength tests to confirm the effectiveness. [Features] ■ Low-cost and speedy response to dangerous aging deterioration ■ Multi-layer structure to stop corrosion ■ Approximately 10 years of lifespan extension effect ■ Quick construction in a short time *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Architectural exterior and plaza lighting pole "YF-L Series"

A super slim lighting pole with a total height of 4.5m, made of φ48.6 steel pipe! It features a slim design for three light fixtures.

We would like to introduce the lighting pole "YF-L Series" for architectural exteriors and public squares that we handle. The public furniture "YF-LD" is an ultra-thin lighting pole with a total height of 4.5m, made primarily of φ48.6 steel pipe. The specially designed lighting fixture utilizes a slim three-light design to take advantage of the pole's slenderness. Additionally, we also offer the "YD," a dedicated lighting fixture for YF-LD, and the made-to-order "YF-LD-450" in our lineup. Please feel free to contact us if you have any requests. 【YF-LD-450 Specifications】 ■ Application: Lighting fixture ■ Material: General steel pipe (STK400) ■ Total height: 4500mm ■ Surface treatment: Hot-dip galvanized followed by specified color painting ■ Design standards: JIL (Japan Lighting Manufacturers Association) (V = 50m/s) *For more details, please refer to the PDF materials or feel free to contact us.

  • LED lighting
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vinyl ester resin anti-corrosion system "NK Flake Method"

It excels in resistance to organic acids! It complies with concrete anti-corrosion technology guidelines.

The "NK Flake Method" is a system that enables the reduction of the life cycle cost (LCC) of concrete. It is a method that combines vinyl ester resin FRP, which has excellent chemical resistance, with flake lining, boasting a long track record and high reliability for corrosion protection of flue gas desulfurization equipment, corrosion protection of the bottom plates of oil storage tanks, and corrosion protection of marine structures. This ultra-durable corrosion protection system is designed to suppress corrosion of concrete structures caused by hydrogen sulfide generation and to facilitate maintenance, while also possessing resistance to organic acids. 【Features】 ■ Excellent resistance to sulfuric acid, alkali, and water ■ Excellent resistance to organic acids ■ High adhesion due to the use of a special primer suitable for wet surfaces ■ Flake effect to prevent the penetration of liquids and gases *For more details, please refer to the PDF document or feel free to contact us.

  • NKフレーク工法2.PNG
  • NKフレーク工法3.PNG
  • NKフレーク工法4.PNG
  • Other polymer materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration