We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 39 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 30, 2025~Aug 26, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 30, 2025~Aug 26, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. フルサト工業 Osaka//Building materials, supplies and fixtures 建材開発部
  3. スワロー工業 Niigata//Building materials, supplies and fixtures
  4. 4 null/null
  5. 5 null/null

Construction method Product ranking

Last Updated: Aggregation Period:Jul 30, 2025~Aug 26, 2025
This ranking is based on the number of page views on our site.

  1. [Free Inspection] Teratech Method to Fill Underfloor Cavities and Reduce Machine Vibration
  2. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  3. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  4. 4 Dye Q reinforcement method *Repairs for missing areas and anti-corrosion processing are also available!
  5. 5 Rapid-curing polyurethane spray waterproofing method "Rim Spray"

Construction method Product List

601~615 item / All 917 items

Displayed results

Asphalt Concrete Repair Method "RED COAT RG"

High-speed repair of defects and unevenness on the floor. After construction, vehicle passage is allowed in about 1 hour. It boasts excellent durability even with thin application!

"RED COAT RG" is a repair method for asphalt and concrete that quickly resolves unevenness, depressions, and ruts that occur on floors in factories, warehouses, and other areas. It exhibits high durability and wear resistance even with a thin application, and also provides slip resistance. It has excellent quick-drying properties, allowing forklifts and other vehicles to operate about an hour after application. For areas where large trailers operate or around manholes, repairs can also be made using a special method called the ARD method to enhance strength. 【Features】 ■ Quickly repairs damage, cracks, and unevenness due to aging ■ Applicable in areas with significant substrate movement ■ Uses a paint that cures even in sub-zero temperatures down to -10 degrees ■ A wide variety of color options *For more details, please refer to the materials. Feel free to contact us with any inquiries.

  • Repair Agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel pipe pile on-site automatic welding robot method "ECS-AW"

On-site automatic welding robot method 'ECS-AW' that meets the needs of on-site welding.

This is an automatic welding robot method developed to solve various issues related to welding operations at construction sites, such as variations in welding work conditions, differences in the skill levels of welders, and fluctuations in precision due to weather conditions. It enables consistently high-quality on-site welding. 【Features】 - Achieves high-quality on-site welding - Easy to operate, accurate, and speedy For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground reinforcement "GRR sheet method"

Environmentally conscious! Ground reinforcement method using geotextiles.

The GRR sheet method is a construction technique that protects valuable properties, such as homes, from differential settlement by dispersing and equalizing tension and ground forces through the effect of special sheet installation. Additionally, it does not use cement-based solidifying materials or piles, making it environmentally friendly and preventing it from becoming a negative legacy. Furthermore, the value of a home is not just in the building itself. Ground improvement using cement-based solidifying materials or reinforcement work using piles leaves buried materials in the ground. The GRR sheet does not remain in the ground and can be easily removed during reconstruction. 【Features】 - Does not decrease land value - Environmentally friendly and safe for the human body - Stable quality - Can be constructed in cultural heritage burial sites - Highly reliable For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

200-Year Concrete, Re-vibration High-Density Concrete, JS/JPS Method

Introduction of case studies on re-vibration construction! Reducing cracks and increasing service life! Also contributes to total cost reduction.

Our "JS Method and JPS Method" is a new construction technique that enables simultaneous high-density concrete placement through re-vibration, aiming to reduce construction time, labor, and total costs while enhancing durability, lifespan, and the asset value of buildings. In our case studies, we clearly introduce the features of the "JS Method and JPS Method," as well as the differences from conventional methods and the construction process. 【Features】 ■ Significantly reduces cracking ■ Lower cost compared to conventional methods ■ Excellent delay effect against carbonation *For more details, please download the catalog. Feel free to contact us with any inquiries.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Re-vibration construction method: "Differences from conventional vibration tampers"

Ideal for factories, warehouses, and roads! High-density 200-year concrete: Three differences from conventional equipment.

The re-vibration and high-density concrete method is a construction technique that removes voids and water channels that cause cracking, and forms a dense effective structure within the concrete to improve its density. There are three differences between the conventional vibration tamper and the vibration tamper used in the re-vibration and high-density concrete method regarding their capabilities to remove footprints, maintain floor level, and eliminate water channels. 【Three Differences from Conventional Vibration Tamper】 1. Footprint Removal Capability ⇒ The conventional vibration tamper has a narrow compaction area, making it impossible to remove footprints. 2. Floor Level Maintenance Capability ⇒ The conventional vibration tamper sinks into the floor, making it difficult to maintain floor level and prone to damage. 3. Significant Water Channel Removal ⇒ The conventional vibration tamper has a narrow compaction area, resulting in insufficient removal of water channels. *For more details, please refer to the catalog or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Material1: River surface water intake method

Creating a rich community of water and greenery. Introducing the "River Surface Water Intake Method" from Shiga Industrial.

The "river surface water intake method" refers to a system that establishes a separate waterway in the river's flow, installing a surface water intake valve at the flow center to allow the passage of impurities while only extracting clean surface water. This method enables the use of river water, making it equivalent to well water, which has traditionally been considered optimal for water quality. The river surface water intake method can prevent environmental degradation such as ground subsidence compared to groundwater use. Additionally, it has made water intake easier in mountainous areas where wells cannot be drilled. Since it uses natural water, it can be discharged in its extracted state without concerns about environmental pollution. Furthermore, it can also resolve issues such as pump failures caused by impurities. Currently, there are nine water intake facilities using this method established in Shiga Prefecture. Developed in collaboration with a company in Hiroshima for snowmelt facilities in areas with heavy snowfall, this method is also gaining attention as a suitable water intake method for rice cultivation due to its higher temperature as surface water. Please feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New Chucking Method: ES Chuck

Reduce the installation, removal, and cleaning time of workpieces by half! A new chucking method "ES Chuck" that allows for removal and cleaning with water at room temperature.

The "ES Chuck" is a patented technology in both Japan and the United States that allows for freezing and fixing at temperatures close to room temperature for processing. It can be used with precision surface grinding machines, rotary grinders, slicing machines, machining centers, cylindrical grinders, lathes, dicing saws, and more. It utilizes a special environmentally friendly low-temperature solidifier to easily secure the workpiece. It is also suitable for processing non-magnetic materials and for removing warping from thin magnetic materials. 【Features】 ■ Freezing fixation ■ Does not distort the workpiece ■ Thin and hard adhesive layer ■ Can use water-soluble grinding fluids ■ Removable at room temperature *For more details, please refer to the PDF document or feel free to contact us.

  • Other processing machines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Port Guard AF System Construction Case Study: Gasteinari Gas Science Museum

For design and aesthetic durability! We offer two types: matte and semi-gloss.

We would like to introduce a case study of the "Portoguard AF System" handled by Central Concrete, which was applied to the Gas Science Museum "Gasutenani." The "Portoguard AF System" is a concrete protection method that uses a water-based fluororesin clear coat, which excels in low pollution and weather resistance. It is also possible to adjust the pattern color and apply non-intrusive partial coloring, and we have a lineup that can meet the requirements for the building's purpose and the atmosphere or image you wish to express. 【Case Overview】 ■ Building Name: Gas Science Museum "Gasutenani" ■ Photographer: Koji Horiuchi ■ Design Contractor: Nikken Sekkei Ltd. ■ Construction Contractor: Taisei Corporation *For more details, please refer to the PDF document or feel free to contact us.

  • Other polymer materials
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Free Art (Floor Coating)"

Using Kaimu paint Concretal as the base material! Prevents the occurrence of unsightly mold and the risk of slipping.

"Freely Art (Doma Coating)" not only corrects color differences in concrete and enhances strength, but also expresses a vibrant atmosphere on the floor, making the concrete, which deteriorates and gets dirty over time, even more beautiful and unique. Using Kaimu paint Concretal as the base material, it ensures toughness through a special construction method for load-bearing. Since it uses natural pigments, it is resistant to ultraviolet rays and does not discolor or fade. It prevents the occurrence of unsightly mold and reduces the risk of slipping. 【Features】 ■ Cost-effective and speedy installation ■ Walkable just one hour after installation, and parking possible after 24 hours ■ Uses Kaimu paint Concretal as the base material ■ Resistant to ultraviolet rays, no discoloration or fading ■ Can suppress mold and moss *For more details, please refer to the related link page or feel free to contact us.

  • Company:SGM
  • Price:Other
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Crack detection coating system for concrete structures - Cladis method

Solving the issues of structural inspections! A method where cracks in structures glow under ultraviolet light.

The Cladis method is a painting system that detects "cracks" that occur on concrete surfaces. By applying this paint to the structure in advance, cracks will emit light under special ultraviolet rays, making inspection work very simple, accurate, and cost-effective. The frequency of inspections can also be increased, allowing for precise understanding of structural changes. Emergency inspections immediately after disasters such as earthquakes or floods can be conducted swiftly. The coating consists of two layers, and by irradiating ultraviolet light during inspections, only the cracked areas will emit light. The painting does not require special techniques or tools, making the inspection process straightforward and reducing work time. 【Features】 ○ Easy to apply ○ Glows under ultraviolet light ○ Easy crack detection ○ No oversights during inspections ○ Increased inspection speed For more details, please contact us or download the catalog.

  • paint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-performance adsorption method for heavy metals: "Catch Mud Method"

Contributing to environmental conservation! A construction method that combines low cost with high safety and long-term stability.

The "Catch Mud Method" is a technique that combines low cost with high safety and long-term stability, surpassing conventional adsorbents. This method uses the high-performance heavy metal adsorbent "TG Catch II" as the main agent, mixing it with uncontaminated soil and creating an adsorption layer called "TG Catch Aid." By allowing contaminated water to slowly permeate through this layer, it effectively adsorbs heavy metals, rendering them insoluble and stabilizing them. 【Features】 ■ Utilizes the high-performance heavy metal adsorbent "TG Catch II," which has superior adsorption properties compared to conventional adsorbents. ■ An auxiliary adsorption layer can be added beneath the "TG Catch Aid" layer to further enhance safety. ■ A method that combines low cost with high safety and long-term stability, surpassing conventional adsorbents. ■ Contributes to further environmental conservation by covering contaminated soil with capping materials. *For more details, please refer to the catalog or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SPD method

Compatible with various ground conditions! Achieves simplification and can be deployed with construction methods suitable for factory sites.

The "SPD Method" is a construction method designed to be effective against surface collapse, characterized by excellent workability, economic efficiency, and a goal of short-term construction. The hydraulic hammer operates by using its own weight to drive steel pipes, with a hammer load of only 23 kg. Even when combined with the weight of a 4.0 m steel pipe, the total is around 53 kg, resulting in relatively low vibrations during installation, which helps to minimize loosening of the slope caused by vibrations. Additionally, since the steel pipes being installed are treated as restraining elements and no tensile force is expected, pressure plates are not used. This allows for the option to embed the pipe heads underground or cut off protruding piles at the surface, leaving no structures above ground. **Features** - Lightweight and minimal equipment, making transportation easy - Relatively low vibrations - No structures left on the surface - Effective method for addressing surface collapse - Excellent workability *For more details, please refer to the PDF materials or feel free to contact us.*

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Support for seismic reinforcement and pier construction! "Temporary Closure LPF Method" *Case study collection available.

Construction is possible even with a headroom limit of 1.5m or less! Achieves excellent water stopping performance with simplicity and speed!

The "Temporary Closure LPF Method" is a construction method for building temporary closures for underwater structures such as rivers, seas, and dams using liner plates. It addresses the issues of conventional closure methods and supports bridge pier reinforcement with "simplicity, speed, and excellent water-stopping capability." It can be implemented using only manual labor. This groundbreaking NETIS-registered method can be used in environments with a headroom restriction of 1.5 meters or less! Please feel free to contact us for more information! *Currently, we are offering a collection of case studies featuring the construction results of the "Temporary Closure LPF Method" for free exclusively to Ipros users! 【Features】 ■ Composed of liner plates (waterproof specifications), water-stopping rubber gaskets, H steel (reinforcement rings), and cutting beams ■ Can be constructed using only manual labor! ■ Construction is possible with a headroom restriction of approximately 1.5 meters! ■ Vibration-free, allowing construction close to existing structures (gas, electricity, water pipes, etc.)! ■ NETIS registration: CB-110010-VE (patented) *For more details, please refer to the catalog. Feel free to contact us as well.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration