We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 42 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. スワロー工業 Niigata//Building materials, supplies and fixtures
  3. メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  4. 4 コスモシステム Tokyo//Industrial Machinery
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. Solar Mounting System D-SWAT SAMURAI Replacement Method スワロー工業
  3. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  4. 4 Rapid-curing polyurethane spray waterproofing method "Rim Spray"
  5. 5 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト

Construction method Product List

586~600 item / All 1391 items

Displayed results

WT method + TNF method

Integrating the ground behavior of gas stations on weak ground! Protecting buried facilities from earthquakes and other hazards.

We introduce a suitable construction method for the burial of tanks and piping at gas stations. By applying the "WT method," we form a container to house buried facilities such as tanks using improved ground. By combining it with the "TNF method," we integrate the ground behavior of gas stations on soft ground, protecting buried facilities from earthquakes and ground subsidence. Additionally, it eliminates the need for sheet piles and bracing, achieving a reduction in construction time and costs. 【Features】 ■ Suitable for soft ground - No uplift due to the absence of piles, preventing damage to piping - Applying the TNF method under buildings and in external structures prevents damage to underground facilities ■ Achieves low cost and reduced construction time - Eliminates the need for sheet piles and bracing, achieving a reduction in construction time and costs *For more details, please refer to the PDF document or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TNF method

Over 1,300 achievements nationwide! No need for pile driving, formwork, or foundation work.

At Yoshimitsu Corporation, we carry out ground improvement to create artificial bedrock suitable for buildings on weak ground across the country. Compared to pile foundations, we achieve approximately 30% cost reduction. Since pile work, formwork work, and ground preparation work are not required, the construction period is shortened by 50%. Please feel free to contact us when you need our services. 【Features】 ■ Approximately 30% cost reduction compared to conventional methods (pile foundation) (for a total floor area of 1000 m² and pile length of 30 m) ■ Construction period shortened by 50% compared to conventional methods, as pile work, formwork work, and ground preparation work are not required (for a total floor area of 1000 m² and pile length of 30 m) ■ No piles are used, which also reduces demolition costs when dismantling the building *For more details, please refer to the related links or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CFS method

Achieving high durability in a short construction period! Excellent insulation and reliable fire resistance with external insulation method.

The "CFS method" has been spreading mainly in North America and Oceania since the 1990s, and in Japan, it was established as a general method through a notification in 2001, with a revision in 2012 that expanded it to four-story buildings. By utilizing the CFS architectural design support program and the CFS planning guide, significant streamlining of the complex structural design and panel design tasks for CFS buildings is possible. With the integrated structural calculation program for CFS buildings, calculations can be continuously performed from the superstructure to the foundation structure, allowing for automatic generation of structural drawings and calculation reports. We provide full support from CFS architectural design to construction. 【Features】 ■ Support network for CFS buildings ■ Full support for CFS architectural design and construction ■ High durability achieved in a short construction period ■ Excellent insulation and reliable fire resistance with external insulation method *For more details, please refer to the PDF materials or feel free to contact us.

  • Other services
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Patent Pending] Single-axis Soil Continuous Wall GuisWall Method

A new construction method using a special blade to build structures underground! (Patent Application: 2021-17112)

The "Soil Continuous Wall GuisWall Method" is a new construction method currently under patent application, which uses a special blade to drill overlapping holes for elements and both ends, followed by the insertion of H-steel for construction. Using a dedicated drilling machine, the ground is drilled with an auger, and while discharging cement milk from the tip of the auger, the drilling and mixing of the first and second elements are performed. Next, the third element is constructed by overlapping the end holes of the first and second elements for drilling and mixing. During this process, a special blade is attached and inserted to ensure that the H-steel does not sway sideways, allowing the structure to be built underground. Additionally, due to the single-axis construction method, it is also possible to drive long retaining piles and pier (platform) piles. 【Product Lineup】 ■ Single-axis method (patent application pending, application number: 2021-17112) ■ SMW method * For an overview of the method, please refer to the [PDF download] for materials, and feel free to [contact us] for more details.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Case: Injection Work

Injecting a solidifying agent into the voids of sandy soil! Introducing a method to improve it into a stable ground.

"Injection" is a method of improving sandy ground by injecting a solidifying agent (chemical solution) into the voids of the soil to create a stable foundation. First, a survey is conducted to check for any obstacles, and the construction site is marked. A boring machine is set up, and while supplying drilling fluid (chemical solutions A and B), the drilling rod is pressurized and injected to drill to the specified depth. In the first injection, a quick-setting type of chemical is used to fill large voids in loose sand layers and cohesive soil sections, preventing the injected chemical from diffusing or escaping from the injection site. In the second injection, a medium-setting to slow-setting type of chemical is used to permeate and inject into the smaller voids of sandy ground that contain a significant amount of medium to well-compacted sand layers and cohesive soil, solidifying the ground as a whole. Once the specified injection amount for one stage is reached, the process moves to the next stage, and after repeating this for all stages, the chemical solution is replaced with water to fill the injection holes while withdrawing the rods. *For more details, please refer to the related link page or feel free to contact us.*

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No-fire piping joint (Lokring) method

In areas where the use of fire is restricted, in narrow surroundings where welding is difficult, and for piping construction over long distances with short delivery times.

Our company offers the "No Flame Piping Joint (Lokring) Method." As a piping joint for piping construction in power plants, it ensures reliability comparable to welded joints without the use of flames. According to this method, there is no need to arrange for specialized welders, non-destructive inspectors, or fire watch personnel, contributing to significant cost reductions. Additionally, compared to welding, there are fewer constraints related to construction conditions such as weather and installation space, which can also lead to a reduction in construction time. 【Features】 ■ Piping construction without the use of flames (no fire risk) ■ Highly reliable connections equivalent to welding ■ Approximately 1/10 of the work time compared to welding (time reduction) ■ Permanent connections that require no maintenance after installation ■ No need for protection against bad weather or flames (cost reduction) *For more details, please refer to the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Leave the cost reduction project to us! [Lighting poles and adapters]

We will meet customer requests! Leave bending processing and advanced welding technology to Kanda Industrial.

At Kanda Industrial, each factory collaborates to enable consistent processing of products, allowing us to meet customer demands such as short delivery times, small lots, and low costs. There are various examples, including lighting poles for theme parks and convenience stores, as well as adapters for used car dealerships and those from ESCO projects. Please feel free to consult us when needed. 【Mass Production Examples】 ■ Lighting poles for theme parks ■ Lighting poles for convenience stores ■ Adapters for used car dealerships ■ Adapters from ESCO projects *For more details, please refer to the PDF materials or feel free to contact us.

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Preserved Tree & Plants "Verdissimo"【Ornamental Plants】

Europe's non-fading houseplants!

"Verdissimo" is a natural plant that requires no watering, made from preserved flowers. To maintain its beauty and freshness without the need for water or sunlight, it undergoes a preservation process using 100% natural materials, where the preservation solution replaces the sap and water within the plant, effectively creating a natural still life. Processed flowers and plants remain beautiful for months without the need for watering, making them virtually maintenance-free. Interior decorations with plant elements provide a natural touch and sensory enjoyment in both private and public spaces. Please feel free to contact us if you have any inquiries. 【Features】 ■ No watering, repotting, or maintenance required ■ Enjoy a healing space that feels like being in nature, thanks to natural materials ■ Stylish design elevates your living environment ■ Hygienic as it does not use soil or water *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Finishing Method "Purecrete Method"

"Safety" and "beauty," for a longer time. Super short delivery times and reasonable pricing finishing methods!

The "Purecrete Method" is the ultimate finishing technique for decorative exposed concrete that allows rebar to recover and retain alkalinity, preventing deterioration. It protects concrete from smoke and mold, and through pattern drawing that utilizes traditional designs, it achieves long-lasting aesthetic beauty. To maintain the safety and beauty of decorative exposed concrete for as long as possible, please make use of this method. 【Features】 ■ Perfect alkalinity recovery for aged concrete with spalling ■ Prevention of carbonation, self-cleaning, and mold and algae resistance ■ Easily achieve the highest quality decorative exposed concrete through pattern drawing *For more details, please download the PDF or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dioxin removal Chemical DSR method

We will carry out dioxin removal with a safe and reliable management manual!

Our company has obtained certification for asbestos removal methods from the Japan Architecture Center and, based on our extensive track record of safe removal work, has been engaged in dioxin removal projects for large, medium, and small incinerators since 2002. According to the Ministry of Health, Labour and Welfare notification No. 401 (April 25, 2001), it is necessary to dismantle waste incineration facilities with a combustion area of 0.5 m² or more or a processing capacity of 50 kg/hr or more. The "Chemical DSR Method" conducts dioxin removal based on our achievements in asbestos removal, utilizing a safe and reliable management manual. 【Flow of Decontamination Work】 ■ Preliminary Investigation ■ Submission of Construction Plan ■ Implementation of Special Education for Workers and Other Occupational Health Education ■ Preparation Before Removal of Contaminated Materials ■ Decontamination of Incinerators ■ Completion of Decontamination ■ Dismantling Work *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Toray's rooftop greening method using the resilient "evergreen giraffe grass" that withstands environmental changes.

For those who don't want to fail at rooftop greening. We achieve drought-resistant rooftop greening using "evergreen giraffe grass." Easy to install and requires no maintenance!

The "Fujita Rooftop Greening System" utilizes "evergreen sedum" that maintains greenery year-round and employs a zipper bag made of high-strength, high-density polyester non-woven fabric called "Aksutamanto," contributing to solutions for challenges related to rooftop greening. Sedum is resilient to dryness and temperature changes, adapting to Japan's unique climate conditions. It requires no maintenance (such as watering or weed control), and installation is easy, making rooftop greening cost-effective. 【This is suitable for the following concerns】 ■ Plants for rooftop greening are dying... ■ Weeds are becoming a problem... ■ Soil is washing away and clogging the drains... ■ Considering rooftop greening but want to avoid failure... *For detailed specifications, please download the PDF. Feel free to consult us for more information.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solar Power Generation Panel Installation Method "TIS-S System"

Installation method for solar panels that can be applied to barren land!

Our company offers the solar panel installation method "TIS·S System" for installing solar power panels on soft ground such as peatlands, which are deemed unsuitable for installation, as well as on uneven terrain, in a simple and environmentally friendly manner. By arranging the panel rows diagonally and creating gaps between them, we achieve an organic feel and better integration with the landscape. Additionally, since the installation can be done without heavy machinery even on soft ground, the entire system can be easily relocated. Please feel free to contact us if you have any inquiries. 【Related System】 ■ TIS·S Type Arup *For more details, please download the PDF or contact us.

  • Solar power generator
  • Machinery and equipment installation/dismantling/relocation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Photography Example] Maruken Kogyo Co., Ltd. <MRT Method Catalog>

Example of a construction method catalog with A4 vertical pamphlet x 6 pages and A4 horizontal web download x 6 pages!

We would like to introduce a case where we were responsible for the photography, design, printing orders, and production process management of the MRT construction method catalog for Maruken Kogyo. We adjusted the schedule as needed for photography at various construction sites, heavy machinery, parts, and worker image cuts. We flexibly responded to the client's needs regarding budget and content accuracy. We thoroughly addressed the client's needs and reflected the preferences of the responsible person in the details of the design. 【Case Overview】 ■ Purpose: Construction method catalog (A4 vertical brochure × 6 pages, A4 horizontal for web download × 6 pages) ■ Photography Content: Adjusted the schedule as needed for photography at various construction sites, heavy machinery, parts, and worker image cuts ■ Production: Flexibly responded to the client's needs regarding budget and content accuracy *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Bus Reform Comprehensive Catalog Vol. 3

Introducing "Eco Bus Reform," which allows for construction in a short period and significant cost reductions!

This catalog features the new construction method "Eco Bath Reform," which takes into consideration both the environment and people. It is ideal for hotel bathrooms, nursing facilities, public restrooms, and office interiors! In addition to introducing various construction methods such as "Nuri Reform" and "Panel Reform," we also present various repairs including "FRP Lining (crack repair)" and "Wall Rust Baseboard Repair (lower wall bulging)." "Eco Bath Reform" not only creates a comfortable living environment but also provides a clean and pleasant bathroom space at a low cost. Please feel free to download and take a look. [Contents] ■ Introduction of various construction methods ■ Various repairs ■ SET plan introduction/estimate request ■ Q&A, maintenance methods, inquiries ■ Company profile *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration