We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 483 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 24, 2025~Jan 20, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 24, 2025~Jan 20, 2026
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. 双和化学産業株式会社 Hyogo//others
  3. コスモシステム Tokyo//Industrial Machinery
  4. 4 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry
  5. 5 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures

Construction method Product ranking

Last Updated: Aggregation Period:Dec 24, 2025~Jan 20, 2026
This ranking is based on the number of page views on our site.

  1. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  2. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  3. FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition 双和化学産業株式会社
  4. 4 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト
  5. 5 Piping Method "Just Flare JF-350/JF-500" 日商テクノ

Construction method Product List

1051~1065 item / All 1397 items

Displayed results

Floating repair method "Press Down Grout Method"

Repairs can be made reliably and safely without compromising the design! It is possible to accommodate thin finish thickness for floating injection.

The "Press Down Grout Method" is a suitable technique for repairing floating issues in 50 two-tile direct finish where injection is difficult. By using an aluminum frame to hold it down, it can accommodate thin floating injections. 【Features】 ■ Reliable and safe repairs without compromising design ■ Ideal for repairing floating issues in 50 two-tile direct finishes ■ Accommodates thin floating injections *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transparent resin tile pin fixation and peeling prevention method "JK Cerider Method"

High waterproofing and blocking properties unique to acrylic resin! Prevents deterioration of exterior walls and contributes to the longevity of buildings.

The "JK Cerider Method" is a tile fall prevention technique that reinforces tiled exterior walls using a special acrylic resin called "JK Cerider," which contains short fibers, and special anchor pins. Thanks to the high waterproofing and barrier properties of the acrylic resin, it prevents the deterioration of exterior walls and contributes to the longevity of the building. The coating is colorless and transparent, preserving the luxurious texture of the tile finish, allowing it to remain beautiful for a long time. 【Features】 ■ Excellent tile fall prevention function ■ Improved durability ■ Colorless and transparent finish *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

AGF-Me (Metal eco) construction method

It is possible to separate and recover steel pipes and injection materials during tunnel excavation! A construction method that allows for resource utilization as separated industrial waste.

The "AGF-Me (Metal eco) method" is a patented method (Patent No. 3882118) for a non-widening long steel pipe advance construction technique. It features vertical slits in the terminal reinforcement steel pipes of the cutting section during tunnel excavation with non-widening support, allowing for the separate recovery of the steel pipes and injected materials during excavation. This method eliminates unnecessary mixed waste and enables resource utilization as sorted waste. 【Features】 ■ Patent No. 3882118 obtained ■ Structure allows for separate recovery of steel pipes and injected materials during excavation ■ Eliminates unnecessary mixed waste and enables resource utilization as sorted waste *For more details, please refer to the PDF document or feel free to contact us.

  • Other work tools
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hybrid Fore-Piling"

Enhance blade stability with a combined pattern of "long-length fore piling" and "long-length mirror reinforcement work."

"Hybrid Fore-Piling" is a construction method that is expected to have a higher effect in suppressing the plasticization of surrounding ground. By placing small-diameter steel pipes from the upper part of the mirror section towards the top, it is possible to reinforce not only the "top part" that is reinforced by conventional fore-piling but also the "upper mirror ground" which has a high risk of collapse. [Features] - By increasing the overlap section, it can reinforce the surrounding ground over a wide area, including the mirror section. - Compared to conventional fore-piling, it has a higher effect in suppressing the plasticization of the ground. - By using small-diameter steel pipes (φ76.3), it is more economical than conventional methods. *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Simple Repair Method for Guardrail Posts: "GPR Method"

No need for downtime! We have developed a method to repair supports through partial construction.

The "GPR method" is a groundbreaking repair technique that applies the technology of steel pipe expansion-type lock bolts to repair the corroded parts of guardrail posts. It features simple work that does not require exploratory digging and does not need special construction techniques. Additionally, the construction equipment is compact, and the work time per location is extremely high at just 10 to 20 minutes. [Features] ■ Adoption of highly corrosion-resistant coated materials ■ Easy construction that does not require special construction techniques ■ Instant repair from the inside of the post using expansion steel pipes ■ Speedy construction ■ No exploratory digging required *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shear Reinforcement Method "RMA Method"

Construction technology certification acquisition method! No need for mortar mixing or installation of injection holes on site!

The "RMA Method" is a shear reinforcement method that allows for reinforcement without encroaching on the inner cross-section of continuous walls. It employs capsules containing premixed mortar as a bonding agent. This method enables construction using impact on long or thick reinforcement bars, making it a post-construction technique. Since there is no need for mortar mixing or the installation of injection holes on-site, special management is unnecessary. Reinforcement is carried out only for the insufficient shear strength, allowing for a transition from shear failure to bending failure. 【Features】 ■ Drilling can be done with a small diameter and only once ■ No mixing on-site, maintaining consistent quality ■ Simple product composition and construction method, reducing construction time ■ Minimal interference with existing structural reinforcement, allowing for reduced re-drilling ■ A method that does not use large or specialized machinery, saving space *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gainamesh Method Type D [Falling Prevention Measures + Water Leakage Prevention Work (Water Guide Work)]

Not only does it install a special sheet with anchors to guide water, but it also simultaneously prevents the shedding of concrete fragments.

■NETIS Registered Registration Number: KK-240031 The "Gainamesh Method Type D" is a construction method that prevents water leakage and spalling from concrete structures. This method aims to prevent dripping of water leakage and spalling of concrete pieces in concrete structures, ensuring the safety of users of the structure. The rigidity of the shape-retaining band allows for easy installation on the curved surfaces of tunnels. Installation is quick as it only requires driving in anchors. 【Features】 ■ Effectively prevents water leakage and spalling from concrete structures ■ Easy to install, allowing for quick construction ■ Weather-resistant and alkali-resistant ■ Excellent durability with stainless steel anchors ■ Easy to remove and install, facilitating maintenance 【NETIS Number】 KK-240031 *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Gainamesh method [fall prevention construction]

It has excellent durability, conforms to the curved surfaces of tunnels, and prevents the spalling of concrete fragments.

■NETIS Registered, Registration Number: KK-240048 ■High-strength aramid fibers reliably prevent the spalling of concrete fragments. This construction method aims to prevent the spalling of concrete fragments in concrete structures using a GFRP shape-retaining body and a mesh of high-strength aramid fibers, ensuring the safety of users of the structure. *This meets the quality standards compatible with NEXCO tunnel construction management guidelines. 【Features】 The mesh part allows for visual inspection after installation. By using high-strength aramid, there is less alkali deterioration due to groundwater, and it does not conduct electricity, making it suitable for installation in railway-related tunnels. Installation is quick and easy, requiring only the driving of strike anchors. Additionally, if any deformation is observed after installation, maintenance such as removing and reattaching the fixing screws can be easily performed. By using a lock nut with a friction ring (leaf spring), it provides a function to prevent loosening, enhancing safety. This lock nut has passed NAS standards, which are specified as verification items during material approval by NEXCO.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SR-LG construction method

"Long-distance pumping" backfill cavity filling method using plastic grout.

* NETIS Registration Number: HK-120037-VR * Quality standards that comply with the design and construction guidelines for backfill cavity injection in sheet pile method tunnels at NEXCO * Capable of long-distance pumping (Record: 4,000m) The plastic grout material is non-air-based, allowing for long-distance pumping. * Construction possible at external plants Main materials and plasticizing materials (liquid) can be pumped from external plants, and the main material does not harden alone for long periods, resulting in fewer troubles during pumping. * Environmentally friendly using recycled materials Utilizing fly ash contributes to effective resource utilization. * Ensuring high quality With high underwater non-separation, work in flowing water is easy, making it an optimal method for sites with groundwater, standing water, or flowing water. * Working environment The installation of plants externally and the liquid nature of the plastic material result in minimal dust generation in the working environment inside the structure.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Whether it's bamboo joints or screw joints! We propose the best construction methods for rebar work that meet your needs.

Kanto Day B Steel Co., Ltd. primarily engages in intermediary business related to the sale of rebar, associated processed products, and ancillary goods.

Kanto Devers Steel Co., Ltd. was established on October 1, 2019, in collaboration with Asahi Kogyo Co., Ltd. 【Products Offered】 ■ Joint 'EG Series' A highly reliable joint that does not require grout, simply tightened with a torque wrench. ■ Threaded Rebar 'Nejiacon' Designed for joining rebar, it helps shorten construction time and is less affected by weather! *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Weed prevention method

Significant reduction in maintenance costs for weeding operations! It is also possible to hinder the growth of weeds.

The "Weed Prevention Method" features a protrusion structure on concrete products that interlocks with paving materials, preventing gaps and making it difficult for weeds to grow. By adopting this method, the landscape improves, contributing to better road environments and a reduction in traffic accidents. Moreover, the construction feasibility and costs during the design phase are comparable to conventional products, and since no maintenance is required later, significant reductions in maintenance costs are possible, making it very economical. 【Features】 ■ Significant reduction in maintenance costs for weeding and other tasks ■ Improved landscape ■ Contributes to better road environments and a decrease in traffic accidents ■ Construction feasibility and costs during the design phase are comparable to conventional products ■ No maintenance required later *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Uneven Surface Adaptation Drainage Method "Seal Drain"

Water leakage prevention from joints and cracks in concrete structures / For water stopping in central reservation!

"Seal Drain" is a water leakage treatment method (waterproofing material) that can handle uneven concrete and mortar spray surfaces. It uses a soft silicone seal that is flame-retardant and resistant to weather and cold. The soft sheet has excellent adhesion and is compatible with all materials, including concrete and metal. 【Features】 ■ Capable of treating water leakage from mortar spray surfaces ■ Uses a flame-retardant, weather-resistant, and cold-resistant soft silicone seal ■ The soft sheet has excellent adhesion and is compatible with all materials, including concrete and metal ■ Made of superior flexible material *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FRP Bridge Vacuum Infusion Method

A bridge that is resistant to salt damage, lightweight, high-strength, and does not decay.

Vacuum Infusion The entire fiberglass mat layered on the mold is covered with a film to seal it, and the air from the fiberglass layer is removed to create a complete vacuum state. Next, using the power of the vacuum, polyester resin is injected into the fiberglass layer, ensuring it spreads evenly throughout, resulting in a uniform and strong FRP laminate. This manufacturing method is referred to as "Vacuum Infusion (VI)." This technique is also used in the production of large blades for wind turbines and the hulls of yachts. Laminates produced using this method are used in the structural components of FRP bridges. The high fiberglass content allows for lightweight and strong laminates, and there is the advantage of being able to produce very large laminate sheets. The shape of the mold can be freely designed as either flat or curved, enabling the creation of elegantly shaped bridge beams.

  • Composite Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Pin Foundation Construction Example] Locations where installation is difficult with standard foundations on steep slopes.

Simple foundation construction method for NETIS registration! We will introduce examples of construction in locations where conventional foundations are difficult to install on steep slopes.

Introducing examples of the pin foundation method in locations where it is difficult to install a standard foundation on steep slopes. In typical concrete foundations, the weight can lead to sliding issues on steep slopes, resulting in large-scale foundation work. However, with the pin foundation method, it is possible to create a deep embedment by using longer driven pins, allowing for effective foundations to be easily constructed even on steep slopes. 【Case Study】 ■ Nishikaibashi Park (Nagasaki Prefecture) ■ Structure: Effective width 2.0m, column pitch 1.5m to 2.0m ■ Materials Used ・Railing: Ipe wood, Jatoba wood ・Decking: Ipe wood ・Structural materials: Aluminum alloy, Angelim wood, Ipe wood ■ Foundation Type: DP-M For more details, please refer to the catalog or feel free to contact us.

  • others
  • Composite Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration