We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Construction method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Construction method Product List and Ranking from 482 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

  1. フルサト工業 建材開発部 Osaka//Building materials, supplies and fixtures
  2. コスモシステム Tokyo//Industrial Machinery
  3. 双和化学産業株式会社 Hyogo//others
  4. 4 メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡 Tokyo//Building materials, supplies and fixtures
  5. 5 富士ファーマナイト Kanagawa//Electricity, Gas and Water Industry

Construction method Product ranking

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

  1. The "Infrared Welding Machine Series" that changes plastic welding methods. コスモシステム
  2. Corner steel pipe column on-site no-welding joint method 'Column Coupler' フルサト工業 建材開発部
  3. FRP Waterproofing Polyroof PP Method Series Rooftop and Parking Lot Waterproofing Methods Edition 双和化学産業株式会社
  4. 4 Stop leaks from the valve gland! "Valve Gland Method" 富士ファーマナイト
  5. 5 Rapid-curing polyurethane spray waterproofing method "Rim Spray"

Construction method Product List

1186~1200 item / All 1397 items

Displayed results

OS Cool Method

Revitalize aging roofs and walls, improving heat insulation and durability! Is your old roof being left as it is?

This technology is a painting method that repairs and regenerates old roofs and walls, unlike replacing or covering them. With excellent heat insulation and thermal insulation effects, the working environment becomes comfortable. It is possible to significantly reduce air conditioning and other cooling costs. Additionally, it regenerates the strength of the roof and improves durability. We have received numerous new requests from satisfied customers after the work has been completed. 【Features】 ■ Repairs and regenerates old roofs and walls as they are ■ Comfortable working environment due to excellent heat insulation and thermal insulation effects ■ Significant reduction in air conditioning and other cooling costs ■ Regenerates the strength of the roof and improves durability ■ Reduces total costs, including maintenance *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cover construction method

During construction, operations continue as usual and efficiently! You can achieve a beauty akin to a newly built structure.

The "cover construction method" is a technology that can significantly extend the lifespan of roofs. In addition to waterproofing effects and heat insulation effects due to increased solar reflectance, it is also possible to achieve insulation effects by using insulation materials. Furthermore, it results in an appearance similar to that of a new building. Additionally, normal operations can continue during construction, making it efficient. We also handle other renovation work, so please feel free to consult with us. 【Features】 ■ Measures against leaks, improved heat insulation, and thermal insulation ■ Enhanced durability ■ Improved aesthetics ■ Significant increase in roof lifespan ■ 10-year material warranty *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Post-installation method for finished lightweight steel frame walls 'Nissho Construction Method'

Solve the problems of conventional construction methods all at once! Door frame installation is possible after the wall surface is finished.

The "Nissho Construction Method" involves finishing lightweight steel frame walls first, followed by the installation of fixtures, allowing for reduced overlap of work between different contractors. This method allows for the installation of fixtures after the lightweight steel frame walls have been finished. The variation in wall thickness (stud and board specifications) is accommodated with a frame, and the basic frame is produced and managed (quality control) as a ready-made product. Additionally, a screw fastening method is now possible, eliminating fire risks without welding, making it effective for renovation work. 【Features】 ■ Division: Basic frames of the same specifications can be produced in advance ■ Installation can be completed all at once after wall construction ■ Speedy due to modularization ■ Good loading efficiency ■ Adaptable to the times with web ordering available *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

L-RTM method

Significant reduction in mold costs compared to molds! Since preform machines are not required, capital investment is inexpensive.

Our company employs the "L-RTM method." This molding method involves laying a substrate on the CAV type (lower mold), covering it with the COR type (upper mold), creating a vacuum state to clamp the mold, and utilizing the suction power of the vacuum to inject resin. The term "Light" used here indicates a simplified and quantitative meaning, characterized by the ability to produce using simple molds and lightweight equipment, without the need for traditional large-scale mold structures and gun equipment. A wide variety of materials can be selected. 【Features】 ■ Can be operated by a small number of people ■ Significant reduction in mold production time ■ Substantial reduction in mold costs compared to conventional molds ■ Does not require skilled techniques ■ Shorter molding cycles compared to hand lay-up, allowing for reduced molding costs *For more details, please refer to the PDF document or feel free to contact us.

  • Company:ZERO
  • Price:Other
  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New cassette construction method "D-Hole (Docking Hole)"

Achieving the shortest construction period of just one day with a completely custom-made new cassette method, without any on-site assembly!

In recent years, there have been numerous road subsidence incidents across the country believed to be caused by concrete corrosion due to hydrogen sulfide, and this trend is expected to increase further in the future. In this renovation project, the newly developed 'D-Hole' (Docking Hole), based on a new concept, is a new cassette construction method that meets the requirements for chemical resistance, self-supporting load capacity, and impact resistance, made from PVFR material. It is a completely custom-made product that achieves a minimum construction period of just one day without any on-site assembly. 【Features】 ■ Material: PVFR manhole ■ Method: Installed inside existing manholes ■ Construction period: Minimum of 1 day ■ Construction cost: Reduced costs due to minimal civil engineering work ■ Traffic: Short regulation time *For more details, please refer to the PDF document or feel free to contact us.

  • Other water treatment equipment
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the Top 3 Multi-Purpose Trolley Series

Multipurpose nesting cart - makes loading and unloading easy - useful for long items. We have a variety of product lineups to meet your needs!

We offer a variety of products tailored to different uses and needs. 【VC-602N】Excels in various scenes!       Multipurpose nesting cart 【VC-602DA】Convenient for loading long items.        Separate handle type cart 【STM-2】Makes loading and unloading a breeze!      Two-tier cart <Common Features> ・With stopper ・Made of hard polypropylene, excellent durability ・Mesh structure that resists dust accumulation *Please check the catalog photos for more details.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CB method

It can be easily done even in narrow spaces! We will introduce the standard method for welding reinforced concrete joints.

The "CB Method" refers to enclosure welding using ceramic backing materials. After the welding operation, the backing can be removed, allowing for visual inspection of the weld appearance. This method was jointly developed by Osaka Prefecture and Aichi Institute of Technology, focusing on stable quality. It is used in various construction projects, regardless of whether they are in architecture or civil engineering, and particularly for large diameters (D35 and above), it has achieved approximately 500,000 instances per year. 【Features】 ■ High reliability of joint performance ■ Good workability of joint shape ■ Reliable quality control ■ Speedy welding operations ■ Expanding possibilities for construction methods ■ Market area: Hokuriku only *For more details, please refer to the PDF document or feel free to contact us.

  • Processing Contract
  • Welding Machine
  • Pipe Fittings

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[User Development Case] Quality Assurance System for Precision Lines

Visualize production information to enable individual product management! With the quality assurance system, you can instantly grasp valuable information.

This is a case study of a quality assurance system that combines both production management and quality management functions, including process management for precision line assembly/inspection, sub-lines (intermediate seating and grease), and packaging processes. ■Instantly grasp valuable information■ - Visualization with dashboards! You can intuitively understand information such as trend values. - Check past trouble information! This leads to an increase in good product rates. - Individual product traceability is possible! Product quality can be reliably guaranteed. *For more details, please contact us or download the catalog.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hybrid construction method "TORNADO"

We have made it possible to clean the drainage pipes of high-rise buildings and apartments, which was previously impossible!

The "TORNADO" rotates the cleaning nozzle along the pipe wall, allowing for a fast cleaning speed and uniform cleaning across the entire surface. Since it uses water (high-pressure water) for cleaning, there are no concerns about dust or noise, making it environmentally friendly. Instead of spending a huge amount on replacement construction, it is much more cost-effective to continue using your existing shared piping by cleaning it every 1 to 2 years. 【Features】 ■ The cleaning nozzle rotates along the pipe wall for cleaning ■ Fast cleaning speed, able to clean uniformly across the entire surface ■ Cleans using only water, making it low-cost and environmentally friendly ■ Can pass through approximately 30 bends ■ Suitable for cleaning oil residues with hot water from a high-pressure pump *For more details, please refer to the PDF document or feel free to contact us.

  • High pressure cleaner
  • Other cleaning machines

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Enclosed welding method "JCe-MT method"

Work can be easily carried out even in narrow workspaces, and the backing material can be removed after welding is completed!

The "JCe-MT method" is a jointing technique that uses a ceramic backing material in a specified jig to continuously fill the groove with welding wire using a semi-automatic welding machine for two rebar pieces that are to be joined. It has the advantage of allowing easy visual inspection and ultrasonic testing, and in recent years, it has gained attention as a method capable of joining fixed rebars, which is impossible with gas pressure welding, in applications such as PC construction for high-rise condominiums and large-diameter rebars in civil engineering. [Features] ■ Certified by excellent welding construction companies and Class A joint welding construction companies. *For more details, please feel free to contact us.

  • Processing Contract

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flare welding

Providing technology for seismic reinforcement work and bridge construction! We have numerous achievements.

"Flare welding" is a method of joining overlapping rebar sections using arc welding, and it is used in various construction projects. Our company provides technology for seismic reinforcement work and bridge construction, among others. We also have numerous achievements in flare welding for the reinforcement bars of steel pipe piles. Welding with "J-type grooves (J-BAR)" is also seeing an increase in construction achievements. [Features] - Joins overlapping rebar sections using arc welding - Used in various construction projects *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration