[Construction Example] Ancillary Work Well Point
A method used when it is anticipated that drainage by well pumps alone will be difficult!
The "Well Point Method" involves attaching well points to the ends of pipes, injecting jet water, and driving numerous points into the ground around the excavation site to lower the groundwater level by pumping water from the pipes installed underground using vacuum power. It is a type of well construction method used when it is anticipated that drainage by well pumps alone will be difficult, and it is widely used for laying underground pipes, installing septic tanks, countermeasures against ground liquefaction, and improving soft ground. This is a ground improvement method used when conducting excavation work in areas with spring water. 【Features】 - Used when it is anticipated that drainage by well pumps alone will be difficult. - Widely used as an improvement method for laying underground pipes and installing septic tanks. - Used when conducting excavation work in areas with spring water. *For more details, please refer to the related link page or feel free to contact us.
- Company:名西建材
- Price:Other