No need for boilers with drainage heat recovery! Energy-saving case study of a food factory using heat exchangers.
Simultaneous realization of warm cooling water and backup cooling with well water reduces the burden on chillers and boilers, contributing to energy savings and cost reduction!
Our company sells geothermal materials and equipment, regardless of whether they are domestic or imported. In particular, the polyethylene sheet-type heat exchange unit product "G-HEX" was developed through a NEDO project. It is a high-cost performance heat exchanger that utilizes thermal energy from flowing water and does not release waste heat into the atmosphere. 【Do you have any of these concerns in your food factory?】 ■ High costs for temperature adjustment (heating) of wastewater ■ Cooling energy required for well water cooling ■ Poor energy efficiency of boilers and chillers, leading to high running costs \ For detailed examples of unused heat recovery, please check "Download Catalog" /
- Company:ジオシステム
- Price:Other