[Construction Example] Laundry Factory: Filling Work for Loose Ground Under Machinery Foundation
Injecting urethane under the mechanical foundation to resolve ground looseness! Solved in a short construction period of one day.
We would like to introduce a case of "filling work for loosening under the machine foundation and urethane filling work inside the pit" conducted at a laundry factory in Kanagawa Prefecture. Due to the loosening of the ground under the machine foundation, the dewatering machine tilted. Therefore, we performed filling work to inject urethane under the machine foundation to resolve the ground loosening, and also carried out work to fill urethane inside the pit where the dewatering machine is installed to prevent further subsidence. After the construction, we conducted a filling confirmation using a CCD camera and confirmed that the urethane was evenly filled under the machine foundation. [Case Overview] ■ Construction Area: 10m2 ■ Construction Period: 1 day ■ Area: Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other