[Construction Example] Laundry Factory: Filling Work for Loose Ground Under Machinery Foundation
Injecting urethane under the mechanical foundation to resolve ground looseness! Solved in a short construction period of one day.
We would like to introduce a case of "filling work for loosening under the machine foundation and urethane filling work inside the pit" conducted at a laundry factory in Kanagawa Prefecture. Due to the loosening of the ground under the machine foundation, the dewatering machine tilted. Therefore, we performed filling work to inject urethane under the machine foundation to resolve the ground loosening, and also carried out work to fill urethane inside the pit where the dewatering machine is installed to prevent further subsidence. After the construction, we conducted a filling confirmation using a CCD camera and confirmed that the urethane was evenly filled under the machine foundation. [Case Overview] ■ Construction Area: 10m2 ■ Construction Period: 1 day ■ Area: Kanagawa Prefecture *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.mono.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction work to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using a completely non-fluorinated urethane resin and our unique "Upcon Method" with small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure, such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration of the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. We provide total support from on-site surveys nationwide to repair planning and construction, all handled responsibly by our in-house staff. Our specialized and experienced staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.