[Case Study] TOSEI Corporation
Achieving both "speedy implementation" and "high functionality"! Implementation realized in just 100 days.
We would like to introduce a case study on the implementation of the core business solution "FutureStage" for the manufacturing and distribution industry at TOSEI Corporation. There was a challenge of having very little time and the urgent need to implement the system. By leveraging the rich standard features of the package, we achieved system implementation in just 100 days. 【Case Overview】 ■Challenges - We wanted to add and modify functions tailored to our business even after the system implementation. - To improve quality control, we wanted to perform lot tracing. ■Results - Flexible addition and modification of functions became possible even after the system implementation. - Detailed tracing based on shipping, product, material, and component information was realized. *For more details, please refer to the PDF document or feel free to contact us.
- Company:日立システムズ
- Price:Other