We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Management System.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Management System×DigitWorks - List of Manufacturers, Suppliers, Companies and Products

Management System Product List

16~22 item / All 22 items

Displayed results

[i-PROW Case Study] Matsuyama Giken Co., Ltd. Heat Treatment Division

From order receipt and production to shipping, everything can be managed consistently! A case where inventory checks are completed in about half a day.

We would like to introduce a case study on the implementation of the production management system "i-PROW" at Matsuyama Giken Co., Ltd., Heat Treatment Division. Before the implementation of the old system, the task of printing lists on paper and matching them with actual items took two people an entire day and still was not completed. Since the introduction of this system, we now have a clear list of "orders, production, and shipments," which allows us to easily understand the progress of processes, and inventory checks can now be done with one-third of the effort. [Case Overview] ■ Before Implementation - The old system used two separate systems, making it very difficult to link them together. ■ After Implementation - Inventory checks can now be done on-screen, reducing the time taken from a day and a half to about half a day. *For more details, please refer to the PDF document or feel free to contact us.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[i-PROW Case Study] Matsuyama Giken Co., Ltd. Vacuum Furnace Division

The workload has been reduced to one-tenth! The system implementation was smooth thanks to the comprehensive support system.

We would like to introduce a case study of the implementation of the production management system "i-PROW" at Matsuyama Giken Co., Ltd. Vacuum Furnace Division. Before the implementation of the old system, data entry was primarily done manually, which took a significant amount of time. After the implementation, data entry became much easier with barcode scanning, reducing the time spent to one-tenth. 【Case Overview】 ■ Before Implementation - All data entry was done by hand, with one product and one actual item recorded at a time. ■ After Implementation - With the introduction of barcode scanning, the time required for data entry was improved to one-tenth.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Kyowa Seiko Co., Ltd. - The price of i-PROW was the deciding factor.

i-PROW offers attractive customization flexibility and contributes to improving awareness of delivery deadlines.

We would like to introduce a case study of the implementation of the production management system "i-PROW" at Kyowa Seiko Co., Ltd. Before the introduction of i-PROW, there was a system in place for parts processing, but it seems that utilizing the information from the system was not being done effectively. After the implementation, the way internal notifications were handled changed. 【Case Overview】 ■ Before Implementation - As of 2014, planning was done manually, and input tasks took more than half a day. ■ After Implementation - By simply inputting internal notification information, it is reflected in the system, allowing for planning and seamless work instructions.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[i-PROW Implementation Case] Tohoku Special Steel Co., Ltd.

A case where the cost of updating the old system allowed for a switch to a new system with additional features!

We would like to introduce a case where Tohoku Special Steel Co., Ltd., which manufactures parts used in semiconductor manufacturing equipment, has implemented our production management system "i-PROW." The company was struggling with the aging of their existing system and the high costs of updates and maintenance. After implementation, we received feedback stating, "We are now able to generate inspection record forms and other documents from this product, allowing us to achieve paperless operations in various tasks." 【Case Overview】 ■ Challenges - Aging of the existing system and high costs of updates and maintenance ■ Benefits - Achieved paperless operations - Enabled centralized management of inventory and costs - Allowed changes to the validity period of passwords and the department name printed on forms *For more details, please refer to the related links or feel free to contact us.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[i-PROW Implementation Case] Yamato Electec Co., Ltd.

It's great that it's multifunctional and has unlimited device usage (license count)!

We would like to introduce a case where our production management system "i-PROW" was implemented at Yamato Eletech Co., Ltd., which specializes in the contracted design, development, and manufacturing of electronic devices. The company faced the challenge of their existing system not aligning with the company's policies, resulting in only a portion of its functions being utilized. After implementation, we received feedback stating, "We have achieved rapid visibility of business processes in all areas, and we can now create meeting materials in a short amount of time." 【Case Overview】 ■ Challenges - The existing system did not align with the company's policies, and only a portion of its functions were being used. ■ Effects - The company is now able to manage business progress in a more structured manner. - Rapid visibility of business processes in all areas has been achieved. - Meeting materials can now be created in a short amount of time. *For more details, please refer to the related links or feel free to contact us.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[i-PROW Implementation Case] Goichi Seiko Co., Ltd.

The permission settings for each logged-in user are convenient, and the screen is easy to read!

We would like to introduce a case where our production management system "i-PROW" was implemented at Goichi Seiko Co., Ltd., which specializes in hydraulic valve component processing and automotive parts processing. At the company, there was a lot of data entry work, leading to a heavy workload for office staff and occasional human errors. After the implementation, data automatically flows from order receipt, resulting in a dramatic reduction in human errors, which has been met with positive feedback. 【Case Overview】 ■ Challenges - Inability to confirm the status of inventory arrivals and withdrawals, leading to competition for stock - High workload for office staff, resulting in human errors ■ Effects - Data automatically flows from order receipt, significantly reducing human errors - Data entry tasks for office staff have been greatly reduced, decreasing their workload *For more details, please refer to the related links or feel free to contact us.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[i-PROERP3 Implementation Case] Iiyama Seiki Co., Ltd.

A "visualization of the factory" system is needed, and i-PROERP3 has been implemented!

We would like to introduce a case where Iiyama Seiki Co., Ltd., which manufactures hydraulic valve components, implemented our production management system "i-PROERP3." The company transitioned to a model of many varieties and small quantities with short delivery times, leading to increased management workload and various losses, making it impossible to cope with the previous partial systemization. After implementation, they were able to respond quickly to delivery delays and significantly reduce product and material inventory, as well as address the challenges of management workload and reduce work losses and waste. 【Case Overview】 ■Challenges - Transitioned to many varieties and small quantities with short delivery times, resulting in increased management workload and various losses - Unable to cope with partial systemization ■Effects - Quick response to delivery delays through "visualization of the factory" - Reduction of management workload and work losses and waste, which were previously challenges *For more details, please refer to the related links or feel free to contact us.

  • Production Management System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration