We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Materials.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Materials(box) - List of Manufacturers, Suppliers, Companies and Products

Materials Product List

1~2 item / All 2 items

Displayed results

[Super Sol Construction Case Study] Disaster Recovery Work - BOX Culvert Backfill Case Study

This is a case study of disaster recovery and ground improvement work on national disaster prevention roads.

We will introduce a case study of the construction of the artificial lightweight material "Super Sol," made from crushed and sintered waste glass, used in disaster recovery work and the backfilling of box culverts. This is related to the reconstruction efforts following the Great East Japan Earthquake. To reduce the load on the box culvert due to road pavement improvements, we aimed to lighten the backfill. 【Construction Case Study】 ○ Project Details: National Disaster No. 23-71-506-0-008 Road (North 5, North 8) Disaster recovery and ground improvement work ○ Use Category: Civil Engineering / Structural Protection / Existing Structures ○ Client: Ibaraki Prefecture ○ Construction Location: Naka District, Ibaraki Prefecture ○ Required Performance: Lightweight and load reduction For more details, please contact us or download the catalog.

  • others
  • Glass

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Super Sol Disaster Recovery Work

There are case studies of construction work for disaster recovery! No curing period is required, allowing for a shortened construction time.

We would like to introduce a case of construction work for disaster recovery using Super Sol conducted by our company. To proceed with construction quickly, it is essential to ensure the timely delivery of materials, transportation to the site, workability, material costs, and stable supply of materials. "Super Sol" can be combined with crushed stone (such as excavated soil) to reduce costs. It can be constructed using standard earthwork procedures, contributing to a shortened construction period. We have examples of disaster recovery work, tsunami evacuation road widening projects, and mixed lightweight soil and sandwich-type construction. Please take a look at our catalog. 【Benefits】 ■ Shortened construction period (no curing time required) ■ There are case studies of construction in disaster recovery work ■ Cost reduction is possible by combining with crushed stone (such as excavated soil) ■ Can be constructed using standard earthwork procedures, contributing to a shortened construction period ■ Shipping available from 18 factories nationwide, from Hokkaido to Okinawa *For more details, please download the PDF or feel free to contact us.

  • Organic Natural Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration