[Sheet Metal Production Example] Assembly of a Valuables Locker
This is a glimpse of the final assembly process of our popular original product, the N-forme (N-Form) valuable item locker.
This is the assembly process of our original product, the "valuable item locker." We handle all processes in-house. Not only for standard products but also for custom-made items, we ensure quality manufacturing. In the final finishing process, we check the product quality based on production instruction documents such as drawings and parts lists before shipping.
- Company:仁張工作所
- Price:Other