FIT Power Construction Case: Coin Parking
The installation period is shorter compared to demolition work, allowing for consideration of the users as well.
Here is a case study where FIT Power was installed on the boundary wall of a coin parking lot. Due to the difficulty of dismantling for exhaust gas measures, and the desire to maintain as much parking space as possible, it was decided to use FIT Power for seismic reinforcement instead of a retaining wall, which would have a large protrusion and reduce space. The protrusion on the site-side angle is about 65mm, allowing for seismic reinforcement while maintaining the parking space. [Case Overview] ■ Issues - Dismantling is difficult due to exhaust gas measures, and we want to maintain as much parking space as possible. ■ Results - The protrusion on the site-side angle is about 65mm, allowing for seismic reinforcement while maintaining the parking space. *For more details, please refer to the related links or feel free to contact us.
- Company:大林 本社
- Price:Other