World's first temperature correction function, industry's first PC transfer, built-in printer, 400 data registrations.
● Air Tightness Test
This is a test for the completion inspection of piping work, using pressurized air (2–10 kPa) supplied by a pump.
● Temperature Compensated Air Tightness Test
This is an air tightness test that automatically compensates for temperature effects.
● Leakage Test
This is an inspection conducted at the start of gas supply, for checking supply and consumption equipment, utilizing gas pressure of 1 kPa or more.
● Temperature Compensated Leakage Test
This is a leakage test that automatically compensates for temperature effects.
● Logger Measurement
Pressure values are sequentially measured every hour for up to 24 hours, registered, and printed.
● Current Pressure
This measures the instantaneous pressure value. Registration and printing are done for only one point.