Heatstroke prevention measures: Renovation for factories and warehouses (from investigation to construction)
Heat stroke measures, building maintenance, disaster prevention, labor accident measures, hygiene measures - Renovation for factories and warehouses (from investigation to construction).
Renovation for Factories and Warehouses (From Investigation to Construction) 【Heat Stroke Prevention】 - On-site Investigation Investigate the interior of the building, identify the main causes of heat, and propose effective countermeasures. - Example Measures Installation of high-performance aluminum heat insulation material "Keep Thermo Wall." Cut radiant heat from roofs exceeding 50°C. Indoor temperature reduced from 40°C to 32°C (outside temperature 32°C). 【Building Maintenance】【Disaster, Labor Accident, and Sanitation Measures】 - Roof, Exterior Wall, and Floor Painting High-durability fluororesin coating, forklift overturn prevention measures, disaster emergency roof signage. - Fireproof Coating 2-hour fire resistance construction for disaster response. - Safety Measures Ultra-durable hard coat film. - Virus Disinfection, Antibacterial, and Mold Prevention Contact infection prevention sheets, antiviral paint. - Soundproofing Measures Soundproofing for equipment and emergency staircases. - Energy Conservation Measures Factory energy-saving diagnosis. *For more details, please refer to the PDF document or feel free to contact us.*
- Company:アイベック
- Price:Other