Utilizing the existing main body and frame as they are! A case where the work was completed without obstructing the passage of the fork.
We received a request from a customer stating, "The window of the sheet shutter has deteriorated over time and is dirty, making it difficult to see through, which is not good for safety. However, due to budget constraints, we cannot completely replace the sheet shutter and would like to only replace the sheets."
Therefore, we decided to utilize the existing body and frame and only replace the sheets.
Measuring and creating each sheet took time, but due to high traffic, it was difficult to work during operation. After consulting with the customer, we managed to split the work into the lunchtime break when the factory was stopped.
【Case Overview】
■ Industry: Manufacturing
■ Subject: Sheet Shutter
■ Request Details: Replacement of Sheet Shutter
■ Construction Duration: 3 days
*For more details, please refer to the PDF document or feel free to contact us. Key service areas: Mie Prefecture, Kitasei District, Chusei District (surrounding Mie).