We provide consistent support from preliminary surveys and analysis to construction! We contribute to speedy responses and cost optimization even within short construction periods and limited budgets.
Do you have any concerns at the site of asbestos removal and demolition work?
- The construction period is short...
- The budget is limited...
- The preliminary survey and the construction company are separate and cannot coordinate well...
Our company handles "everything from preliminary asbestos surveys and analysis to construction" for asbestos removal work, providing comprehensive support even within limited time and budget, including detailed analysis and selection of appropriate methods and execution.
*Support is also available from the design stage of the construction based on the survey.
The "Water Clean Method" generates ultra-high-pressure water using a water jet pump and performs simultaneous [wetting], [spraying], [stripping], and [suction] with a special simultaneous suction attachment, making it an environmentally friendly technology that strips asbestos-containing finishing (exterior wall) coatings while preventing scattering.
If you are having trouble with asbestos removal, please feel free to consult us.
[Features]
■ Consistent support from preliminary asbestos surveys to construction
■ Does not pollute the environment as it uses only water
■ Can prevent scattering during construction by powerfully sucking up wastewater and stripped materials simultaneously
■ Removes a wide range of coatings, including soft, elastic, and hard films
*For more details, please download the materials or feel free to contact us.