【Construction Achievements of Parking Lots for Apartment Buildings】 Self-parking Multi-story Parking Lot Yuuken Park (4)
Introducing a case study of a self-parking lot for apartments surrounded by security fences for safety!
We would like to introduce a case study of the self-driving multi-story parking lot, Yuuken Park. It has been finished with a chic color fence that matches the exterior of the apartment building. The doors leading to the external stairs of the elevator shafts on each floor display the floor number. The stairs are equipped with non-slip surfaces. Additionally, for safety reasons, a prevention fence has been installed under the structural floor of the first floor. 【Overview】 ■ Completion Date: May 29, 2015 ■ Location: Kasuya District, Fukuoka Prefecture ■ Type: 4-story, 5-tier continuous sloped parking system ■ Use: For residential apartments ■ Construction Area: 4,667.58 m² ■ Capacity: 258 vehicles *For more details, please refer to the PDF document or feel free to contact us.
- Company:雄健工業 東京支店
- Price:Other