We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for construction.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

construction Product List and Ranking from 168 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

construction Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

  1. 原田鉄工 Hiroshima//Manufacturing and processing contract
  2. イワタ Saitama//Building materials, supplies and fixtures
  3. 小森安全機研究所 Saitama//Industrial Machinery
  4. 4 双日マシナリー 環境・生活産業システム本部 Tokyo//Trading company/Wholesale
  5. 5 シーアンドエス セールス部門 Tokyo//others

construction Product ranking

Last Updated: Aggregation Period:Oct 01, 2025~Oct 28, 2025
This ranking is based on the number of page views on our site.

  1. Regarding substrate preparation using ISO Sa2.5 blasting. 原田鉄工
  2. Vacuum Thermal Decomposition Resin Cleaning Furnace 'VACUCLEAN' 双日マシナリー 環境・生活産業システム本部
  3. Pest Control Construction "Pest Control Magnet Sheet" [Ideal for areas where sealing gaps is difficult!] シーアンドエス セールス部門
  4. 4 One-touch installation by simply inserting the pipe! Air piping "Air Liner" 日東工器
  5. 5 Balcony waterproofing FRP drain "Iwata Drain F-1" - Easy installation & construction イワタ

construction Product List

76~90 item / All 272 items

Displayed results

[2×4 Housing Construction Achievements] After-school facilities in Shiga Prefecture

The cedar stud is flying with a truss span of about 8 meters, and the second floor has a spacious area!

We would like to introduce our construction achievements of 2×4 houses at after-school facilities in Shiga Prefecture. The total floor area is 140.78m². It features cedar studs and a truss with a span of approximately 8m, creating a spacious second floor. Please feel free to contact us when you need our services. 【Case Overview】 ■Construction Period: September 2021 ■Total Floor Area: 140.78m² *For more details, please refer to the related links or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The dwelling of the healer.

Unique technology that suppresses oxidation! Please achieve a healthy and comfortable life in a living environment that is less prone to "rust."

"Iyashiro no Sumai" improves residential environments with excessive active oxygen through a unique combination of technologies that suppress oxidation. Just as iron rusts, the human body also "rusts," leading to the promotion of diseases and aging. One of the "Four Principles of Healthy Housing," the "Antioxidant Measures," mitigates the effects of active oxygen, creating an environment that is less prone to "rusting." 【Four Principles of Healthy Housing】 ■ Enhance thermal properties ■ Focus on natural materials ■ Implement antioxidant measures ■ Design for health and comfort *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hangtou reinforcement bar construction 【*Integrated manufacturing and construction system】

Reduce troublesome adjustments at construction sites! Restructure processes with anchor sets according to the situation to shorten construction time. Manage complex pile head reinforcement work as a whole.

If you are concerned about the interference between anchor bolts and reinforcement bars, leave it to Otsu Iron Works. By carrying out the anchor set construction together, not only can we coordinate everything from the pile head reinforcement work to the anchor installation work at once, but we can also handle adjustments between construction workers, eliminating troublesome adjustments at the construction site. Additionally, we can rearrange the processes of pile head reinforcement and anchor set construction according to the situation, which can lead to a reduction in construction time. We can also manage complex pile head reinforcement work, including pile studs, pile head gold welding, New J-BAR, NCP anchors, and FT caps, all at once. [Reasons to choose Otsu Iron Works for construction] 1. Simultaneous construction with anchor sets allows for complex inter-vendor adjustments. 2. Reduction in construction time. 3. Comprehensive management of complex pile head reinforcement work. *Please feel free to contact us for more details.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction and civil engineering related hardware installation [*Integrated manufacturing and installation system*]

We carry out construction work such as on-site arc welding, gas cutting, and miscellaneous metalworking, as well as the fabrication and installation of steel frames and metal products.

At Otsu Ironworks, we carry out construction work including arc welding and gas cutting on-site, as well as the fabrication and installation of steel frames and metal components. Additionally, we interpret the provided design drawings and create construction drawings to ensure that the installation work can proceed smoothly, taking into account the preceding and subsequent processes on-site. With our experienced and proven personnel who have worked on numerous projects, we can cater to the diverse needs of our clients. 【Construction Menu】 ■ Seismic, vibration isolation, and damping construction ■ Concrete embedded metalwork ■ Parking lot ancillary work ■ Pile anchor bolt method ■ Column steel plate wrapping ■ Steel frame construction for system buildings 【Reasons to choose Otsu Ironworks for your construction needs】 1. We interpret design drawings and create construction drawings for proposals. 2. Our personnel have extensive experience and proven track records. 3. We are capable of high-precision construction. *Please feel free to contact us for more details.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solar panel mounting and pile installation [*Integrated manufacturing and construction system*]

Based on our extensive experience and track record in handling the installation of solar mounting systems on various conditions (such as walls and slopes), we offer proposals tailored to your needs!

Installation of solar panel mounting structures by Otsu Iron Works! We can coordinate everything from panel layout and design to construction, so you can trust us with your project. Depending on the situation, we will propose a combination of our own and other companies' products. 【Examples of Construction Achievements】 ■ Ground-mounted structures (concrete foundation) - Truss structures… customizable in terms of number of tiers and angles - Lightweight structures… excellent cost performance and quick installation ■ Ground-mounted structures (pile foundation) - OT screw piles… piles that utilize the strength of the ground. Easy to install and remove - Steel pipe piles… effective in areas with low pull-out strength. Can be installed even in hard rock areas ■ Flat roof structures… possible at high elevations! Custom design to fit roof shapes ■ Aluminum structures (high corrosion resistance, high strength, lightweight)… high strength due to corrosion-resistant and thick-walled construction ■ Standing seam roof structures… bolt-fixed to prevent detachment due to strong winds or earthquakes ■ Parking lot structures… effectively utilizing parking lots as power generation sites ■ Special custom-made structures… designed and constructed to meet various conditions *For more details, please feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel structure construction [*Integrated manufacturing and construction system*]

From steel frame construction of public buildings, offices, factories, and stores made of heavy and light steel frames, to the fabrication of steel staircases that match the buildings!

At Otsu Iron Works, we undertake construction projects that involve the processing and assembly of steel materials such as shaped steel and steel plates to create structures. We have experience in steel construction for public buildings, office buildings, factories, and stores, both in heavy steel frame and light steel frame. We also welcome inquiries for custom-made products and creative metalwork. 【Reasons to choose Otsu Iron Works for your construction】 1. Selection of factories based on the scale of construction and manufacturing difficulty. 2. Capable of handling steel fabrication at J-grade to H-grade factories. 3. Comprehensive management from production to on-site construction (erection, final tightening, welding work) through Otsu Iron Works' network. *Please feel free to contact us for more details.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Benefits of installation without slope!! Drain pump + hose installation

Anyone can install it, and there are extremely few construction defects!! A new drainage piping installation method that does not require a slope: 'Drain Pump + Hose Installation'

What are the benefits of the "drain pump + hose installation" that does not require a slope? In traditional "PVC piping installation," a drainage method utilizing natural slope is employed. Designing and constructing piping routes that ensure the necessary slope for drainage requires specialized knowledge and extensive experience, making it a time-consuming process. There is also a concern about water leaks due to construction defects at the numerous adhesive joints. If there is a mistake in the design, it is not easy to change the piping route on-site. If time-consuming processes are required again, extending the construction period becomes unavoidable. In contrast, the "drain pump + hose installation" uses the power of the pump to discharge water without requiring a natural slope. The installation does not need a slope; it simply involves installing the pump and connecting an insulated hose to the drainage point. Since no specialized knowledge or experience is needed, the installation is straightforward. The process is minimal and does not take much time. Additionally, hose piping has no adhesive joints, significantly reducing the risk of construction defects. As mentioned earlier, even if there is a design mistake, the piping route can be flexibly changed on-site without affecting the construction schedule. The reason there are many repeat customers is due to these advantages.

  • Other pumps

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Aichi Real Estate Consultants

Here is an example of a stylish and clean space that we designed!

We would like to introduce a construction case for Aichi Real Estate Consultants. We have laid out the three elements of office space, meeting space, and seminar room within a limited area with an easy-to-use flow. Additionally, the layout of the handwashing and kitchen areas is designed to ensure that both employees and clients do not feel cramped. 【Case Overview】 ■Company Name: Aichi Real Estate Consultants ■Area: 38 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Our Break Room and Golf Room

We will introduce a case where a café space was created in a warehouse that had been used as a storage area!

We would like to introduce examples of construction in our company's break room and golf room. The golf room was created as a showroom for proposals to customers, and to enable staff to experience it for better suggestions. Now, this space has also contributed to enhancing communication among staff. 【Case Overview】 ■Company Name: Takeichi Wind Nagoya Co., Ltd. (Our company's break room and golf room) ■Area: Café 12 tsubo, Golf 22 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Nakao Construction Industry Co., Ltd. Headquarters

A case where a plan was developed to create an office that promotes active communication among employees!

We would like to introduce a construction case study for the headquarters of Nakao Construction Industry Co., Ltd. In a warehouse exceeding 100 tsubo that was once a staff dormitory, we removed the partitions to create a spacious open floor area. Within this open floor, we installed a glass-walled see-through conference room, which serves as an accent for the space while gently dividing the individual desks. [Case Overview] ■ Company Name: Nakao Construction Industry Co., Ltd. Headquarters ■ Area: 202 tsubo *For more details, please refer to the related links or feel free to contact us.

  • Other services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We accept design, manufacturing, and construction of canned products.

Durable and beautiful exterior finish! We can also accommodate requests for plating and specified film thickness.

We accept the design, production, and construction of fabricated products. We can also respond to requests such as "only need fabricated products without a soundproof room." We offer a durable and beautiful finish through baked painting, and we can accommodate requests for plating and specified film thickness. 【Examples of Production】 ■ Decks and Handrails ■ Stairs and Monkey Ladders ■ Equipment Stands and Mold Storage Shelves ■ Indoor Deck Plates ■ Safety Covers (Shafts and Drive Parts) ■ Exhaust Hoods and Dust Collection Hoods ■ Ceiling Cranes and Frames *For more details, please refer to the PDF materials or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-temperature resistant heater for ceramic polyimide heater installation.

Heater that can be attached to brittle materials such as ceramics and curved surfaces.

In general, the adhesive used to attach the heater to the heating target is the limiting factor that determines the heat resistance temperature. Our company can adhere the heater to the object without using conventional adhesives thanks to our unique attachment technology. Additionally, during thermal pressing, we use a special processing furnace instead of a mechanical press, conducting the process in a high-temperature gas pressure environment. As a result, there is no excess load, making it suitable for application on brittle materials such as ceramics. Due to the gas pressure, attachment is possible not only on flat surfaces but also on curved surfaces.

  • Other FA equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Aitec Co., Ltd. Business Introduction

We will undertake it at a low cost with our unique know-how.

Spindles, as well as robot jigs, are diverse and varied. We can instantly produce painting jigs and provide services tailored to customer needs, from design to creation, using injection molding, NC lathes, and collaboration with specialized factories. 【Main Services】 ■ New painting equipment installation, design, and construction ■ Repair, modification, design, and construction of existing equipment ■ Control equipment, construction, and sales ■ Various sales of intake and exhaust filters ■ Sales of coagulants, single-component, two-component, and UV specifications ■ Cleaning of painting booths and fans *For more details, please download the PDF or feel free to contact us.

  • Other safety equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Example】Fresh Produce Distribution Center

Many achievements in snow-covered areas! Introducing examples of design and construction of low-temperature response systems!

We would like to introduce a case study of the design and construction of a low-temperature compatible system building. This system not only accommodates high quality, low cost, and short construction periods but also has numerous achievements, balancing usability and cost performance. 【Construction Case】 ■ Yokohama Marunaka Seika Co., Ltd. Southern Market Distribution Center (Kanagawa Prefecture) ・ Construction: Hishiju Cold Chain Co., Ltd. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Biomass Power Plant

Many achievements in snow accumulation areas! Introducing examples of design and construction by Kawada System Architecture!

Here are examples of projects where the Kawada system architecture was designed and constructed. This system not only accommodates high quality, low cost, and short construction periods, but also has an experienced design team to assist with planning. 【Construction Examples】 ■ Monbetsu Biomass Power Plant (Monbetsu City, Hokkaido) Chip factory, yard building, solidification curing building ■ Client: Monbetsu Biomass Power Co., Ltd. Okhotsk Bioenergy Co., Ltd. (Sumitomo Forestry, Sumitomo Joint Power) ■ Power Plant Construction: Sumitomo Heavy Industries, Ltd. ■ Factory Yard Construction: Kawada Industries, Ltd. *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration