[Heat Stroke Prevention Measures Case Study] Vaccination Concentration Venue
A pleasant space with cool air flowing! A case study of introducing an integrated "Spot Bazooka" that requires almost no construction.
This is an introduction to the case of introducing "Spot Bazooka" at the concentrated vaccination site in Ayagawa Town, Kagawa Prefecture. The gymnasium was suddenly designated as a vaccination site, but since air conditioning was not installed, measures against heatstroke and high temperatures were necessary during vaccinations in the summer. Therefore, eight integrated units of the "Spot Bazooka," which require almost no construction, were introduced. The units were delivered in June during the rainy season, and during the trial operation, a refreshing cool breeze with reduced humidity was blown out, which seemed to satisfy the mayor and the townspeople. [Overview] ■ Installation location: Concentrated vaccination site in Ayagawa Town, Kagawa Prefecture ■ Installed product: Eight integrated units of "Spot Bazooka" *For more details, please refer to the PDF document or feel free to contact us.
- Company:イーズ 本社
- Price:Other