Connection method with the tube of the "Nano Link System".
The development of conversion and welding parts has improved design flexibility!!
The Nano Link System developed by our company aims to solve various issues such as large dimensions of joints that have been widely used until now, the labor-intensive construction, and the management and maintenance after construction. It features a simple connection structure that only requires clamping with our unique sealing ring, achieving stable sealing performance, low pressure loss, excellent liquid replacement characteristics, and low particle generation. It also allows for direct connection between devices, contributing to compact equipment design and reduced assembly time. When assembling equipment, we introduce three options for using tubes when connecting distant locations. The development of conversion parts and welding parts enables fine adjustments on-site. By selectively using these options based on specifications, the design flexibility is expanded, allowing you to further appreciate the excellent workability of the Nano Link System. 【Three Options for Tube Connection】 1) Standard Tube Parts 2) Conversion Parts (Fitting Adapter Flowell 80 Series) 3) Welding Parts *For more details, please refer to the PDF materials or feel free to contact us.
- Company:淀川ヒューテック
- Price:Other