Waterproof sleeve for underground and outer walls "Pipe-in-Sleeve" (abbreviated as PIS) Construction site labor-saving! Improvement of building waterproof performance!
In the underground wall section (underground beam sleeve), waterproof treatment is applied in advance at the factory to the space (gap) between the PVC sleeve and the FEP, and it is prefabricated for the site. No cumbersome work is required on-site; after the PIS installation, basically only joint connections are needed. Stable waterproofing is ensured! This achieves work efficiency and promotes flood prevention and water resistance. It is an innovative and advanced product for underground beam sleeve construction.
<Features>
■ Excellent waterproof performance [Flood prevention and water resistance promotion]
■ Proposal for labor-saving at construction sites
■ Adaptable to individual design specifications of construction projects
■ Improved work efficiency, standardized quality, and enhanced maintainability
[To Designers and Contractors]
FEP pipe through-piping, bell mouth terminal installation, connection of different types of pipes (AQ type), and various connection parts for Eflex can be arranged to match the specifications of individual construction sites! Furthermore, it can also respond to unexpected water leaks! It combines maintenance and serviceability, making it a versatile and highly adaptable product. (Feel free to request drawings)
*For details, please contact us below or download the PDF data from the "Ipros site"