[Construction Example] System Building Hazardous Material Warehouse (Chiba Prefecture)
Introducing a construction example of a warehouse that uses spankrete for the exterior walls!
We will introduce examples of "system construction" that allows for the selection of suitable roofs, walls, and structures based on the purpose and size of factories and warehouses, as well as regional environmental factors, achieving short construction periods and low costs. In a hazardous materials warehouse located in Chiba Prefecture, spank concrete was used for the exterior walls of four hazardous materials warehouses. 【Construction Example】 - Completion Date: August 2014 - Location: Chiba Prefecture - Total Floor Area: 1,451 m² (438.92 tsubo) *For more details, please download the PDF or feel free to contact us.
- 企業:川田工業 建築事業部
- 価格:Other