[Construction Example] Super Sol Disaster Recovery Work
There are case studies of construction work for disaster recovery! No curing period is required, allowing for a shortened construction time.
We would like to introduce a case of construction work for disaster recovery using Super Sol conducted by our company. To proceed with construction quickly, it is essential to ensure the timely delivery of materials, transportation to the site, workability, material costs, and stable supply of materials. "Super Sol" can be combined with crushed stone (such as excavated soil) to reduce costs. It can be constructed using standard earthwork procedures, contributing to a shortened construction period. We have examples of disaster recovery work, tsunami evacuation road widening projects, and mixed lightweight soil and sandwich-type construction. Please take a look at our catalog. 【Benefits】 ■ Shortened construction period (no curing time required) ■ There are case studies of construction in disaster recovery work ■ Cost reduction is possible by combining with crushed stone (such as excavated soil) ■ Can be constructed using standard earthwork procedures, contributing to a shortened construction period ■ Shipping available from 18 factories nationwide, from Hokkaido to Okinawa *For more details, please download the PDF or feel free to contact us.
- Company:ガラス発泡資材事業協同組合
- Price:Other